4 POWER DISTRIBUTION LIMITS O
SURVEILLANCE REQUIREMENTS (Continued)
When the F[ is less than or equal to the FR 2.
limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF and Fxy at least x
once per 31 EFPD.
~
shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes e.
The F l
1.
FRTP < 1.71 for all core planes containing bank "D" control rbs,~and 2.
For all unrodded core planes:
F
$ 1.68 up to core elevations of 2.4 ft.
l = 10 FhTP $ 4=M for core elevations from 2.4 f t.
to 7.2 ft.
RTP F
5 1.61 for core elevations above 7.2 ft.
xy f.
The F limits of e, above, are not applicable in the following core hane regions as measured in percent of core height from the bottom of the fuel:
1.
Lower core region from 0 to 15%, inclusive.
2.
Upper core region from 85 to 100%, inclusive.
3.
Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%,
60.6 + 2% and 74.9 + 2%, inclusive.
l_
4.-
Core plane regions within
-2% of core height ( 2.88 inches) about the bank demand position of the bank "D" control rods.
C b
g.
With F exceeding F the effects of F on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 t.
q 4.2.2.3 When F (Z) is measured pursuant to specification 4.10.2.2, an q
overall measured F (Z) shall be obtained from a power distribution map n
and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.