BSEP-80-1219, Forwards Revised Training Instructions 200,201 & 202 to Include Program Changes Required by NRC Re Qualifications of Reactor Operators

From kanterella
Revision as of 08:11, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revised Training Instructions 200,201 & 202 to Include Program Changes Required by NRC Re Qualifications of Reactor Operators
ML19327A522
Person / Time
Site: Brunswick  
Issue date: 07/28/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML19327A523 List:
References
BSEP-80-1219, NUDOCS 8008060323
Download: ML19327A522 (2)


Text

.

E 1

4 b

= 2:.

Ts

.,.:ee,

, v: ::

24, Brunswick Steam Electric Plant P. O. Box 10429 Southport, N. C.

28461 July 28, 1980 FILE: B10-14220 SERIAL: BSEP/80-1219 Mr. Paul F. Collins - Chief Operator Licensing Branch Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Collins:

Enclosed please find Brunswick Steam Electric Plant's Training Instructions (TI's) - 200, 201, and 202, revised to include the program changes required by the NRC (Denton) letter of March 28, 1980, on the subject " Qualifications of Reactor Operators."

If you have any questions on these changes, please contact Mr. M. A. Jones at (919) 457-9521, extension 329.

Very truly yours, h

A'ac A. C. Tollison, Jr., General Manager Brunswick Steam Electric Plant MAJ/mcg Enclosures (voo3

.s 1//

3o08080323 y

t 1

i 1

1 i

I Requirement Training Instruction Section l

.A.2.a 202 2.0.e l

'A.2.b 201 2.1 A.2.c 201 2.2.c.4, 2.2.j, 2.2.k 202 2.0.f, 2.0.g, 2.0.h i

A.2.d/A.2.e 201 2.2 202 2.0 200 Appendix A C.' 1 200 Appendix A, XIV and XV C.2 200 Appendix A C. 3 -

200 Appendix A 9

e 4

_ _ _ _ _ _ _ _ _ _