ML20057B308
| ML20057B308 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/13/1993 |
| From: | Maynard O WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20057B309 | List: |
| References | |
| WO-93-0161, WO-93-161, NUDOCS 9309210181 | |
| Download: ML20057B308 (1) | |
Text
-
l s
~
WTaLF CREEK 1
NUCLEAR OPERATING CORPORATION 4
Otto L Maynard vice neent mant opmuons September 13, 1993 l
U. S. Nuclear' Regulatory Commission ATTN: Document Control Desk Mall Station F1-137 Washington, D. C. 20555
{
Subject:
Docket No. 50-482: August, 1993. Monthly Operating Report Gentlemen:
Attached is the August, 1993, Monthly Operating Report for Wolf Greek Generating Station.
This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.
Also attached are revised pages to the June and July, 1993, Monthly
[
Operating Reports which have been revised to correct discrepancies contained in the original submittals.
The Maximum Dependable Capacity (MDC) was changed from 1131 MWe-Net to 1134 MWe-Net on June 1, 1993, as a result of MOKAN power pool capabilities testing.
Very truly yours,
^
$/)4XAs
(
&W /
/
Otto L. Maynard Vice President Plant Operations OLM/jan Attachments (3) cc W. D. Johnson (NRC), w/a J. L. M11hoan (NRC), w/a G. A. Pick (NRC), w/a V. D. Reckley (NRC), w/a 2000 %
/
PC. Box 411/ Burhngton. KS 06839 / Phone: (316) 3644931 9309210181 930913 P*
An Equal Opp 0rtunity Employer M T rHC/ VET PDR ADOCK 05000482 p,
{
R PDR C;
_