Requests 30-day Extension to File Listed Administrative Control Procedures & 60-day Extension for Procedure 7LAC-02201,per IE Insp Rept 50-528/83-15
ML20024E272
Person / Time
Site: Palo Verde  
Issue date: 07/15/1983
From: Andognini G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NOLD-83-045, NOLD-83-45, NUDOCS 8308100162
Download: ML20024E272 (2)


Text

-

)(%o 883jz, [f Arizona Public Service Company P O BOX 21666

k09,

'S j

G CAHL ANDOGNINI l

~4in'#0L N0LD 83-045

" % e,,

July 15, 1983 s

Mr. John B. Martin

'Jffice of Inspection and Enforcement Region V US Nuclear Regulatory Commssion 1450 Maria Lane, Suite 210 Walnut Creek Plaza Walnut Creek, California 94596

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Docket Nos. STN-50-528/529/530 File: 83-055-026 i

References:

A)

IE Inspection Report No. 50-528/83-15 from P. H. Johnson to G. C. Andognini, Dated 4

i June 23, 1983 Based on a PVNGS commitment to the NRC to have all administrative control procedures required for fuel load and plant operation issued by July 1, 1983, we are requesting a 30 day extension for the issuance of the following procedures:

I 1.

30AC-0ZZ06 Work Control / System Turnover Work Order 2.

40AC-9ZZO9 Switch Yard Administrative Control 3.

75AC-9ZZ06 ALARA Review 4.

75AC-9ZZO8 ALARA Report j

5.

78AC-0ZZ05 Security Document Control 6.

78AC-0ZZ08 Control of Specs and Purchase Orders 7.

78PR-0ZZ01 PVNGS Document Control Program 8.

40PR-0ZZ01 Operating Program In addition, we are requesting a sixty (60) day extension for the issuance of 71AC-0ZZ01, " Event Related Reporting," which is in the process of being rewritten.

l t

l l

f l

8308100162 830715 l

PDR ADOCK 05000528 D

O PDR

Mr. John B. Martin July 15, 1983 Page Two If you have any questions concerning this matter, please call Todd Bloom, (602) 271-3438.

Sincerely, 1

f, l'/

%dMU

. Carl Andogn'ini Vice President Nuclear Operations GCA/TJB:lf cc:

Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palo Verde Nuclear Generating Station PVNGS Project Manager - USNRC P. H. Johnson, USNRC Region V l