- q.
i g Entcrgy 1
N m.m
,.,.uon., ino.
o
=
[gg 3,,
Operations um' e
c ;a. y 4n.;
Raymond F. Durski ea a t
%w
,r W3P90-1559 A4.05 OA December 14, 1990 U.S. Nuclear Regulatory Commission
= NITN: Document Control Desk Washington, D.C. 20555
Subject:
Waterforu 3 SES Docket No. 50-382 License No. NPF 38 lNRC Inspection Report 9016 Additional Information Gentlemen:
By letter dated October 18,1990 (W3P90-1514) Waterford 3 submitted corrective action for deviations identified in NRC Inspection Report 90-16. In response to NRC questions concerning W3P90-1514, L.rford 3 and the NRC conducted a telephone conversation November 13,1990 to obcass the response to those questions. This letter serves to docuraent the results of that conversation and the action that was agreed to
- during the discussion.
In addition to the corrective acnon stated in W3P904514, the following interim corrective actic, will also be implemented:
Temporary labeling of RG 1.97 instruments on the Control Panels will be completed by January 15, 1991 with the exception of recorders for Condensate Storage Pool Level, Pressurizer Level, Reactor Coolant System flot and Cold Leg Temperatures and Steam Generator Wide Range Level. The evaluation of the 1983 submittal for RG 1.97 Instrumentation, which is expected to be completed-by December 31,1990, indicates that Design Changes will be required to bring these recorders into compliance with RG 1.97 requirements. Upon completion of-
- the design changes, the above recorders will be appropriately labeled.
(
Licensed shift operators will be given on-shift training with regard to the temporary labehng. The shift training will be completed by February 28,1991
/
9012190203 901214
,PDR; ADOCK 05000382
/
l (Q;..
PDR I
C
',g..
1 TV31'901559
= NRC Inspection Report 90-16 Additional Information December 14, 1990 Page 2 If you have any questions concerning these responses, please contact L.W. Laughlin at (504) 739 6331.
Very truly yours, Jua RFB/BGM/cmb cc: Messrs. R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR E.L. Blake R.B. McGehee 7