ML20002C602

From kanterella
Revision as of 16:36, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Addl Info Re Mixed Oxide Fuel Densification & Thermal Conductivity.Info Requested within 45 Days to Maintain NRC Review Schedule of Util Reload G-1 Submittal
ML20002C602
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 09/30/1975
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8101100553
Download: ML20002C602 (2)


Text

.

O $

e DISTRIBUTION

l. Docket Dross Docket No. 50-155 SEP 3 C,1975 NRC PDR VStello Local PDR SVarga ORB-2 Reading DEisenhut KRGoller g ( //f} kg /J7/g Consumers Tower Company TJCarter lbr ty A1TN: Mr. Ralph B. Sewell OELD Nuclear Licensing Ad:ninistrator OISE (3) 212 West Michigan Avenue DLZiemann Jackson, Michigan 49201 EReeves MFletcher Gentlernen:

g!Diggs Our review of the Big Rock Point Reload G-1 subesittal is continuing.

However, additional information, as listed below, is required te supplement your responses to questions asked in our letter dated April 2, 1975, (1) Mixed Oxide fuel densification.

It is not sufficient to say that G-1 fuel will be made by the same processes as the G fuel and, therefore, will have the same densification behavior. Provide explicit information to confirm that they will behave similarly. This infomation should include a discussion of microstructural data, themal stability data, and other pertinent data.

(2) Mixed Oxide fuel thermal conductivity.

Provide the themal conductivity expression to be used in GAPEX for describing mixed oxide fuels.

Future sutsnittals should refer to the draft Regulatory Guide, which was forwarded to you June 23, 1975, to hvoid questions in these areas.

In addition, if future loadings of mixed oxide fuels are contemplated under Amendment 4, a general topical report by your fuel supplier on mixed oxide fuel performance will be required.

To pemit our review to proceed on schedule, the requested infomation should be provided within 45 days of the date of this letter, rNNE1SIgnedbf:7 Dennis L. Ziemann Dennis L. Ziemann, Chief OperatinE Reactors Branch #2 8101100553 Division of Reactor Licensing z

f.4/ ~~

s l

W r

jjll, d

l RL:0RB #2 RL:0RB.#2.._

RL:0RB #2 one..

EReevesg[

g MHFly DLZiemann

ro

. /3...D/ 75 9/Q/75 9/f.f/75 9

' fons AIC.)ls (Rev. 9.$3) AECM 0240 1lt u. s. oovannusut eneuvino onescas sere.sae-ene

. s'.

..)

- f Consumers Power. Company SEP 3 01975 r

cc

'Mr. Paul A. ' Perry, Secretary

' Consumers Power Company-212 West Michigan Avenue Jackson, Michigan 49201 i

Peter W. Steketee, Esquire Freihofer, Cook, Hecht, Oosterhouse and De Boer Union Bank Building, Suite 950 Grand Rapids, Michigan 49S02 i

George C. Freeman, Jr., Esquire ilunton, Williams, Gay & Gibson 700 Eas' Main Str eet Richmond, Virginia 23212 Charles F. Bayless Of Counsel Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Charlevoix Public Library 107 Clinton Street Charlevoix, Michigan 4E720 1

l' i

4 I

g.

j 3

9 4

_ y.

<-e-

~ ~ - *

~*

.s

, -. ~.,

- -., ~.,