ML20042B417

From kanterella
Revision as of 18:32, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 47 to License DPR-61
ML20042B417
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/19/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20042B409 List:
References
NUDOCS 8203250293
Download: ML20042B417 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-213 CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT:

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE

-The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 47 to Facility Operating License No. DPR-61, to: -

Connecticut Yankee Atomic Power Company (the licensee), which revised the Technical Specifications for operation of the Haddam Neck Plant (the facility) located in Middlesex. County, Connecticut. The amendment is i

effective as of its date of issuance.

The amendment approves changes.to the Appendix A Technical Specifi-cations to ensure the accuracy of the Control Rod Position Indication System.

i The application for the amendment complies with the standards and require-l ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required l

by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and the pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the j

issuance of this amendment.

L 8203250293 820319 PDR ADOCK 05000213 P

PDR

7590-01

't.

.. For further details with respect to this action, see (1) the application for amendment dated February 1, 1982, (2) Amendment No. 47 to License No.

DPR-61, and (3) the Commissien's related Safety Evaluation. All of these items are available for public' inspection at the Commission's Public Document Room,1717 H Street, N'W.', Washington, D. C., and at the Russell Library,119 Broad Street, Middletown, Connecticut 16457. A copy of items (2) and (3) may be obtained upon request addressed to the U.' S. Nuclear Regulatory Commission, Washington, D. C., 20555, Attention:

Director,

~

Division of Licensing.

f FOR THE NUCLEAR REGULATORY COMMISSION

. :3A.LJA&!

Den'nWrI.'Crutchfield, C[ef Operating Reactors Branch #5 Division of Licensing l

Dated at Bethesda, Maryland, this 19th day of March 1982.

I l

t

, - -,