ML19318A032

From kanterella
Revision as of 21:08, 1 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Insp Repts 50-324/80-10 & 50-325/80-11. Procedure Will Be Implemented by 800701 to Assure That All Procedures Are Revised to Reflect Newly Installed Valves within Two Wks of Being Declared Operational
ML19318A032
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/10/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-80-993, NUDOCS 8006180365
Download: ML19318A032 (2)


Text

p )/st/ Nb

~

J" U d Carolina Power & Light Company l

c--- r -

,_ m en Brunswick Steam Electric Plant P. O. Box 10429 Southport, N. C.

28461 June 10, 1980 PILE: B09-13514 SERIAL: ESEP/80-993 Mr. James P. O'Reilly, Director.

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 & 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 SUPPLEMENTAL RESTONSE TO IE INSPECTION REPORT 50-324/80-10 AND 50-325/80-11

Dear Mr. O'Reilly:

In reference to our initial response to IE Inspection Report 50-324/80-10 and 50-325/80-11 dated May 12, 1980, and a subsequent telephone conversation on May 22, 1980, between Mr. W. H. Miller, Jr. of your office and Mr. A. C, Tollison, Jr.,

General Manager, Brunswick Steam Electric Plant, the following additional infor-mation is being provided:

A procedure is being developed and will be implemented by July 1,1980, to assure that all procedures, except periodic tests with a periodicity of monthly or greater, concerning newly installed valves covered under Technical Specification 4.7.7.1.lc are revised to reflect those valves within two weeks of their being declared operational. All periodic tests with a periodicity of monthly or greater will be revised to reflect those valves prior to their first required performance following the two week revision period.

O e

) Cool

}

800618036[

\\

Mr. James P. O'Reilly June 10, 1980 If you have any additional questions on this matter, please feel free to contact me or members of my staff.

Very truly yours, A. C. To111 son, Jr., General Manager Brunswick Steam Electric Plant RMP/bd cc: Mr. R. A. Hartfield Mr. V. Stello S

9 9

4 e

w

_