ML20045F008

From kanterella
Revision as of 11:16, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed TS 3.9.12, Fuel Handling Bldg/Auxiliary Bldg Air Cleanup Sys
ML20045F008
Person / Time
Site: Crane 
Issue date: 06/29/1993
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20045F005 List:
References
NUDOCS 9307060305
Download: ML20045F008 (4)


Text

.

THREE MII.E ISLAND - UNIT 2 i

TECHNICAL SPECIFICATIONS APPENDIX A i

F i

9 T

h 9307060305 930629 R

PDR.ADDCK 05000320

$3 P

PDR kg

t LIMITING CONDITIONS FOR OPERATION b.

With no Fuel Transfer Canal (deep end) water level instruments OPERABLE, terminate all activities involving any Canister containing core material in or over the Fuel Transfer Canal (deep end) and/or all activities involving the plenum assembly and all operations l

involving changes in the Fuel Transfer Canal (deep end) water inventory and restore one

[

inoperable instmment to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I FUEL TRANSFER CANAL (DEEP END) WATER LEVEL 3.9.4 The water level in the Fuel Transfer Canal (deep end) shall be maintained at the level specified in Section 4.9.4 of the Recovery Operations Plan.

l APPLICABILITY: MODE 1

[

ACTION:

I a.

With the Fuel Transfer Canal (deep end) water level not within the specified band, i

tenninate all activities involving any Canister containing core material in or over the Fuel Transfer Canal (deep end) and/or all activities involving the plenum assembly and restore i

the water level to within specification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

FUEL HANDLING BUILDING / AUXILIARY BUILDING AIR CLEANUP SYSTEMS 3.9.12.1 The Fuel Handling Building Air Cleanup Exhaust System shall be OPERABLE with one of the four system air cleanup exhaust fans OPERABLE.

l A_PPLICABILITY: MODES 1,2 and 3 i

ACTION:

-i With the Fuel Handling Building Air Cleanup Exhaust System inoperable, restore the system to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or, suspend all operations involving movement of liquid and solid radioactive wastes in the Fuel Handling Building (other than sampling evolutions required by the Technical Specifications or RECOVERY OPERATIONS PLAN), the release of which could exceed 50% of the OFFSITE DOSE CALCULATION MANUAL instantaneous release rate for gaseous effluents, until the system is restored to OPERABLE status.

l THREE MILE ISLAND - UNIT 2 3.9-2 Amendment 30

LIMITING CONDITIONS FOR OPERATION i

3.9.12.2 The Auxiliary Building Air Cleanup Exhaust System shall be OPERABLE with one of the four system air cleanup exhaust fans OPERABLE.

t APPLICABILITY: MODES 1,2, and 3 ACTION:

With the Auxiliary Building Air Cleanup Exhaust System inoperable, restore the system to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or, suspend all operations involving movement of liquid or solid radioactive wastes in the Auxiliary Building (other than sampling evolutions required by the Technical Specifications or RECOVERY OPERATIONS '

PLAN), the release of which could exceed 50 % of the OFFSITE DOSE CALCULATION MANUAL instantaneous release rate for gaseous effluents, until the system is restored to OPERABLE status.

?

ACCIDENT GENERATED WATER 3.9.13 ACCIDENT GENERATED WATER shall be disposed of in accordance with NRC-approved procedures.

APPLICABILITY: MODES 1,2 and 3 ACTION:

None except as provided in Specification 3.0.3.

r i

i TIIREE MILE ISLAND - UNIT 2 3.9-3 Amendment 35 l

o 3/4.9 RADIOACTIVE WASTE STORAGE i

BASES i

3/4.9.1 SPENT FUEL STORAGE POOL "A" WATER LEVEL MONITORING I

Spent Fuel Storage Pool Water "A" Izvel Monitoring instmmentation has been provided to assure the capability to monitor water level in the Spent Fuel Storage Pool "A".

3/4.9.2 SPENT FUEL STORAGE POOL " A" WATER LEVEL 9

The water level in the Spent Fuel Storage Pool "A" has been established to limit the dose rate, due to the storage of Canisters, to acceptable levels.

j i

3/4.9.3 FUEL TRANSFER CANAL (DEEP END) WATER LEVEL MONITORING Fuel Transfer Canal Water Ixvel Monitoring instmmentation has been provided to assure the capability to monitor water level in the deep end of the Fuel Transfer Canal.

3/4.9.4 FUEL TRANSFER CANAL (DEEP END) WATER LEVEL The water level in the Fuel Transfer Canal (deep end) has been established to limit the dose rate, f

due to the storage of the plenum assembly and Canisters, to acceptable levels.

3/4.9.12 FUEL HANDLING BUILDING / AUXILIARY BUILDING AIR CLEANUP SYSTEMS i

The requirement for the Fuel Handling Building / Auxiliary Building Air Cleanup System to be operating or OPERABLE ensures that radioactive material released to these buildings will be filtered through the HEPA filters prior to release to the atmosphere. In the event the systems l

are not restomd to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, the Technical Specifications require the

?

suspension of any liquid or solid radioactive waste handling, the release of which could exceed 50% of the instantaneous release rate limits for gaseous effluents specified in Pan II Section 2.1.2 of the OFFSITE DOSE CALCULATION MANUAL. These restrictions correspond to solid radioactive waste with a total activity of greater than 1 curie of particulates with half-lives greater than eight (8) days and liquid radioactive wastes with an activity greater than 0.5 curies of particulates with half-lives greater than eight (8) days.

f 3/4.9.13 ACCIDENT GENERATED WATER These specifications are provided to ensure compliance with the Commission's Statement of l

May 25,1979, and the Comraission's Statement of Policy and Notice ofIntent to Prepare a j

' Pmgrammatic Environmental Impact Statement of Novembe.r 21,1979, which prohibit these -

l actions pending evaluation of the environmental impacts of such actions. The PEIS issued in March,1981, deferred a decision on the ultimate disposal of processed water.

Funher

~

Commission action is necessary prior to re. lease of ACCIDENT GENERATED WATER.

l TIIREE MILE ISLAND - UNIT 2 B 3/4.9-1 Amendment 30 i

-.-