ML20071B461

From kanterella
Revision as of 08:47, 16 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fourth Interim Deficiency Rept 54 Re Tube Steel (Ht 16600) Laminations.Corrective Action Described in Not Completed.Final Rept Will Be Submitted by 830318
ML20071B461
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/17/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 54, W3I83-0058, W3I83-58, NUDOCS 8302280329
Download: ML20071B461 (1)


Text

LOUISIANA P O W E R & L 1 G H T! R o. Box soos. NEW ORLEANS. LOUISIANA 70174 242 octARoNoe S m ter

. (504) 366-2345

$ U N 5YS E February 17, 1983

t. v. MAunin Vee President Nuclear Operations W3I83-0058 Q-3-A35.07.54 Mr ohn T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission kp 611 Ryan Plaza Drive, Suite 1000 1

g 221983 n i:

Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 1

Docket No. 50-382 Significant Construction Deficiency No. 54

" Tube Steel (HT 16600) Laminations" Fourth Interim Report

REFERENCE:

LP&L letter W3K82-0271 dated May 11, 1982

Dear Mr. Collins:

At the present time, the corrective action as described in the reference above has not yet been completed.

A final report will therefore be submitted by March 18, 1983.

Very truly yours,

//

/7 Nfaud L. V. Maurin LVM/ MAL:keh cc:

1) Director 3)

E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

W. M. Stevenson j

Office of Management j

Information and Program Control U. S. Nuclear Regulatory Commission l

Washington, D. C.

20555 Y

B302280329 830217 PDR ADOCK 05000382 S

PDR