Forwards IE Insp Rept 50-346/79-31 on 791203/07,10-14,17-21, 26-28 & 31.No Noncompliance Noted
ML19344D054
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/30/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19344D055 List:
References
NUDOCS 8003110148
Download: ML19344D054 (2)


See also: IR 05000346/1979031

Text

e

,7*pe" " Coq [,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

f

C

$

REGloN lli

o

5

"f

799 ROOSEVELT 90AD

%,

f

GLEN ELLYN, ILUNO,5 60m

.....

t

Docket No. 50-346

Toledo Edison Company

ATIN:

Mr. Richard P. Crouse

Vice President

Energy Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of this

office on December 3-7, 10-14, 17-21, 26-78, 31, 1979, of activities

at Davis-Besse Nuclear Power Station Unit 1 authorized by NRC Operating

License No. NPF-3 and to the discussion of our finding 6 with Mr. T. Murray

at the conclusion of the inspection on December 28, 1979.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such infor-

mation from public disclosure. The application must include a full

statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

8003 H o Il.H!I

.e

.

i

r. .

.g

Toledo Edison Company

-2-

We-will gladly discuss any questions you have concerning this

inspection.

Sincerely,

/

-

.

)

/

-'

/

F. Heishman, Chief

[I' Robert

I

Reactor Operations and Nuclear

Support Branch

Enclosure:

IE Inspection

Report No. 50-346/79-31

cc w/ encl:

Mr. T. D. Murray, Station

Superintendent

.rentral Files

Reproduction Unit NRC 20b

PDR

Local PDR'

3

!

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

4

J

l

-

_ - .

.

-

.

. , . _ . .

_

_ ,

- -______.~