ML20005B668

From kanterella
Revision as of 10:07, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/81-11 on 810518-22.No Noncompliance Noted
ML20005B668
Person / Time
Site: Summer 
Issue date: 06/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20005B669 List:
References
NUDOCS 8107080534
Download: ML20005B668 (2)


See also: IR 05000395/1981011

Text

{{#Wiki_filter:. - . _ _ . _ _ . _ _ _ _ . _ _ , d 4 UNITED STA1 ES 8 7 NUCLEAR REGULATORY COMMISSION $ E REGION 11 [[ 101 MARIETTA ST., N.W., SulTE 3100 Q ATLANTA, GEORGIA 30303 % JIIN 151981 " " '

South Carolina Electric and Gas Company $. ATTN: Mr. T. C. Nichols, Jr., Vice President y (, 6- Power Production and System Operations Q t. 4 s 0'I g7 P P. O. Box 764 g'j Columbia, SC 29218 q2

-

i a - Gentlemen: c o .* - arf. 41 Subject: Report No. 50-395/81-11 % g This refers to the routine safety inspection conducted by Mr. G. L. Troup of t is office on May 18-22, 1981, of activities authorized by NRC Construction Permit No. CPPR-94 for the V. C. Summer facility and to the discussion of our findings held with Mr. O. S. Bradham, Manager Nuclear Operations, at the conclusion of the inspection. 3 Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations or deviations were disclosed. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed report will be placed in the NRC's Public Document Room. If the report contains any information that you believe to be exempt from disclo- sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by telephone within ten days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1), such applica- tion must be accompanied by an affidavit executed by the owner of the information which identifies the document or part thereof sought to be withheld, and a full statement of the reasons on the basis of which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790- (b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. y Ol s /!/ P1070B0534 810615 i PDR ADOCK 05000395 L.Q PDR - _ _ _ - _ - _ _ _

F,. . JUN 151981 . . . South Carolina Electric and Gas Company 2 .Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, $~l. R.. C. s, Acting Director Division of Resident and Reactor Project Inspection Enclosure: Inspection Report No. 50-395/81-11 cc w/ enc 1: J. B. Knotts, Jr. A. A. Smith, Site QA Coordinator . O. S. Bradham, Manager Nuclear Operations - I

i 1 - i 1 i = l t I I ! .' l -- }}