Forwards IE Insp Repts 50-445/80-20 & 50-446/80-20 During Sept 1980 & Notice of Deviation
ML20002A815
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/21/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20002A816 List:
References
NUDOCS 8011210621
Download: ML20002A815 (2)


See also: IR 05000445/1980020

Text

/C

.

UNITED STATES

/p* %g'a,

NUCLEAR REGULATORY COMMISSILN

" " +

/'

R EoloN IV

. . k'J

'

S

611 RY AN Pt.AZA oRIVE. SUITE 10oo

i

7

,j

art.INGToN, TEXAS 76012

"

r,

.'

h . ,u , d' f

3,

,s

s

October 21, 1980

,..

In Reply Refer To:

c-

RIV

d

-

Docket No. 50-445/Rpt. 80-20

,-

50-446/Rpt. 80-20

d

q

s c2

, :, 4

Texas Utilities Generating Company

]

,j

'

ATTN:

Mr. R. J. Gary, Executive Vice

n

y

President and General Manager

2

,'

3

2001 3ryan Tower

f

Q

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. R. G. Taylor, during September 1980, of activities authorized by NRC

Construction Permits No. CPPR-126 and 127 for the Comanche Peak facility,

Units No. 1 and 2, and to the discussion of our findings with Mr. R. G.

Tolson and other members of your staff at the conclusion of the inspectio'n.

Areas examined during the inspection and our findings are. discussed in .the

enclosed inspection = report. Within these areas, the inspection. consisted.of'

selective-examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with Appendix 3 to 10 CFR 50 of the NRC

Regulation, " Quality Assurance Criteria for Nuclear Power Plants." The

Notice of Violation for the item of noncompliance reported in the enclosed

inspection report was forwarded to you by our letter dated September 24, 1980;

therefore, this letter does not require further response regarding this matter.

During the inspection, it was found that certain of your activities appeared

to deviate from commitments in the FSAR. This item and references to the

specific commitments are identified in the enclosed Notice of Devdation.

In

your repiy, please include your comments concerning this item, a description

of any steps that have been or will be taken to correct it, a description of

any steps that have been or will be taken to prevent recurrence, and the date

all corrective actions or preventive measures were or vill be completed.

Two new unresolved items are identified in paracraphs 4 and 7 of the enclosed

report.

0011210&

.

.

.

'

.

Texas Utilities Generating Company

2

October 21, 1980

In accordance with Section 2.790 of Ehe NRC's " Rules of Practice," Part 2,

Title 10. Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will.be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

.

'

l

&d.:

-

W. C. Seidle, Chief

Reactor Con'sj:ruction and

.

Engineering Support 3 ranch -

Enclosures:

1.

Appendix B, Notice of Deviation

2.

IE Inspection Report No. 50-445/80-20

50-446/80-20