ML20071B461
| ML20071B461 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/17/1983 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 54, W3I83-0058, W3I83-58, NUDOCS 8302280329 | |
| Download: ML20071B461 (1) | |
Text
LOUISIANA P O W E R & L 1 G H T! R o. Box soos. NEW ORLEANS. LOUISIANA 70174 242 octARoNoe S m ter
. (504) 366-2345
$ U N 5YS E February 17, 1983
- t. v. MAunin Vee President Nuclear Operations W3I83-0058 Q-3-A35.07.54 Mr ohn T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission kp 611 Ryan Plaza Drive, Suite 1000 1
g 221983 n i:
Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 1
Docket No. 50-382 Significant Construction Deficiency No. 54
" Tube Steel (HT 16600) Laminations" Fourth Interim Report
REFERENCE:
LP&L letter W3K82-0271 dated May 11, 1982
Dear Mr. Collins:
At the present time, the corrective action as described in the reference above has not yet been completed.
A final report will therefore be submitted by March 18, 1983.
Very truly yours,
//
/7 Nfaud L. V. Maurin LVM/ MAL:keh cc:
- 1) Director 3)
E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
W. M. Stevenson j
Office of Management j
Information and Program Control U. S. Nuclear Regulatory Commission l
Washington, D. C.
20555 Y
B302280329 830217 PDR ADOCK 05000382 S