ML19345A429
| ML19345A429 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 10/31/1975 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Groce R YANKEE ATOMIC ELECTRIC CO. |
| References | |
| NUDOCS 8011210391 | |
| Download: ML19345A429 (1) | |
Text
{{#Wiki_filter:' f UNITEo STAT [S REGULATORY COMMI5SION .UCLEAR P O nEGION I - y-C31 PARK AVENUE Y KING OF PRUSSI A. PCNNSYLVANI A 19406 bi - ' October 3;, 1975 1 LTg ? Yankee Atomic Electric Company Docket No. 50-29 Attention: Mr. Robert H. Groce '[ Licensing Engineer f 'i 20 Turnpike. Road -{ Westboroug'a, MA 01581 j g T Gentlemen: h h {. Enclosed is IE Bulletin No. 75-04B vhich requires action by you with z 4-regard to your power reactor facility (ies) with operating license. .I.
- T Should you have questions regarding this Bulletin or the action re-3, quired of you, please contact this office.
k j Sincerely, I l x h $f"- .a 1 U James P. O'Reilly l, 3 Director - h A
Enclosure:
IE Bulletin No. 75-04B j Approved by GAO, B-180225 (R0072), clearance (' espires 7-31-77. Approval was given under a blanket clearance specifically for identified { generic problems. cc: H. Autio, Plant Superinteedent Donald G. Allen, Pusident s i
- .J8 bec: I Files 3l$
- eactor Facilities Branch !i PDR l Local TDR ~A b +m i REG:I Reading Room t ELD . State of P.assachusetts ( l:e.- l h-w/ 80 1121.o 3ey, Q- -) L.
~ ~ I j ~ y e e j Inspection and Enforcement J Bulletin 75-04B j l CABLE FIRE AT BROWNS FERRY NUCLEAR POWER STATION E E THE REVIEW BY THE NRC of the consequences of the fire at the Browns I Ferry Nuclear Power Str. tion is continuing. Reports of fire protection inspections perfomed by groups or organizations other than the NRC and actions taken or planned by licensees as a result of these other fire g protection inspections will be of particular value in this continuing review of the status of operating plants and determination of any actions which may be appropriate. ACTIONS TO BE TAKEN BY LICENSEES: 1. If fire protection inspections (other than those perfomed by NRC) have been made at your licensed operating facilities since March 22, 1975, please forward to this office, within 30 days: a. A copy of all reports or any other documentation relating to the fire protection inspections, dates of inspections and by whom performed. b. A description of any actions taken or planned--showing dates for actions--as a result of findings or recommendations from the fire protection inspections, or if appropriate, your posi-tion relative to the resulte of the inspections perfomed. ~. 2. If no fire protection inspections (other than those performed by NRC) have been perfomed at your licensed operating facilities since March 22, 1975, please forward to this office: k a. Within 15 days, your plans and schedules for the performance i of fire protection inspections at your licensed operating facilities within the next year. y 1 b. Within 30 days following completion of each of the inspections 7 planned (Item 2.a, above), (1) a copy of all reports or other 3 documentation relating to each fire protection inspection, fi dates of inspections and by whom performed, and (2) a descrip-tion of actions takes or planned--showing dates for actions-- t as a result of f 6 dings or recommendations from the inspections, l! or if appropriate, your position relative to the results of the p inspections performed. 3. Provide directly to the Director, Division of Reactor Inspection 7 Programs, NRC, Washington, D.C. 20555, a copy of all infomation y 'l submitited in response to this Bulletin. p s o l ~" 'i b i l-l{0 lf, Q, ! (j __..__7._'t t l}}