ML19344F160

From kanterella
Revision as of 10:53, 24 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Quarterly Rept on Petitions for Rulemaking as of 800630 for Transmittal to PDR
ML19344F160
Person / Time
Issue date: 08/18/1980
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Scott S
NRC OFFICE OF ADMINISTRATION (ADM)
References
RULE-PRM-000 NUDOCS 8009120492
Download: ML19344F160 (24)


Text

.

/** "'4g

/

o UNITED STATES

[

  • 3,y j

NUCLEAR REGULATORY COMMISSION 3

i E

WASHINGTON D. C. 20555 f

/

/

I AUG j g g

MEMORANDUM FOR: Steve Scott, Division of Technical Information and Doc uent Control FROM:

J. M. Felton, Director Division of Rules and Records Office of Administration

SUBJECT:

TRANSMITTAL OF QUARTERLY PETITIONS FOR RULEMAKING REPORT Enclosed for transmittal to the Public Docuent Room is the quarterly report on petitions for rulemaking as of June 30, 1980. This report has been prepared in accordance with 10 CFR 12.802, and a notice will be published in the Federal Register soon announcing its availability in the Public Document Room for inspection an co ying.

J.

. Felton, Director Division of P.ules and Records Office of Administration

Enclosure:

As stated P

i

~

~

2 NRC PETITIONS FOR RULEMAKING JUNE 30, 1980 A. PETITIONS COMPLETED, APRIL - JUNE 1980 PRM Petitioner flutnber JFR Citation)

Subject Action j

i

. 2-7 Wells Eddleman To clarify 52.714 to explicitly comments by 4/9/79. Twenty-(44 FR 8043, allow a person newly arrived in one comments were received.

l 2/8/79) tha vicinity of a nuclear power Denial published in the j

t i

plant site, or an organization Federal Register 5/27/80 legitimately formed after the (45FR35345).

closing date for intervention j

petitions, to petition with good cause to intervene.

0 t

l l

?

I i

e

' g'

l l

I l

1

i

, 4 B. PETITIONS INCORPORATED IN PROPOSED RULES PRM Petitioner 4

Number (FR_ Citation)

Subject Action l 40-21 Natural Resources To require uranium alli oper-Comments by 7/14/75. extended

]i Defense Council, ators licensed by the Commis-to 8/28/75. Commission i

Inc. (40 FR 20983, sion or by an Agreement State response to petition 5/14/75) to post a perfomance bond published 6/3/76--Cornission that would cover the cost of determination to prepare stabilization and ultimate GEIS as basis for decision on' disposal of uranium mill rule. Regulations being tailings.

developed in close connection with GEIS will coyer financial I

surety as well a *echnical requirements concerning tailings disposal. The draft GEIS was issued in 4/79.

1 Incorporated in proposed I

rules (parts 30, 40, 70. 150, i

and 170) published 8/24/79 comments by 10/24/79.

Approximately 100 letters containing an estimated l

1.000 comunents have been received. Public hearings 1

on the G'cIS and proposed rule j

were held in Denver. Colorado.

and Albuquerque, New Mexico, j

in October 1979, 1

l P3th'itm0

" " - a 'Sa-i

)

l

s

-s-PRM Petitlener Number (FR Citation)

Subject Action i

50 State of New To amend regulations in Comments by 7/5/74. Six Jersey--Nuclear Apoendix E of 10 CFR Part 50 cossents were received.

Energy Council to apply to Commission Original petition had four (39 FR 15900, licensees who are not other-parts. The first part, on I

5/6/74,and wise subject to Appendix E reactor personnel qualifica-l l

39 FR 25535 and who receive, store, tion, has been withdrawn by 7/11/74).

possess, and/or distribute the petitioner. The second 4

t large quantitles of radio-part, on health physics per-i active materials; and to sonnel, was satisfied by I

eliminate the exclusion of regulatory guides (petitioner i

" Class 9 accidents" from agrees). An amendment to consideration in licensing Part 70 was published on procedures involving new or 6/27/75, which resolved J

novel siting or design another part of the petition..

i considerations.

Petitioner agreed that action

)

on the fourth part. Class 9 j

accidents, should await i

completion of the liquid 1

pathways study.

Incorporated i

in proposed rules (Parts 50 and 70), published 9/19/79 comments by 11/19/79.

)

l i

Task Leader:

F. Lomax. 050.

l (301)443-5966 i

f 1

i I

i

a.

PRM Petitioner tumber (FR Citation)

Sub.iect Action

~

50-17 ~ Boston Edison To amend Parts 2 and 50 with Comments by 8/13/76. Ten i

i Company, et al.

respect to the issuance of comments rece1ved.

Incorpor (41 FR 24006 amendments to operating rated in preposed rule 6/14/76) licenses for production and (Part 50) published 3/28/80, utilization facilities.

comments by 5/27/80. As of Under requested changes 6/20/80,8 letters of critaria would be specified comment were received on the for determining when a proposed rule. None of these proposed amendment to an comments fully supported the operating license involves proposed rule.

L no "significant hazards con-siderations" and could thus Target Data for Effective be issued without prior Rule: 12/15/80 i

public notice or hearing.

Task I,eader:

W. E. Campbell,

050. (301) 443-5913 4

i

+

71-1 Energy Research To exempt " low specific Comments by 11/25/75.

PRM's i

and Development activity material" from the 71-1 71-2, 71-3 and 71-4 l

3 Administration packaging requirements of were consolidated into a single t (40 FR 43517 Part 71. The petition rulemaking action to incorpo-i 9/22/75) from Diagnostics Isotopes rate internationally developed

($

')88 Corporation requests that IAEA transportation standards 7j)}7~3*

1 the radionuclide lead-201 into the domestic regulations.

{

7j 4 be included in Transport of both NRC and DOT. The Group IV.

rulemaking cetion should satisfy all four petitions.

l t

I i

i l

- m

)RM Petitioner lumber (FR Citation)

Subject Action 1

Standards Institute lp

)!

l71-2 American National l

which are stallar. Five comments were received, all i

in support of the petitions. J Committee N14'

)

J

)

(41 FR 15920 p

Incorporated in proposed J

4/15/76) p rule published 8/17/79.

l i

g Comments by 10/18/79 J

, 71-3 Diagnostics Iso-p comment period extended to y

(See 71-1) 12/17/79.

J topes Corporation (41 FR 50359, J)

!))

11/15/76) g Task Leader:

D. R. Hopkins.

050.(301)443-5947 p

p)

)j

i 71-4 Chen-t.uclear Sys-tems. Inc.

)

(42 FR 51 I

1 1/27/77) h I

1 i

! 73-5 Edlow Internation-To amend " Domestic Licensing Comments by 10/15/79. Only i

al Co.

of Special Nuclear Material."

one comment, reserving the (44 FR 47998, 10 CFR Part 70, and " Physical right to commer.t further on 8/16/79)

Protection of Plants and this subject at a later date, j

Materials." 10 CFR Part 73 was received en the petition.

l to make the new Part 73 phy-sical security requirement Incorporated in propos.ed rule during transport of spent (Part73), published 3/12/80 fuel shipments " consistent comments by 5/12/80, which l

with the philosophical would issue a general license approach applied to shipment to carriers of irradiated j

of SSNM in other forms."

reactor fuel.

i Task Leader J. Prell. 050.

l (301) 443-5904 1

i

-s-C. PETITIONS PENDING STAFF REVIEW PRM Petitioner j

Number (FR Citation)

Subject Action 2-6 Eckert, Seamans.

To prescribe time periods Comments by 4/6/79.

Four Cherin & Mellott for completion of licening comments have been received.

l (44 FR 6994, review by the Commission's 2/5/79) staff and Atomic Safety and Task Leader:

B. Berson, ELD.

Licensing Boards.

(301) 492-7678 l2-8 Union of concerned To require that all proposed Comments by 8/6/79. No Scientists and regulations be preceded by comments received.

Natural Resources an advance notice of intent, Defense Council, and that staff proposals for Task Leader:

B. Berson, ELD.

Inc. (44 FR 32489, regulations be treated no (301)492-7678 6/6/79) differently from those generated by the public.

i 2-10 Citizens Advisory To require an informal public Comments by 6/16/80' Board of the hearing in every instance of Nine comments have been I

0maha, Nebraska -

issuance, amendment, modi-received.

Council Bluffs, fication, suspension or Iowa Metropolitan revocation of a facility Task Leader:

B. Berson, ELD.

i Area Planning Agency' operating license.

(301) 492-7678 l

(45 FR 26071, 4/17/80).

~

l j

I i

' i

PRM Petition

.Actinn 1umbtr (FR Citation)

Sub.iect

! 20-6 Natural Resources To amend radiation protection Comunents by 2/12/76. Sixty

' Defense Council, standards ss they apply to consents were received.

Inc.

the maximun permissible fifty-six of which were in

]

(40 FR 50327',

whole body dose equivalent opposition to the petition.

10/29/75).

for occupational exposure.

A supplement to the petition 4

1 Petitioner requests lower was submitted by NRDC on i

occupational dose limits, 11/4/77, prior to Commission decision, requesting consi-eration of recent epidemio-logical studies. This issue i

will be included in the hearing on occupational j

radiation protection to be jointly sponsored by EPA, NRC, and OSHA. Hearing for-l mat, schedule, and scope is j

being worked out with these I

agencies. Advance notice of j

public hearings published by EPA 9/17/79(44FR53785).

l Hearing to follow publication of proposed EPA guidance to Federal agencies on occupa-i tional radiation exposure, but not before January 1981.

1 t

Task Leader:

J. M. Bell 0S0.

(301)427-4177 I

l l

t i

.a.

t PRH Petition l Mumbir (FR Citation)

Sub.iect Action

~

20-6A Rosa 11e Berte11 To amend NRC standards for Comments by 10/20/78.

Four (43 FR 37018, protection against radiation comments received, one favoring 8/21/78) as they apply to the maximum and three opposing the petition.

whole body dose equivalent Staff met with Dr. Berte11 on for occupational exposures 11/6/78 to discuss her views.

i.

to ionizing radiation.

The joint hearing referred to under PRM-20-6 will include consideration of this petition.

' +-

M ance notice of hearing published by EPA on 9/17/79

)

(44 FR 53785).

1.

f*30$f42h4Y17*

)

I I

1

~

l 1

I l

j

}

l l

4 1

4

_g_

PRM Petitioner j Numb 7r (FR Citation)

Sub.iect Action l

20-7 Natural Resources To adopt interim regulations Notice of Partial Dental Defense Council, setting standards for shallow published in the Federal Register Inc. (41 FR 41759, land disposal of low-level on 7/25/79 (44 FR 43541).

i 9/23/76).

radioactive wastes.

Although staff concluded that immediate implementation of interim regulations is not warranted, the issue and points raised in the petition and in tho' petitioner's proposed GEIS out-line are being considered by

)

HRC staff as input to their i

development of waste management regulations and supporting i

environmental impact statements..

Preliminary draft of regulation on disposal of low-level' wastes (Part 61) sent to States for i

review 11/9/79.. On February 28, 1980, the staff published a i

notice in the Federal Register (45 FR 13104) making the same j

draft available to the public for i

preliminary review. Staff expects l

to issue draft EIS and proposed.

's rule by April 1981.

I 4

Task Leader:

6. Roles, HMSE, (301) 427-4525 l

I i

1 l

4

l

_to_

l PRM Petitioner Number (FR Citation)

Sub.iect Action 20-10 citizens Uniteu for To require that all abnonnal Comments by 3/27/78. Thirty- -

l i-Responsible incidents be reported 1sumedi-two comments were.recalyed,~

'f l

Energy (43 FR 3448, ately within 1/2 hour) to six comments supported the

!d,~*

1/25/78) the Director of the appro-petitions twenty-five were

~-

i i

priate NRC Inspection and opposed; one commenter's Enforcement Regional Office.

position was unclear.

Task Leader:

J. Hickey. OSD.

4 l

(301) 443-5966 i

1 l

l

)

i a

i 1

s e

l l

l I

i I

1 j

l I

i

1 PRM Petition i

i Humber-(FR Citation)

Subject Action f

20-13 Victor E. Anderson To require that radiation Comments by 4/30/79, extended i

(44 FR 11284, safety personnel be. certified to 5/30/79. Fifty-eight 2/28/79) by the Commission.

comments received. Fifty-two 1

comments oppose the petition.

Analysis of comments is being i

j prepared. Further action will consider results of NRR

-e i

contracted study of need for i

licensing nuclear power plant personnel.

Task Leader:

J. M. Bell. SD.

j (301)427-4177 i

j 30-55 State of New To establish, for.

cossents by 10/11/77. Six l

Jersey. Depart-approximately 50 large comments received.

ment of Environ-facilities using byproduct mental Protection materials from man-made Task Leader:

J. Hickey. 050.

t 1

(42 FR 40791, fission reactions.

(301)4435965 l

8/11/77)

(a) criteria to quantify the ALARA emission reduction policy, (b) siting criteria.

and (c) requirements for off-i:

i l

site environmental surveillance l

J i

programs.

l i

j i

l i

I 4

i

I

' >RM Petitioner beber-(FRCitation)-

Sub. ject Action l

30-56 Gulf Nuclear. Inc.

To divide the NRC into two Comments by 7/16/79. Eleven (44 FR 28896, entities, one dealing with comments received.

5/17/79) power reactors, uranium j

j mining, and other areas

'[ask Leader:

J. Henry, 050 dealing with fissile material; I,301)443-5946 l

the second dealing only with I

byproduct materials.

e j

4 34-2 Non Destructive To amend NRC regulations to Comments by 10/3/78.

Eleven Testing Manage-provide for registration, comments have been received.

17,, '

)

ment Association licensing, and control of HMSS has started a project on LI-(43 FR 34563 indlyidual radiographers.

this topic and now has the lead !

f.

~

8/4/78) in detemining what recommenda '

F..t i

tions'will be made to the

  1. .1 Commission.

i f'c,-

L 2.

Task t.eader:

S. McGuire. OSD.

(301) 443-5970 i.

i 6

s j

i

.,.. g l

=

'A-s l

i ll 1

i I

l

_ts.

PRM Petitioner Number (FR Citation)_

Subject Action 35-1 George V. Taplin.

To amend NRC regulations to Comments by 7/6/79.

Forty-(44 FR 26617, rescind the requirement five letters received, all 5/7/79) that physicians must use an in favor of the petition.

approved radiopharmaceutical Commenters favor the use of i

strictly in accord with the radiophamaceuticals for i

manufacturers' package non-approved purposes.

insert l

Task Leader:

E. Podolak. OSD.

i t

l (301)443-5860 I

s l

40-22 Defense Security To add a new section 40.23 to Comments by 12/4/79. One Assistance Agency 10 CFR Part 40 to provide a comment received.Further (44 FR 57540 general license authorizing action on this petition has i

10/5/79)

D00 to export to any authort-been indefinitely deferred due zed country, pursuant to the to the intrristion of proposed Arms Export Control Act or legislation Ly the Executive 1

the Foreign Assistance Act Branch to transfer export lican- !

i of 1961, depleted uranium in sing authority for depleted 1

l munitiens penetrators, pro-uranium munitions from NRC to vided DOS approves pursuant the Executive Branch.

]

to either Act.

Task Leader: M. Peterson. IP.

i (301)492-8155 l

s j

a 1

l k

i

j

_14

~

PRH Peti g ner i

Number (FR CfWtion)

Subject Action

's 50 Free Environment.

To amend 10 CFR Part 50 Comments by 7/18/77. Three Inc., et al.

before proceeding with any comments were received.

(42 FR 25785, processing of license appli-Items (1) through (3) were 5/19/77) cations fbr the Central Iowa incorporated in action on i

Nuclear Project to reqstre PRM-50-19.

Item (3) denial thhts (1) nuclear reactors published 2/2/78(43FR4466)g 1

be located below ground 1tems (1) and (2) denial pub-levels (2) nuclear reactors 11shed 4/19/78 (43 FR 16556).

i be housed in sealed build-Work on Item (4) has been sus-I ings, within which pennanent pended pending Commission i

heavy vacuums are maintaineds decision on the Siting Policy l

(3) a. full-time Federal Task Force report and on employee with full authority PRM-100-2, which pertains to a i

to order'the plant to be shut related subject.

j down in case of any operational j

abnonnality always be present Task Leader:

W. Ott, 050.

in a nuclear (301)443-5966 l

tions and (4) generating sta-the Central Iowa i

Nuclear Project and other i

reactors be sited at least 40 miles from major population centers.

l l

l l

I I'

)

4

=

PRM P

ner Number (FR on)

Subject Action t

i 50-21 Northern states To include plant security in-Comments by 9/1g/77. Twelve i

i Power Company information within the defini-comments were received, all en-and Wisconsin tion of Restricted Data or dorsing the petition.

Pending l

Electric Power National Security Information, legislation to amend the Atomic Company so as to extend the protec-Energy Act of 1954 would pro-(42 FR 37458, tions of 10 CFR Part 2 to vide for the protection from 7/21/77) such inflormation.

unauthorized disclosure of 4

safeguards information, and l

would, in effect, be a grant j

of the petition.

t.

)

Task Leaders L. C. Soles. OSD 4

(301)443-5904 50-22 Public Interest To require plant operators to Cossents by 10/7/77, extended I

Research Group, post bonds, to be held in to 1/3/78. Sixty-two comments 1

et al.

escrow, prior to each plant'.

received. Notice of Partial l

(42 FR 4006.9, operation, to insure that Dental published 6/22/79 8/8/77) funds will be available for (44 FR 36523). Remaining

-J l

proper and adequate isolation portion incorporated into Ad-of radioactive material upon vance Notice of proposed Rule, l

each plant's deconnissioning.

making on Decommissioning i

Criteria for Nuclear Facilities.,

l published 3/13/78 (43 FR 10370).

Task Leader for decommissioning l

g301}443-5910 le+

D. Calkins. OSD.

?-

i i

l s

i

. r PRM PetittDner i Numb 0r (FR Citation)

Sub.iect Action 1

) 50-23 Critical Mass To renew and supplement a Comments by 8/6/79.

Petition Energy Project.

petition on evacuation plans being considered in conjunction 4

et al.

submitted to the NRC by PIRG with staff anasysis of emer-(44 FR 32486, and 30 other citizen groups gency planning rule changes, 6/6/79).

on August 6. 1975, and denied Received two cosanents.

i by NRC on 6/7/77.

l Task eader M. Jangochian.

301) j43-5966 l

OSD.

I 50-24 John P. Doherty To establish proceduras Comments by 10/1/79. One i

(44 PR 47997, whereby the Commission would comment was received, and sent i

8/16/79) infom all holders of to petitioner.

It expressed

)

Class 103 licenses of any the view that a regulation is l

announcement by any Federal not required inasmuch as the agency or department of NRC already has the necessary i

" predicted or expected autho;'ity to order shutdown.

I 1

falling objects from earth and that such events would j

orbit of that department be d nrequent. Staff developing '

or agency's responsibility Postt'on.

or a foreign nation's.'

l Task L'eader:

8. Grimes. HRR.

(301)492-7415 l

{

j i

~

j l

j 1

l i

l i

_17_

PRM Pctiticner Number (FR Citation)

Subject Action l

50-25 State of Illinois To amend 10 CFR Comments by 4/4/80.50-25a and the Porter 50.55(b)torequire a County Chapter

" good cause" proceeding Task Leader:

T. Dorian.

of the Izaak Prior to granting a request ELD.

(301)492-8690 Walton League of for extension of a i

America. Inc., et construction completion l

al. (45 FR 7653, date to determine i

2/4/80) whether the permittee has shown good cause for the s

continued construction of the plant.

i I

50-26 William K. Watson.

To amend 10 CFR Part 50 Cosaments by 4/15/80.

(45 FR 10360 Domestic Licensing of j

2/15/80)

Production and Utilization Task Leader:

J. Prell. OSD.

3 Facilities, to provide that (301)443-5904 an applicant for a license i

for a facility which will l

store certain quantities of nuclear products be 2

i required to design the facility to protect against release to the atmosphere of these products if the facility

}

is attacked by nuclear weapons j

detonated at ground level.

I i

5 I

i i

~

4

i i

_is_

PRM Petitioner Number (FR Citation)

Subject Action j

i 51-1

~ New England To amend Table S-3, " Summary Comments by 3/13/76, extended i

2 Coalition on of Environmental Considera-to 4/26/76. Ten comments i

Nuclear Pollution tions for Uranium Fuel were received. Partial

)

(41 fet 0448 Cycle " Petitioner's position denial published 4/14/78 1/16/76) is that Table 5-3 seriously (43 FR 15613). Remaining understates the impact of fusi action deferred pending a i

cycle activities on human future rulemaking proceeding i

health and safety by disre-to amend the value for radon !

garding the long-ters effects in Table S-3 until then the of certain long-lived radio-radon'value is subject to 4

nuclides.

litigation in individual

^

l LWR licensing proceedings.

Task Leader:

W. E. Thompson, i

NHSS. (301)427-4211 i

51-5 States of New York.

To amend 10 CFR 51.20(e)

Comments by 1/14/80. Petition

~

Ohio and Wisconsin Table S-3, to include dollar jointly assigned to NHSS and 50, (44 FR 65598 value impacts to account for with NHSS having primary 11/14/79).

the commitment of economic responsibility. Seven resources necessitated by comments were received, one the various nuclear waste supporting and six opposing management activities the petition.

involved in the uranium l

l fuel cycle.

Task Leader:

T. R. Workinger, J NMSS. (301) 427-4211 l

t

)

~

I l

i

-19 PRM Petition:r Number (FR Citation)

Suh. ject Action b

51-6 Catherine Quigg To require preparation of a comments by 6/16/80.*

(45 FR 25557 generic EIS for high burnup Three comments received.

l 4/15/80) nuclear fuel as used in

1 comunercial nuclear reactors.

Task Leader:

W. Ott. 050.

stored in spent fuel pools (301) 443-5966

[..:

N or cooling racks, or potential-

, [,

'y as processed in reprocessing plants or disposed of in

.s.

permanent sites.

t.;,s 70-6 Eber11ne Instru-To approve air transport of Comments by 10/17/77. One r-

i ment Corporation calibration or reference comunent was received. To be (42 FR 41675, sources containing not handled in r.onjunction with a 8/18/77).

more tha'n 5 microcuries staff-initt Ated rulemaking 1

of plutonium, action to implement Pub. L.

I 94-79. This law prohibits air transport of plutonium i

J i

until NRC certifies to Congress that a crash-proof container has been developed. The rule-4 j

making will consider, among other things, whether ut. der public Law 94-79'the Commission may authorize air t

shipment of small quantities l

I of plutonium in a package i

j other than an approved i

container, and if so, what regulatory requirements should j

apply to such shipments.

I i

i i

4 i

i '

i PRM Petitioner l Humber (PR Citation)

Subject Action l 2;'.

38h'iti'E446

" '" '5"-

^

~'

71-6 Critical Mass To impose the following Comments by 1/30/78. Forty l

Erargy Project.

conditions on licensees comments were received.

l et al.

(1) the use of special routes Informed petitioner on (42 FR 61089 for transportation of radio-6/7/78 that NRC staff is

{

12/1/77) active materials; (2) adop -

delaying action on petition i

tion of emergency plans for untti NRC/ DOT special study l

transportation accidentss on Package Reggirement and (3)assumptionbylicensees Emergency Response (re i

of financial responsibility byCongressmanWirth) quested 1

^

is for shipping accidents; and completed, j

(4) a plan for informing i

drivers of the nature of Task Leader:

A. H. Tse. 050.

their cargo and emergency (301)4435946 actions to be taken in case j

of accidenL 1

s i

i l

t 1

1 l-

,!l i

  • I PRM Petitioner I

Number (FR C1tation)

'Sub.iect Action 71-8 Foster Wheeler To exempt persons licensed Consents by 8/11/80.

-s l

Energy Corp.

pursuant to 10 CFR 34 for (45 FR 3951g, Industrial Radiography from Task Leader:

J. Henry. 05D.

6/11/80) 71.12(quirement of 10 CFR (301)443-5946 the re b)(1)(1) that such persons have a copy of. all I

documents referred to tu the license, certt ficate, or other approval in order to be able i

to deliver licensed material to a carrier for transport i

under the general licensing 6

i provisions of 10 CFR 71.12.

l l

73-2 Wisconsin Electric To eliminate the requirement Comments by 10/17/77. Approx-l Power Company, for " pat-down" physical instely 100 letters were 4

et al.

search of individuals received - about 801 from

)

(42 FR 46431 entering a protected area utilities, agreeing with 9/15/77) petitioner; and about 20%

l from others, most of whom j

disagreed with petitioner.

i The Commission decided to l

delay implementation of..

certain complementary and l

alternative measures for protection against the insider threat. Letters were sent to the petitioner inform-l ing him of these delays l

l l

I

-22_

i PRM Petitioner Number (FR Citation)

Subject Action (SECY-79-59,79-59A and 79-59B). The date has now been extended to 11/80.

Yask Leader:

T. Michaels.

l 050.

(301)443-5904 l

73-3

  • MC, Inc., et al.

To amend 173.55 to include a Comments by 9/8/78. No (43 FR 29636, statement that meeting the comments received.

Petitioner 7/10/78) spedific requirements for notifled on 11/6/78 that action l

physical protection of on the petition will be delayed licensed activities in until implementation of l

nuclear power reactors against 173.55 is completed.

individual sabotage normally will satisfy the urformance Task Leader:

7. Michaels. 050 requirement for piysical pro-(301) 443-5904

~

taction at nuclear power plants.

)

100-2 Public Interest To set ntmerical limits on Comments by 8/30/76. Twelve l

Research Group, allowable population density comments received. A staff et al.

around nuclear reactor sites.

paper (SECY-78-624)wassub-r (41 FR 27141, mitted to the Commission 7/1/76) 12/4/78. The Commission, by l

meno to EDO dated 2/15/79 deferred action pending'sub-4 mission of Siting Policy Task Force report.

Petitioner was notifled of deferral by i

aemo dated 3/9/79.

t l

l l'e3'it%6

~

'5'-

\\

1 i

l

j

-ss-PRM Petitioner

Number (FR C1tation)

Sub.iect Action 140-1 Public Citizen To find, pursuant to the Technical review of public Litigation Group procedures and criteria in Sub. comments and adequacy of and Critical Mass part E of 10 CFR Part 140, curret.t rule scheduled for Energy Project that the nuclear accident at completion in July 1980.

(44 FR 50419, the Three Mile Island, Unit 2 8/28/79) nuclear power plant constitutes Task Leader:

H. Peterson, i

I an " extraordinary nuclear 050. (301) 443-5860 I

occurrence" (EN0): to amend Subpart E to make less stringent j

the criteria used for detemining l

i that an END has occurred.

i 140-2 Public Citizen To incroise the amount of Comments by 6/23/80.

Litigation Group liability insurance required Eleven comments received.

(45 FR 26973, of persons licensed to 4/22/80) operate large commercial Task Leader: Robert Wood, i

i nuclear power plants.

NRR. (301) 492-8303 l

l j

i l

l

_