Application for Amend to Licenses DPR-44 & DPR-56 Requesting Revision of Tech Specs to Permit Purging of Primary Containment Through Reactor Bldg Ventilation Exhaust Sys When Specified Conditions Exist
ML19294A963
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/19/1980
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19294A961 List:
References
NUDOCS 8002260498
Download: ML19294A963 (6)


Text

q BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of Docket Nos. 50-277 PHILADELPHIA ELECTRIC COMPANY 50-278 APPLICATION FOR AMENDMD4T OF FACILITY OPER ATING LICENSES DPR-44 f. DPR-56 Edward G.

Bauer, Jr.

Eugene J. Bradley 2301 Market Street Philadelphia, Pennsylvania 19101 Attorney s for Philadelphia Electric Company 8002260 Ypg

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of Docket Nos. 50-277 50-278 PHILADELPHIA ELECTRIC COMPANY APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Philadelphia Electric C omp a ny. Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Units 2 and 3

hereby requests that the Technical Specifications contained in Appendix A of the Operating Licenses be amended by revising section 3 8.C.9 as indicated by a vertical bar in the marcin of attached page 209.

Page 209a is added due to redistribution of naterial on the revised page.

The present Technical S pe c i f i ca t i ons requires purging of the containment through the Standby Gas Treatment System (SGTS).

The p rop osed revision would pe rmit purging of the primary containment

t through the Reactor Building Ventilation Exhaust systen when the same conditions that permit breaching the primary containnent integrity exist.

These conditions require the react or t o be in the cold shutdown condition and the p rima ry system depressurized thus mitigating the potential f or a radioactive release.

The SGTS provides a c ommon p os t accident filtration system for both Peach Bottom units.

The above revision to the Technical Specifications is requested to eliminate a p ot en t ia lly adverse impact on the availability of the SGTS for the operatinc. unit when certain planned maintenance and construction activities are in progress on the Unit that is shutdown.

It is anticipated that Peach Bottom Unit No. 2 and No. 3 suppression chambers (t orus )

will need t o be dewater.d during future refueling outages to accommodate structural improvements and coating repairs to the torus.

The coating activities will generate significant quantities of volatiles that w ou ld rapidly reduce the abs o rp t i on capabilities of the charcoal filters in the SGTS.

Capability to e xh a u r. t to the React or Building Ventilation Exhaust system would e li mi n a t e unnecessary restriction of the SGTS required for the operating unit.

Portable filtration u ni t s or other ap p r op ria t e measures will be utilized to control airborne activity in the suppression chamber.

The p rop os ed amendment involves a single safety issue deemed not to involve a significant hazards consideration-the ef ore,

pursuant to the requirements of 10 CFR 170.22, " Schedule of Fees for Facility License Amendment", Philadelphia Electric Conpany p rop os es that this Application for Amendment be considered a Class III Amendment for Unit No. 2 and a Class I for Unit No.

3.

The Plant Operation Review Committee and the Operation and Safety Review Committee have reviewed this p rop os ed change to the Technical Specification and have concluded that it does not involve an unreviewrd safety question or a significant hazards consideration and w.11 not endanger the h ealt h and safety of the public.

Respectfully submitted.

PilIL AD EL P HI A ELECTRIC COMPANY Y>

f l--

By s

Senior"Vice'Phsid}nt e

s

.e COMMONWEALTH OF PENNSYLVANIA es.

COUNTY OF PHILADELPHIA V.

S.

Boyer, being first duly sworn, d ep os e s a t, d says:

That he is Senior Vice President of Philadelphia Electric C omp any, the Applicant herein: that he has read the foregoing Application f or Amendme nt of Facil.'ty Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are t ru e and c orrect to the best of his knowledge, information and be li ef.

X*

(/

Subscribe 4 and sworn to before ne thic Ib day 386

., [ N o ary P b i f

EU AGETH H O'e r e

c. mm. mm c.

My cc,=sen e#aa Jan. a. E2

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of supervisors, Peach Bottom Township, York Coun ty, Pennsylvania, by mailing a copy thereof, via first-class mail, tJ Albert R. Steele, Chairman of the Board of Supervisors, R. 9. No.

1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K.

Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P. Bolton, Chairmat. l the Board of Supervisors, P.

D.

No.

1, Holtwood, Pennsylvania 17532; all this 19th day of

February, 1980.

'f

'\\of}.

pybj 4 /W Sj Eugenej J. Bradley

(

Attorney for Philadelphia Electric Company