3F0793-06, Informs That Addl Time Required to Complete Final Review of Procedure Completed,Per Commitment Made in Util 920904 & s for Resolution of USI A-46 by 930630.Anticipates Submittal of Procedure by 930731
| ML20045G216 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/01/1993 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR 3F0793-06, 3F793-6, GL-87-02, GL-87-2, NUDOCS 9307130056 | |
| Download: ML20045G216 (1) | |
Text
.
G'V Florida Power CORPORATION UNEN July 1, 1993 3F0793-06 U. S. Nuclear Regulatory Commission l
Attn: Document Control Desk Washington, D. C.
20555
Subject:
Generic Letter 87-02, Supplement 1 Verification of Seismic Adequacy of Equipment in Older Operating Nuclear Plants
References:
1.
FPC to NRC letter, 3F0992-02, dated September 4, 1992 2.
FPC to NRC letter, 3F0493-09, dated April 16, 1993
Dear Sir:
In References 1 and 2, Florida Power Corporation (FPC) committed to submit the plant specific procedure for resolution of Unresolved Safety Issue (VSI) A-46 by June 30,1993. The procedure has been completed. However, additional time will be required to complete a final review. We anticipate submittal of the procedure and supporting justification for deviations from the Generic Implementation Procedure (GIP) by July 30, 1993.
Sincerely, M Beard, Jr.
Senior Vice President Nuclear Operations PMB/AEF:ff xc:
Regional Administrator, Region 11 NRR Project Manager Senior Resident Inspector 090025 CRYSTAL RIVER NUCLEAR PLANT: Powerline Road