Ack Receipt of Informing NRC of Corrective Actions in Response to 810128 Immediate Action Ltr Re safety-related Coatings Activities
ML20008F328
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/26/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8103120834
Download: ML20008F328 (1)


Text

-

p esoo Y

'g II UNITED STATES

[ *,,,

g NUCLEAR REGULATORY COMMISSION 6

g c

REGION lil 8

799 ROOSEVELT ROAD g

e GLEN ELLYN, ILLINOIS 60137 February 26, 1981 eY Docket No. 50-440 Docket No. 50-441 ff The Cleveland Electric Illuminating Aldg D7 g 'l gg Z

Company 1

U. s.

f ATTN: Dalwyn R. Davidson Q

A Vice President - System

%r 8

Engineering and Construction Post Office Box 5000 e

Cleveland, OH 44101 6

Gentlemen:

Thank you for your letter dated February 9,1981, informing us of the corrective actions you have taken in response to our Immediate Action Letter of January 28, 1981 regarding safety-related coatings activities.

The RIII Resident Inspector has reviewed your corrective actions to date, and will continue to monitor your implementation of the corrective actions during the reinitiation of coatings activities.

Your cooperation with us is appreciated.

Sincerely, o

. A R. F. Heishman, Acting Director Division of Resident and Project Inspection cc w/ltr dtd 2/9/81:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Daniel D. Wilt, Attorney

- Helen W. Evans, State of Ohio

@ [03 lh0

~

'.5OI

/,!

A iEl j.'l ' i G '. UE 2 N $i T

~ l I.5

$,.i.f Ii p

f P.o. box 5000 e CLEVELAND. oHlo 44101 e TELEPHONE (216) 622-9800 e ILLUMINATING OLDG e 55 PUBLIC SOUARE Serving The Best Location in the Nation Murray R. Edelman February 9, 1981 MAN AG ER NUCtf AR QUALITY ASSURANCE DEPARTMEN T Mr. Caston Fiorelli United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Actions Taken to Resolve SWN 81-01, CAR 0504, USNRC Findings and January 28, 1981 Immediate Action Letter on SP-64 Contractor As a result of actions taken by our nuclear coatings contraitor, Metalweld, Inc.,

and curselves, we are prepared for NRC Region III review of the result of cor-rective actions taken. As per Item No. 2 of your Immediate Action Letter dated January 28, 1981, we are withholding a partial Stop Work Release (SWR) to restart safety-related coating activities on Reactor Building No. 1 Dome, pending NRC Region III concurrence with our actions.

The following is a summary of the corrective actions taken to resolve.Stop Work

~

Notification No. 81-01, Corrective Action Request No. 0504, USNRC findings during January 21-23, 1981 inspection, and Immediate Action Letter dated January 2% 1981.

The referenced action numbers are as listed on the attachment to our letter to you dated January 26, 1981.

Actions Complete:

Item Nos. 1, 2, 5,~6, 7, 8, 9, 11, 12, 13, 14, 15 and 19 Intermediate Actions Completed to Support First Partial SWR:

Item Nos. 3, 4, 10, 18, 20 and 21 Actions Not Required for First Partial SIU1:

Item Nos. 16 and 17 As discussed with Mr. Konklin on February 5, 1981, these specific actions taken sat-isfy Items 1(a)-(d) in the Immediate Action Letter.

If you-have any questions regar-ding'the~above summary, please contact us-immediately.

Very truly yours,

$1 k hY11% f()

Murray R. Edelman Manager g)g Nuclear Quality Assurance Department MRE: bas g } g ggg cc: Jir. J. Hughes, USNRC - Site U.S~. Nuclear Regulatory Commission Mr. J. Konklin. USNRC

'c/n nne,-an e unn on-o n e ne,nrh.

..