Forwards IE Insp Repts 50-277/81-05 & 50-278/81-05 on 810201-28.No Noncompliance Noted
ML20004C944
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/12/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20004C945 List:
References
NUDOCS 8106080062
Download: ML20004C944 (2)


See also: IR 05000277/1981005

Text

8

o

UNITED STATES

[

g },

NUCLEAR REGULATORY COMMISSION

REGION 1

% * *V[q j

.

.sl

g

43tPARK AVENUE

G

'

KING OF PRUSSIA. PENNSYLVANIA 19406

  • * * ,o

MAY 121981

Docket Nos. 50-277

50-278

<s N

O

Philadelphia Electric Company

[e d{.h _ {y[.[_

)

q

P~

ATTN: Mr. S. L. Daltroff

Vice President

--

M 03 M1*.8

2

Electric Production

C

P

v.s. mu maem

2301 Market Street

  • " " "

2

@4%

Philadelphia, Pennsylvania 19101

'

(

Gentlemen:

Subject:

Inspections 50-277/81-05

50-278/81-05

This refers to the routine safety inspection conducted by Mr. C.M. Cowgill

and Mr. R. Blough of this office on February 1-28, 1981 at Peach Bottom

Atomic Power Station, Units 2 and 3, Delta, Pennsylvania of activities

authorized by NRC License Nos. DPR-44 and DPR-56 and to the discussions of

our findings held by Mr. Cowgill with Mr. W.T. Ullrich of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in the enclosure to our letter

dated September 24, 1980. We have no further questions regarding your

action at this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such information.

Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

8106080 O(oT-

.

-

.

-

.

.

.

.

MAY 121981

Philadelphia Electric Compariy

2

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should

be witnheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possibl4 into a separate part of the affidavit.

If we do not

hear from you in tnis regard within the specified periods noted above, the

report will be placed in the Public Document Room.

The telephone no-

tification of your intent to request withholding, or any request for an

extension of the 10 day period which you believe necessary, should be made

to the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-

5223.

No reply to this letter is required; however, should you have any questions

concernir.g this inspection, we will t,e pleased to discuss them with you.

Sincarely,

-f.,

\\':p }::

R. R. Kei

g, ChMf

Projects Branch #2, Division of

Resident and Project Inspection

Enclosure:

Combined Office of Inspection and Enforcement Inspection

Report Number 50-277/81-05 and 50-278/81-05

cc w/ encl:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Michael J. Scibinico, II, Assistant Attorneu General (Without Report)

.

l

l