LER-1976-001, /03L-0:on 760204,slight Leakage from Charging Pump 3 Found in Two Areas,Relief Valve Discharge Flange & Pump Suction Tee to Valve Line Welds.Caused by Vibration Induced Fatigue Failure.Flange & Tee Replaced |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 0291976001R03 - NRC Website |
|
text
-
LICNSEE EVENT. REPORT.
CONTROL BLOCK:l l
l l( l l
l (PLEASE PRINT ALL RE; UlIED INF02MAft2N)
O-e
'i.id
"iO!'
?,',"E' tci~si Nuosia
@ l Ml A ly l gl Rl 1l l 0l 0l-l 0 l 0 l 0l 0l 0l-l 0l 0l l4l1l1l1l1l l0l3l 7 89
.14 15 25 26 30 31 32 WY N N CAftCCaf OOCKET NUMR(R EVENT DATE REPORT DAff c i CON T l l
l W W l Ol SI 01-l 0 l 0 l 219l l Ol' 2l 01 4l 1d l Ol 31 O! 41 7l tl 7 2 57 59 59 00 61 68 69 74 75 60 EVENT OESCRIPTION o
l Durine nomal operation the auxiliary operator noted slight icakage from the No. 3 l
7 89 80
@ l charging ptrap piping in two areas.: Relief valve discharge flange to piping weld, and l 7 89 80 BE I ptrno suction tee to relief valve discharge line welds.
Charging was transferred to l
7 89 80 50-29/76-1 l
0s I the No.1 Charging Ptunp. % is event is reported as Reportable Occurrence 7 89 83 nu lin accordance with Technical Specification Section E.2.b.2.
l i
7 89 rnve 80 COct COupoNENT COOT M
f R VO,ATON l
@ lPl Cl W l P l I l Pl El Xl :q W
l Zl 9l 9l 9l J
7 89 10 11 12 17 43 44 47 48 f
CAUSE OESCRIPT ON ae l ne apparent cause of the two weld cracks was vibration induced fatigue failure caused l 7 89 60 '
l M l by continuous operation of the positive displacement charging pump. D e flange and l
7 89 60 M l tee were replaced in kind and Icak tested satisfactorily.
Due to the repetitivncss l
60 taCr TV uttoOO 07 STATUS
% POWEA OTHER STATUS O!SCOVERY OfSCOvtAf O!SCAPTON J
l 0l 7l 9l l
NA l J lRoutineOperatorInspection l
1 7 8 9
10 12 13 44 45 46 80 ACTMT V CONTENT OF A!Lf ASE l Air < 3.0E-10 Beta l
lPABCubicicAreaVentedViaPrimaryStackl Fif(EAEEO AVOUNT OF ACTMTV tOCATCN OF RELEASE 12 l Ll W
7 8 9
10 11 44 45 80 PERSONNEL EXPOSURES NUMBEA TVAE DESCA'pTCN 13 l 01 Ol (( Q l NA l
7 89 11 12 13 80 PERSONNEL INJUR:ES l l
((
l l
14 7 89 11 12 60 OFFSITE CONSEOUENCES E l leakace contained within Cubicle Area and vented via monitored Primary Vent Stack l
7 89 so,
LOSS OR DAMAGE TO FACfLITY TYPE CESCE>fCN L7J l NA I
7 89 10 80 PUBLICITY H l NA l
7 09 80 ADOITIONAL FACTORS 80 3 3 n 3 o66 7
@ buse Ibscription (contd.) of this occurrence, the plant is investigating installing 'l 7 89 L0 g ja pulsation damper on the charging ptCap discharge.
l J. L. Staub (413) 625-6140 n;,..E:
or 3 re s. a t
gIrORw195 u.s. NUCLE An Recut Atcay coMuir "5 t>OCxt? Nuu:En
. p. n i 6 D-M "f3 CIDE!
?
' NRC DISTRIBUTION FOn PART 50 DOCKET MATERIAL REPORT a
TO:
FROM: YAMMEE ATOMIC ELECTRIC C0 DATE OP OOCUMENT RO'.lE, MASS 3 - Q-7L
.:R J P OREILLY
- ' "[y_q g H A AtTTIO OLETTER ONOTORIZED PROP lNPUT FORM NUMBER OP COPIES RECE8VED [UNCLAssiP l
DORiciNAL Eo
[ COPY DEsCRIPTlCN ENCL O',U RE LTR TR,0!S THE FOLLO'..'II:G..
LICENSEE EVENT REPORT 50-29/76-1/3L Of!
2 4-76 RE HELD CRACl:S. CAUSED BY C0;dINUOUS OPERATIOjOFTHEPOSITIVE. DISPLACEMENT CHARGING PU:!P..
)
J f
PLAhT NAME: YANKEE RO'.-lE NOTE:
IF PERSONNEL EXPOSURE IS INV0'.NED SEND DIRECTLY TO KREGER/J. COLLINS SAFETY FOR ACTION /lNFORMATION ENVIRO 3 - ti
l t, KIk s
M RANCH CHIEF:
YOR M W/3 CYS FOR ACTION M IC. ASST:
6 UE WQS-D W/ CYS
_m ACRS CY(llo)OLDING7SENTM LA
~
l
_ l INTERN AL DISTRIBUTION (IS T G FTL D Was fuT t -I & E (2 )
f-MIPC (3)
M EROEDER/IPPOLITO M OUSTON i
M OVAK/ CHECK TRIMES/SCPWENCER s-
- - CASE
""F.
WTT T.T33S w $>'Al'E R TdDESC0/MACCARY l
EIS ENHITT
~
f G-BAER 1HAO U-v0Lt128/stntCH M EGER/J. COLL,.UIS EXTERNAL DISTRIBUTION CONTROL NUMBE R j
J tPDR :'$RMitr.nb. M 5 a-TIC j
1 unc rcRv ses s2 7si
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000029/LER-1976-001, Forwards LER 76-001/03L-0 | Forwards LER 76-001/03L-0 | | | 05000029/LER-1976-001-03, /03L-0:on 760204,slight Leakage from Charging Pump 3 Found in Two Areas,Relief Valve Discharge Flange & Pump Suction Tee to Valve Line Welds.Caused by Vibration Induced Fatigue Failure.Flange & Tee Replaced | /03L-0:on 760204,slight Leakage from Charging Pump 3 Found in Two Areas,Relief Valve Discharge Flange & Pump Suction Tee to Valve Line Welds.Caused by Vibration Induced Fatigue Failure.Flange & Tee Replaced | | | 05000029/LER-1976-002, Forwards LER 76-002/03L-0 | Forwards LER 76-002/03L-0 | | | 05000029/LER-1976-002-03, /03L-0:on 760210,auxiliary Operator Noted Leak in Weld on Reducer Discharge Header of Charging Pump 3.Caused by Vibration Induced Fatigue Failure,Due to Continuous Operation of Displacement Charging Pump | /03L-0:on 760210,auxiliary Operator Noted Leak in Weld on Reducer Discharge Header of Charging Pump 3.Caused by Vibration Induced Fatigue Failure,Due to Continuous Operation of Displacement Charging Pump | | | 05000029/LER-1976-003, Forwards LER 76-003/01T-0 | Forwards LER 76-003/01T-0 | | | 05000029/LER-1976-003-01, /01T-0:on 760513,review of ECCS Analysis Found Error in Accident Analysis.Caused by Error in Assumption of Accident Analysis.Reanalysis Performed.Proposed Change to Tech Specs Submitted | /01T-0:on 760513,review of ECCS Analysis Found Error in Accident Analysis.Caused by Error in Assumption of Accident Analysis.Reanalysis Performed.Proposed Change to Tech Specs Submitted | | | 05000029/LER-1976-004, Forwards LER 76-004/03L-0 | Forwards LER 76-004/03L-0 | | | 05000029/LER-1976-004-03, /03L-0:on 761216,during Monthly Test,Hpsi Pump 1 Shaft Housing Seal Was Found to Leak Lightly.Caused by Cut in Gasket.Defective Gasket Replaced | /03L-0:on 761216,during Monthly Test,Hpsi Pump 1 Shaft Housing Seal Was Found to Leak Lightly.Caused by Cut in Gasket.Defective Gasket Replaced | | | 05000029/LER-1976-005-03, /03L-0:on 760520,auxiliary Operator Noted Slight Leakage from Weld on Inlet Charging Pump 3 Relief Valve. Caused by Pullback Gap Not Allowed During Installation of Pipe & Vibration Induced Fatigue Failure | /03L-0:on 760520,auxiliary Operator Noted Slight Leakage from Weld on Inlet Charging Pump 3 Relief Valve. Caused by Pullback Gap Not Allowed During Installation of Pipe & Vibration Induced Fatigue Failure | | | 05000029/LER-1976-005-30, /030-1:on 760520,weld on Inlet to Charging Pump 3 Relief Valve Found Leaking.Caused by Error in Installation of Pipe in Which Full 1/16 Inch Pullback Not Allowed | /030-1:on 760520,weld on Inlet to Charging Pump 3 Relief Valve Found Leaking.Caused by Error in Installation of Pipe in Which Full 1/16 Inch Pullback Not Allowed | | | 05000029/LER-1976-005, Forwards LER 76-005/03L-0 | Forwards LER 76-005/03L-0 | | | 05000029/LER-1976-006, Forwards LER 76-006/01T-0 | Forwards LER 76-006/01T-0 | | | 05000029/LER-1976-006-01, /01T-0:on 760624,during Normal Operation,Routine Safety Injection Tank Makeup Was Performed Per Plant Procedure.Acceptance Criteria Not Met.Caused by Change 117, Suppl 3,requiring Limits on Boron Concentration | /01T-0:on 760624,during Normal Operation,Routine Safety Injection Tank Makeup Was Performed Per Plant Procedure.Acceptance Criteria Not Met.Caused by Change 117, Suppl 3,requiring Limits on Boron Concentration | | | 05000029/LER-1976-007-01, /01T-0:on 760624,investigation of RO 76-06 Revealed That Assumed Boron Concentration of LOCA Analysis Was Exceeded During Hydrostatic Leak Test of Reactor Vessel. Caused by Personnel Error.Personnel Reinstructed | /01T-0:on 760624,investigation of RO 76-06 Revealed That Assumed Boron Concentration of LOCA Analysis Was Exceeded During Hydrostatic Leak Test of Reactor Vessel. Caused by Personnel Error.Personnel Reinstructed | | | 05000029/LER-1976-007, Forwards LER 76-007/01T-0 | Forwards LER 76-007/01T-0 | | | 05000029/LER-1976-008, Updated LER 76-008/010-0:on 760730,review of Rod Ejection Accident Analysis Revealed Error in Method Used for Core 11 Analysis.Caused by Error in Methods & Application of Analysis Codes.Sys of Documentation Control Initiated | Updated LER 76-008/010-0:on 760730,review of Rod Ejection Accident Analysis Revealed Error in Method Used for Core 11 Analysis.Caused by Error in Methods & Application of Analysis Codes.Sys of Documentation Control Initiated | | | 05000029/LER-1976-010, Forwards LER 76-010/01T-0 | Forwards LER 76-010/01T-0 | | | 05000029/LER-1976-010-01, /01T-0:on 760830,during Review of Core 12 Analysis,Error Found in Figure 8-1 of Tech Specs.Caused by Gamma Heating Correction Omitted by Error in Application of Computer Codes | /01T-0:on 760830,during Review of Core 12 Analysis,Error Found in Figure 8-1 of Tech Specs.Caused by Gamma Heating Correction Omitted by Error in Application of Computer Codes | | | 05000029/LER-1976-011, Forwards LER 76-011/03L-0 | Forwards LER 76-011/03L-0 | | | 05000029/LER-1976-011-03, /03L-0:on 760907,slight Leakage Noted from Welded Nipple on Charging Pump 3 Discharge Heater Line.Caused by Failure to Allow 1/16-inch Pull Back Gap During Installation of Weld.Pump Isolated & Nipple Replaced | /03L-0:on 760907,slight Leakage Noted from Welded Nipple on Charging Pump 3 Discharge Heater Line.Caused by Failure to Allow 1/16-inch Pull Back Gap During Installation of Weld.Pump Isolated & Nipple Replaced | | | 05000029/LER-1976-012-01, /01T-0:on 761119,safety Injection Accumulator for Boron Was 30 Ppm Over Tech Specs & 80 Ppm Over Administrative Limits.Investigation Revealed That Std Sodium Hydroxide Titrant Had Concentrations Lower than Predicted | /01T-0:on 761119,safety Injection Accumulator for Boron Was 30 Ppm Over Tech Specs & 80 Ppm Over Administrative Limits.Investigation Revealed That Std Sodium Hydroxide Titrant Had Concentrations Lower than Predicted | | | 05000029/LER-1976-012, Forwards LER 76-012/01T-0 | Forwards LER 76-012/01T-0 | | | 05000029/LER-1976-013-01, /01T-0:on 761128,following Plant Trip from Power, Main Collant Pump 3 Inadvertently Restarted During Scram Recovery.Caused by Jammed Trip Mechanism on Air Circuit Breaker.New Trip Coil Installed | /01T-0:on 761128,following Plant Trip from Power, Main Collant Pump 3 Inadvertently Restarted During Scram Recovery.Caused by Jammed Trip Mechanism on Air Circuit Breaker.New Trip Coil Installed | | | 05000029/LER-1976-013, Forwards LER 76-013/01T-0 | Forwards LER 76-013/01T-0 | | | 05000029/LER-1976-014-03, /03L-0:on 761216,during Performance of OP-4204, Monthly Test of Safety Injection Pumps,High Pressure Safety Injection Pump Shaft Housing Seal Found Leaking.Caused by Cut in Gasket.Defective Gasket Replaced | /03L-0:on 761216,during Performance of OP-4204, Monthly Test of Safety Injection Pumps,High Pressure Safety Injection Pump Shaft Housing Seal Found Leaking.Caused by Cut in Gasket.Defective Gasket Replaced | |
|