ForwardsBulletin 74-08, Deficiency in Ite Molded Case Circuit Breakers,Type HE-3. Action Required
ML20037B370
Person / Time
Site: Dresden, Quad Cities, Zion, LaSalle  
Issue date: 08/02/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 8009240798
Download: ML20037B370 (1)


Text

_ _ _ _ _ _.

UNITED STATED

^

L.'

p.

ATOMIC ENERGY COMMISSION i

v i DIRECTORATE OF REGULATORY OPERATIONS l

REGION Ill 4s 799 ROOSEVELT ROAD m

GLEN ELLYN ILLINOIS 60137 (312) ass-?tso AUG 2 1974 e

t' - 1th Edir.on Company Dockat No.giO.-

A2TH: 1er. Byron Lee, Jr.

Docket No.

237 Vie.a Pra=ia-t Docket No.54-249 P.O. Boz 767 Docket No. 50-254 tm4---

, Illinois 60690 Pookat No. 50-265 i

Docket No. 50-295 Docket No. 50-304 Dock.et No. 50 373 Docket No. 50-374 Gentlemen:

j The =ela==d DRO Bulletia No. 74-8, %#4c4-y in ITE *1 dad Case j

Cirenait 3reakers, Typt HI-3," is aest to provide you with information reported by Portland General Blactria Company as a del M -- y identified at the Trojat reactor facility.

This informattom may have appliambility at your facilities. Action requested on your part is identifid in Section B of the =neta==d Bullatin.

i Sincerely, i

I James G. Kappler UIISCISE

)

1 hei nauwer DRO hilatin No. 74-8 i

bec: DR Central 711es RO Files PDR j

Local PDR OGC, Beth, P-506A GC (2)

Anthony Roissan i

Pi;0R GEGl#AL 8009240]98 L

~

U m

c e-August 2, 1974 DRO Bulletin No. 74-8 DEFICIENCY IN TE ITE MOLDED CASE CIRCUIT BREAKERS, TYPE E-3 We recently received information from the Portland General Electric Company describing a deficiency of the magnetic trip elements in ITE Type E-3 molded case circuit breakers, current rating of 20-90 amperes, that was discovered during preoperational testing at the Trojan nuclear power plant. This model circuit. breaker could be used in any nuclear I

power plant.

K.

Description cf Circumstances The pickup points for the magnetic (instantaneous) trip elements are substantially higher than the published ITE time-current 8

curves'for these breakers.

Portland General Electric Company stated that (1) the excessively high pickup points of the instantaneous trip elements cottid lead to undetected cable damage due to overheating under certain fault conditions and (2) trip coordination of these breakers with the upstream load center breakers may also be adversely affected.

Therefore, ITE is replacing all of the Type HE-3 breakers delivered to Trojan with new, modified HE-3 breakers.

The modified breakers utilise a different magnetic structure which ITE released for production on similar breakers (150A Frame) two years ago.

ITE stated that all HE-3 breakers dated May 1974 and later will have the new magnetic structure.

Further, ITE will perform 100% inspection on all replacement breakers to ensure that required time-current trip range limits are met when tested one pole at a time. The 20A through 40A and the 50A through 90A breakers will be tested to meet the fixed instantaneous trip setting shown on the manufacturers appropriate time-current characteristic curve.

Breakers which successfully pass these trip range limits will satisfy the cable protection and breaker coordination requirements.

It should be noted that normal production testing would not be expected to reveal this problem. Portland General Electric has been advised that this particular breaker model has been manufactured by ITE since 1963/1969.

OU GL y

sp5f3

-)

r g.

o' e-2-

B.

Action Requested

/

4 l

It is requested that you notify the RO Regional Office in writing, within 20 days:

(1) whether or not similar circumstances or 'the potential for similar circumstances deceribed above exist at your facilty for Class IE equipment', or (2) the date(s) when action to determine whether a similar circumstance exists will be completed.

If the findings as a result of the action above indicate that similar circumstances exist, the specific findings together with the description of the corrective action taken or planned, including the scheduled completion date of the planned corrective action should be submitted to this office within 20 days of the findings.

1 If there are no such units at your facility, a negative report is requested.

~