ML20003H970
Text
Alibims P:wer Company 600 Nor:n 18th Street
)
Post Offica Box 2S41
)
Birmingham, Altbam335291 Telephone 205 250-1000 j
F. L CLAYTON, JR.
Senior Vice President Alabama Power the swit:em electnc system May 4, 1981
~
os A
Docket No. 50-348 U. S. Nuclear Regulatory Commission i-O7 /Sg7 A u
Office of Inspection and Enforcement h
Qe,%'*'r s /q Region II b
"N U. 8 101 Marietta Street, N.W.
O N
Suite 3100 j ~_,
3 Atlanta, Georgia 30303
Dear Sir:
Joseph M. Farley Nuclear Plant, Unit 1, License Event Reports Nos.
LER 81-012/03-L-0, LER 81-015/03-L-0, LER 81-016/03-L-0, and LER 81-017/
03-L-0 are forwarded herewith with three (3) copies of each, in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written
~
notification of the occurrence.
If you have any questions, please advise.
Yours very truly,
)
F. L. Clayton, FLCJr/JRC:nac Enclosure xc: 6 (30 copies)
Director, MIPC (3 copies) 001 s
ib l
1 l
5 sl os os o 953
_