FVY-81-152, Forwards Yankee Atomic BWR Analysis Methods:Analysis of Typical BWR/4 Turbine Trip W/O Bypass Transients, in Support of Proposed Change 98
| ML20011A771 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 10/30/1981 |
| From: | Rich Smith VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20011A772 | List: |
| References | |
| FVY-81-152, NUDOCS 8111030136 | |
| Download: ML20011A771 (1) | |
Text
VERMONT Y AN KME NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STRC$?
2.C.2.1 RUTLAND, VERMONT 05701 EVY 81-152 MEPLY TO:
ENGINEERING OFF!CE 167* WORCESTER ROAD FRAMINGH AM M ASSACHUSETTS O1701 T E L Ec" HON E 817 872 8100 A
October 30, 1981
~
I%o
)?
\\eh United States Nuclear Regulatory Commission j
/g Washington, D. C.
20555 Atten tion :
Orlice cf Nuclear Reactor Regulation Ah' '
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, dated October 23, 1981 (c) Letter, VYNPC to USNRC, FVY 81-128, dated September 2,1981
Subject:
Supplemental Information in Support of Proposed Change No. 98 - Reload Licensing Submittal
Dear Sir:
This letter provides the information requested in Reference (b). This informat!on is contained in the attached report, YAEC 1280 - Yankee Atomic Boiling Water Reactor Analysis Methods: Analysis af a Typical BWR/4 Turbine hip Without Bypass Transient.
We trust that this information vill aid you in completing your review of Reference (c) in a timely manner. Should you have any further questions, please con tact us.
Very truly yours, VERMONT YANKEE NUCLPJM POWER CORPORATION R. L. Smith CD Licensing Engineer s
RLS: dad
/ /D Attacnmen t f
8111030136 811030 PDR ADOCK 05000271 P
pop
,