Forwards Response to NRC 800610 Request for Info Demonstrating Ability of Getr to Meet Loadings Associated W/ Design Bases Specified in NRC 800523 Safety Evaluation.Six Consultant Repts Encl
ML19321A021
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 07/17/1980
From: Darmitzel R
GENERAL ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
Shared Package
ML19321A022 List:
References
NUDOCS 8007220349
Download: ML19321A021 (3)


Text

-%-

_ ~..

z GENER AL h ELECTRIC

" * "^" '""""

ENGINEERING GENERAL ELECTRIC COMPANY P.O. BOX 460, PLEASANTON, CALIFORNIA 94566 DIV1SION July 17,1980

(

. w OFMCIAL -

8 ; ?f & m m: GA C. CACG V

Mr. Robert A. Clark, Chief d ba%y@

'd somw rutue. cAuroau Operating Reactors Branch #3 l Of AuwmA ccumy Division of Licensing Ry cen.m. egires ?#R S, T 2 U.S. Nuclear Regulatory Commission

~ ~'

Washington, D.C.

20555

Subject:

Investigation of the ability of the General Electric Test Reactor (GETR) a meet the loadings associated with the design basis specified in the Safety Evaluation Report of May 23,1980.

License TR Docket 50-70

Reference:

Letter, Robert A. Clark to Robert W. Darmitzel dated June 10,1980

Dear Mr. Clark:

Your June 10, 1980 letter requested additional information< demonstrating the ability of the GETR, in luding all essential structures, systems and components, to meet the loadings associated with the design bases specified in the Safety Evaluation Report (SER) of May 23, 1980.

Much of that infor-mation is included in reports previously submitted to the Nuclear Regulatory Commission.

The attached response integrates the results produced in those and several recent analyses that have been done to sh7w the facility meets the design bases noted in the May 23, 1980 Safety Evai tion Report.

The system requirements to mitigate the maximum postulated seismic event are few and relatively straightforward to accomplish.

These have been described in previous submittals and are:

the reactor must be shut down and kept down, and the fuel elements must be kept covered with water. The reactor is shut down by pendulum switches acting well in advance of conse-quential vibratory motion, and analysis shows the control rods to remain in the reactor through the design basis event.

The fuel elements are kept covered with water by assuring integrity of the containers in which the fuel elements are located (reactor pressure vessel and canal storage tank) i and by providing a water supply for the small amount of water makeup needed for boil off and evaporation. Modifications have been added (principally, J

piping restraints) to assure integrity of the reactor pressure vesse'. A new canal' storage tank designed to provide substantial physical protection and modifications to potential missile-generating equipment on the third floor of the reactor building assure the integrity of the canal storage tank.

A new redundant water supply has been designed and partially constructed that assures water makeup for boil off and evaporation.

The water in the THIS DOCUMENT CONTAINS P00R QUAL.lTY PAGES

.,800.722o3 %

t 3

a GENER AL D ELECTRIC

'Mr. Robert A. Clark July 17,1980 L

pool and canal are not counted on for long-term supply, nor is the con-tainment integrity a requirement. Analysis'results, however, show the pool and canal to remain intact.

The information contained in the attached reports shows that the GETR, including all' essential-structures, systems and components, meets the loadings associated with the design bases specified in the May 23, 1980

- Safety Evaluation Report. It is expected that a structural Safety Evalu-ation Report can-be written and issued promptly.

Very truly yours, php

(~";c) 1, ~~ cr r:,;i AL

., - i. ; A '-. O '

..- s 6

..y emc.a r rucue. cAu x,

e--

R. W. Darmitzel, Manager

'hih

..,;f'# 3,, SN e nj Irradiation Processing Operation K_,;

,a,.nn, -

=~

/11 attachments m

AFFIRMATION b

The General Electric Company hereby submits the following six (6) reports i

(attached), titled:

i e

'(1) Summary Report - Structural Seismic Investigations of General Electric Test Reactor, dated 8 July 1980.

(2) Additional Investigations to Determine Effects of Vibratory Motions Due to an Earthquake on the Calaveras Fault, dated 30 April 198C (Rev.1 - 30 June 1980)

(3) Expanded Description of Soil Pressure Analyses - Supplement No.1 to Additional Investigations to Determine the Effects of Combined Vibratory Motions and Surface Rupture Offset Due to an Earthquake on the Postulated Verona Fault, dated 27 June 1980 (4) Evaluations for 0.6g Ground Acceleration Case - Supplement No. 2 j

to Additional Investigations to Determine the Effects of Combined Vibratory Motions and Surface Rupture Offset Due To An Earthquake on the Postulated Verona Fault, dated 30 June 1980 1

(5) Review of Seismic Adequacy of Piping and Equipment, General Electric Test Reactor, dated 30 June 1980

-(6) Combined Parameter Probability Analysis, General Electric Test Reactor, dated July 11, 1980 i

To the best of my knowledge and belief, the information contained therein

'is accurate.

IM[

05YCi1L : '

~

/'

J.

b R. W. Darmitzel, Manager M; N Mr^uchic@((

, A1AMEM COUm f

[

Irradiation Processing Operation

,___' ' My comm. errires A'AR 't,

  • P

_ w.-

Submitted and sworn before me this 17th day of July,1980.

L 4Lpu d b

%d4o

, Notary Public in and for the

/

County of Alameda, State of California.