ML20027A955

From kanterella
Revision as of 21:58, 20 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Violation from Insp on 820524-28
ML20027A955
Person / Time
Site: Vogtle  
Issue date: 07/12/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20027A941 List:
References
50-424-82-13, 50-425-82-13, NUDOCS 8209160219
Download: ML20027A955 (1)


Text

r c,

w s

/

J!

APPENDIX A

/

NOTICE OF VIOLATION Georgia Power Company

' Docket Nos. 50-424 & 50-425

~

Vogtle 1 and 2 License Nos. CPPR-108 & CPPR-109

/

./

-/

Lc3 c

As a result of the inspection conducted on-May 24-28 1982, and,to accordance with the NRC Enforcement Policy, - 47 FR 9937 (March 'I',1982)~~ the following violation was identified.

~

10 CFR 50, Appendix B, Criterion XVI and the accepted QA Program (PSAR' Section 17.1.16) require that measures be established to assure that condi-tions adverse to quality such as nonconform~ances are promptly cor'rected.

Procedure GD-T-09 requires that all equifmert at its permanent location shall be made access-controlled to the~greage'st practical degree.

Bechtel document X61H02-85-2, paragraph 2b-4, Storing Pump s on Foundation, also requires sealing protective covers.

R c

Contrary to the above, conditions adverse to quality were n' t promptly cor-o rected.

During April 1981, the licensee identified in a QA audit' that controls were inadequate to mainta'in the protective cover integrity?for the chemical and volume control system (CVCS) charging pump (2-1208-P6-006).

Another QA audit in January 1982 identified that similar in place storage 4

maintenance controls appeared inadequate. Prompt corrective action-was not taken in that the inspector found the condition still existed for this and four other CVCS charging pumps.

,v o.

This is a Severity Level IV Violation (Supplement'II).

~

Pursuant to the provisions of 10 CFR 2.201, you are hereby required p submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of.the' alleged viola-tion; (2) the reasons for the violation - if admitted; (3) the corrective steps which have been taken and the results achieved; (4) correctlye steps which vill be taken to avoid further violations; and (5) the date when'fali compliance sill be achieved.

Consideration may be given to extending your response f.fme for good cause shown.

Date: July 12, 1982 j

.s

=

?

}

.s

~

8209160219 R20820 I

PDR ADOCK 05000424 G

PDR r

y y

--%----e--

  • + - ~ ~ + - - - - - *

.