Text
- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _
i MAR tt WR MEMORARDUM FOR: Charles E. Rossi, Director Division of Operational Events Assessment, hkR I
Brian K. Grimes, Director Division of Reactor Inspection and Safeguards, NRR FROM:
Thomas M. Novak Director Division of Safety Programs, AEOD
SUBJECT:
FAILURES OF ELECTRICAL SUPPLY AND POWER GEhERAT10h EQUIPMENT WHICH DISRUPTED PLANT FUNCTION AT NUCLEAR p" -
POWER PLANTS
(
Enclosed is the subject engineering analysis. This ttudy was initiated because of the occurrence of several events in early 1989 involving major electrical equipment or offsite power problems. The issues addressed in this re rern disruptions of normal stetdon auxiliary alternating current (AC) port con-power supply caused by grid, switc'a ard, and t on-1E electrical system problems and major electrical equipment failures.
~
Most of the operating experience cited in this report was previously informally provided to W. Johnston, Region 1, several months ago and provided the basis for his work to develop a ternporary inspection module. This report provides a compilation of that data as well as additional operating experience.
I believe that the operating experience enumerated in this report particularly on maintenance, surveillance, and procedural problems, will be of use to NRR in developing procedures for the upcoming electrical team inspections.
Failures addressed in this report include major equipment failures which is addressed in AE0D/E905, " Electrical Bus Bar failures," and in on-going studies on main transformer f ailures and f ailure of the fast bus transfer scheme.
We are forwarding this Engineering Evaluation to you for your information.
If you have any questions or comments, please do not hesitate to contact me or Mary S. Wegner (x27818) of my staff. We shall be happy to meet with you or your staff to discuss this matter, g' igir.s1 M 38 0 #d Thomas M. Novak Dirfetor Division of Safety Programs, AEOD
Enclosure:
As stated cc w/ enclosure:
F. Rosa, NRR G. Imbro, NRR J. Zwolinski, NRR S. Athavale, NRR W. Johnston, Region 1 DISTRIBUTION:
FPk.
MChiramal Dross MTaylor, EDO DQueener, NOAC i
trat filo JRosenthal SRubin KRaglin, TTC
/%l
' OAB R/F MWilliams GZech PDaranowsky. NRR DSP R/F KBlack LSpessard Hraulkner. IP f
MWegner EJordan RSavio, ACRS JWheelock, INP0
'SEE PREVIOUS CONCURRENCE ROAS:DSP:AEOD*
ROAB:DSP:AEOD* ROAB:DSP:AEOD* D:DSP:AEOD*
OD e
d MWegner MChiramal JRosenthal VBenarcya 1
k 11/ /89 02/09/89 02/12/90 02/13/90 03/
0 dr PDR ORG NEXD
~
d I
I 9004130063 900329 pj ij
\\
i r
l MEMORANDUM FOR: Charles E. Rossi, Director-Division of Operational Events Assessment, NRR r
Brian K. Crines, Director Division of Reactor Inspection and Safeguards, NRR FRON:
Thomas M. Nevak, Director Division of Safety Programs,1.EOD
SUBJECT:
FAILURES OF ELECTRICAL SUPPLY AND POWER GENERATION EQUIPMENT WHICH DISRUPTED PLANT TUNCTION AT NUCLEAR POWER PLANTS Enclostd is the subject engineeri.,g analysis. This study was initiated becaust of tLa occurrence of several events in early 1989 involving major electrical equipa+nt or offsite power problems. The itsues addressed in this re cern disruptions of normal station auxiliary alternating current (AC) port con-l power supply caused by grid, switchyard, and r.on-1E electrical system problems ard major electrical equipnent f ailures.
Failures addressed in this report include major equipment failures which is addressed in AEOD/E905, " Electrical Bus Bar Failures," and in on-going studies on main transformer failures and failure of the fast bus transfer scheme.
I believe that the opert. ting experience enurerated in this report particularly on maintenance, surveillance, and procedural problems, will be of use to NRR in developing procedures for the upcoming electrical team inspectinns.
We are forwarding this Engineering Evaluation to you for your information, if you have any questions or comments, please do not hesitate to contact me or Mary S. Wegner (x27818) of any staff. We shall be happy to neet with you or your staff to discuss this matter.
Thomas H. Novak, Director i
Division of Safety Progr6ms, AE00
Enclosure:
As stated cc w/ enc bsure:
F. Rosa, NRR J. Zwolinski, NRR L
l PDR MWegner HW1111ams HFau1Lner CHaughney Central File MChiramal VBenaroya HTaylor BBrady ROAB R/F JRosenthal TNovak (CHeltemes DSP R/F KD1ack LSpessar EJordan
- SEE PREVIOUS CURRENCE l
ROAB:DSP:AE0D*
ROAB:DSP:AE0D PGA SP:AE0D D:DSP:AEOD DD:DSP:AE00 HWegner HChirama1Q JRosenthal VBenaroya TNovak 11/ /89 12/o /89 02/ft/90 02/p/90 02/ /90
)
-.. - s
y r
t
]
- i.
- MEMORANDUM TOR: Charles E. Rossi, Director Division of Operational Events Assessment, NRR Crian K. Grimet, Director Division of Rearter Inspection and Safegutred, NRR FROM:
Thomas M. Novak, Director Division of Safety Programs, AE00
SUBJECT:
FAILURES OF ELEC1RICAL SUPPLY AND POWER GthERATION EQUIPMENT WHICH DISkUPTED PLANT FUNCTION AT NUCLEAR
'u POWER PLANTS Enclosed is the subject engineering analysis.
This study was initiated because of the occurrence of several events in early 1989 invc1ving major electrical The issues addressed in this re equipment or offs'te power problems.cern disruptions of normal station auxiliary altern power supply caused by grid. switchyard, and'non-1E electrical system problems and major electrical equipment failures, failures eddressed in this rNort include major equipment failures which it eddressed in AE0D/E905, " Electrical Eus Der failures," and an on-going study on main transformer failures; failure of the fast bus transfer scherne which is being addressed in an on-going AE00 studys and various maintenance and surveil.
lance problems.
I t'elieve that this report and the findings and conclusion are relevant to the upcoming electrical team inspections by the Division of Reactor Inspection and Safeguards (DRIS/NRR) for configuration management of the' electrical distribution system.
We are forwarding this Engineerirg Evaluation to you for your information and me or Mary S. Wegner (questions or comments, please do not hesitate to contact use. ' If you have any F27818) of my staf f.
We shall be happy to meet with you or your staff to discuss this matter.
Thomas M. Novak, Director Division of Safety Programs, AEOD
Enclosure:
As stated cc w/ enclosure:
0 F. Rosa, NRR J. Zwolinski, NRR G. Imbro, NPR S. Athavale, NRR W. Johnston, Region 1
' Distribution:
PDR Wegner MWilliams HFau1Lner CHaughncy Central file MChiramal VDenaroya MTaylot BBrady s
}'>