LD-83-045, Requests 30-day Extension to File Listed Administrative Control Procedures & 60-day Extension for Procedure 7LAC-02201,per IE Insp Rept 50-528/83-15
| ML20024E272 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/15/1983 |
| From: | Andognini G ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NOLD-83-045, NOLD-83-45, NUDOCS 8308100162 | |
| Download: ML20024E272 (2) | |
Text
-
)(%o 883jz, [f Arizona Public Service Company P O BOX 21666
- PHOENIX, ARIZONA 85036
- k09,
'S j
G CAHL ANDOGNINI l
~4in'#0L N0LD 83-045
" % e,,
July 15, 1983 s
Mr. John B. Martin
'Jffice of Inspection and Enforcement Region V US Nuclear Regulatory Commssion 1450 Maria Lane, Suite 210 Walnut Creek Plaza Walnut Creek, California 94596
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Docket Nos. STN-50-528/529/530 File: 83-055-026 i
References:
A)
IE Inspection Report No. 50-528/83-15 from P. H. Johnson to G. C. Andognini, Dated 4
i June 23, 1983 Based on a PVNGS commitment to the NRC to have all administrative control procedures required for fuel load and plant operation issued by July 1, 1983, we are requesting a 30 day extension for the issuance of the following procedures:
I 1.
30AC-0ZZ06 Work Control / System Turnover Work Order 2.
40AC-9ZZO9 Switch Yard Administrative Control 3.
75AC-9ZZ06 ALARA Review 4.
75AC-9ZZO8 ALARA Report j
5.
78AC-0ZZ05 Security Document Control 6.
78AC-0ZZ08 Control of Specs and Purchase Orders 7.
78PR-0ZZ01 PVNGS Document Control Program 8.
40PR-0ZZ01 Operating Program In addition, we are requesting a sixty (60) day extension for the issuance of 71AC-0ZZ01, " Event Related Reporting," which is in the process of being rewritten.
l t
l l
f l
8308100162 830715 l
PDR ADOCK 05000528 D
O PDR
Mr. John B. Martin July 15, 1983 Page Two If you have any questions concerning this matter, please call Todd Bloom, (602) 271-3438.
Sincerely, 1
f, l'/
%dMU
. Carl Andogn'ini Vice President Nuclear Operations GCA/TJB:lf cc:
Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palo Verde Nuclear Generating Station PVNGS Project Manager - USNRC P. H. Johnson, USNRC Region V l
l l
,.w,.,
,., _ _,