ML20062C736

From kanterella
Revision as of 00:02, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Response to Weakness Identified in Insp Repts 50-369/90-15 & 50-370/90-15.Actions Will Be Completed by 900620
ML20062C736
Person / Time
Site: McGuire, Mcguire  
Issue date: 10/25/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9011020092
Download: ML20062C736 (2)


Text

'"

l

-e

  • Duke 1% wr Comtrany lin il T?nn PC thn 33)98 l'ne Prend*nt '

Chailotte, N C 28242 Nudear Production (7tM)373 4531 DUKEPOWER October 25, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-

Subject:

McGuire Nuclear Station-Docket Nos. 50-369, 370-Inspection Report Nos.'369, 370/90-15 Response to Identified Weakness Gentlemen:

)

'l Pursuant to 40CFR.201 please' find attached Duke Power. Company.'s response.to-a'-

J weakness identified in the subject inspection for the McGuire Nuclear:Stai.c.

Should there be any questions concerning this' matter, contact W._ T. Byers at-(704) 373-6194.

Very truly yours, a

/[A 6, (5 +cf2% gr Hal B. Tucker l

SAG 240/td Attachment cc:

Mr.-S. D. Ebneter 1

Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, GA 30323 Mr. Tim Reed ~

t U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555

. j Mr.. P. K. VanDoorn NRC Resident-Inspector

. ll McGuire Nuclear' Station I

l 1

OiO

~'

p o

y go/

Alt

r-i, McGuire Nuclear Station Response to Weakness i

Weakness 50-369, 370/90-15-02 i

Failure of the OSC to adequately manage and control teams.

Response

l In response to this weakness, the Licensee will develop an OSC task work sheet for the control of work tasks and radiological controls. The task ~ work sheets.

will also be used for team briefings. The Licensee will cvaluate I

re-organizing the OSC personnel structure to include additional management in -

1 specific disciplines represented in the OSC.

Step off pads and frisking-instruments will be added to the Radiation Protection suppliesEto use for 1

cnntamination controls. All of the above actions will be completed by June 20, 1991, i

1 i

l i,

1

..)

l

,