ML20004E168
| ML20004E168 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/08/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20004E169 | List: |
| References | |
| 12243, NUDOCS 8106110293 | |
| Download: ML20004E168 (2) | |
Text
4 t
[N
.a r
J James W Cook
- i Vice PresnJent - Projects, Engsneersng 2nd Concructwn Genersi offices: 1945 West Pernad Road, Jackson, MI 49201 e (517) 788-0453 June 8, 1981 Mr Harold R Denton, Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT DOCKET NOS 50-329, 50-330 FILE: 0485.16 LTI:
71*01/00234(S) SERIAL:
12243 ENCLOSURES:
(1) Revised pages for Specification C-88-Q (3 (' spies)
(2) Bechtel Quality Control Instructions for Gravel-Packed Wells (3 copies)
~
(3) Consumers Power Midland Project Quality Assurance Department - Project Inspection Plan and Report (3 copies)
Enclosures (1) through (3) have been revised to reflect the resolution of comments received from J D Kane (NRR-HGEB), R 3 Landsman (Region III) and H Singh (Army Corps of Engineers) on June 3 and 5, 1981.
It is our understanding that all comments have been received and resolved.
l We believe that the previous information supplied to you on May 28, April 24 and March 23, 1981 combined with the additional information attached to this letter, resulting from our recent discussions with the Staff and Region III personnel, should be sufficient so that you can concur with our request to l
proceed with the installation of the backup interceptor wells.
The subcontractor which will be installing the 20 backup interceptor wells has begun mobilization of his resources. Actual work, however will not begin until your formal concurrence to the subject specification is received.
In light of this, your expeditious approval would be most appreciated.
0 6Ig TC/ ~'C/ r oc0681-03:'6aICO N
N 8106110
2 CC FJCook, Midland Resident inspector Atomic Safety _and Licensing Appeal Board Atomic Safety and Licensing Board Panel Charles Bechhoefer, Esq James E Brunner, Esq Myron M Cherry, Esq Dr Frederick P Cowan Steve Gadler D F Judd, Sr Project Manager Frank J Kelley, Esq Ralph S Decker R B Landsman Region III w/a Wendell H Marshall Michael Miller, Esq William D Paton, Esq Hari Singh, Army Corps of Engineers Mary Sinclair Barbara Stamiris C R Stephens Docketing and Service Section oc0681-03264100