PLA-1702, Forwards Susquehanna Steam Electric Station Unit 1 Startup Rept, Per Tech Spec Section 6.9.1.1.Supplemental Rept Will Be Submitted within 90 Days

From kanterella
Revision as of 01:47, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Susquehanna Steam Electric Station Unit 1 Startup Rept, Per Tech Spec Section 6.9.1.1.Supplemental Rept Will Be Submitted within 90 Days
ML20024A378
Person / Time
Site: Susquehanna 
Issue date: 06/10/1983
From: Kenyon B
PENNSYLVANIA POWER & LIGHT CO.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17139B588 List:
References
PLA-1702, NUDOCS 8306170188
Download: ML20024A378 (1)


Text

_

PPat Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770'5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 JUN 101983 Mr. James M. Allan Acting Regional Administrator-Region I U.S. Nuclear Regulatory Conunission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION STARTUP REPORT ER 100450 FILE 841 PLA-1702 Docket No. 50-387

Dear Mr. Allan:

Two copies of the Susquehanna SES Unit 1 Startup Report are attached. This report is submitted nine months following initial criticality in accordance with Technical Specifications Section 6.9.1.1.

A supplemental report will be submitted within 90 days.

Very truly yours, NJ.x s

B. D. Kenyon Vice President-Nuclear Operations Attachment cc:

Mr. R. C. DeYoung, Director Office of Inspection and Enforcement 7

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk (36 copies)

Mr. G. Rhoads - NRC Mr. R. Perch - NRC i

8306170188 830610 PDR ADOCH 05000387 p

PDR g6O' l (

-