Notifies of Intent to Extend Second 10-yr ISI Interval for Bsep,Units 1 & 2 from 960710 to 970710
ML20072B899
Person / Time
Site: Brunswick  
Issue date: 08/05/1994
From: Lopriore R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-94-0302, BSEP-94-302, NUDOCS 9408160291
Download: ML20072B899 (2)


Text

.

cpat l

Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461-0429 August 5,1994 SERIAL: BSEP 94-0302 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50 325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 SECOND INSERVICE INSPECTION INTERVAL EXTENSION Gentlemen:

The purpose of this letter is notify the NRC Staff of CP&L's intent to extend the Second 10-Year Inservice Inspection Interval for both Brunswick Unit 1 and Unit 2 from July 10, 1996 to July 10,1997.

American Society of Mechanical Engineers (ASME)Section XI, IWA-2400(c), states in part that, "... for power units that are out of service continuously for 6 months or more, the inspection interval during which the outage occurred may be extended for a period equivalent to the outage.." Both Brunswick Units 1 and 2 were shutdown on April 21, 1992 and Unit 2 was restarted on April 29,1993, and Unit 1 was restarted on January 31,1994. Therefore, the Second 10-Year Inservice inspection interval will be extended by one year to coincide with plant outages due to both units being shutdown for a period of time greater than one year.

In addition, to coincide with the above discussed interval extension, the second and third inspection periods of the Second inservice Inspection Interval have been changed. The dates for the second inspection period are from November 11,1989 to March 10,1994, and the dates for the third inspection period are from March 11,1994 to July 10,1997.

9408160h91d40805 D

DR ADOCK 05000324

(

t PDR

\\

~

e Document Control Desk BSEP 94-0302 / Pago 2 Please refer any questions regarding this submittal to Mr. G. Honma at (910) 457-2741.

Very truly yours, i

k' R. P. Lopriore Manager Regulatory Affairs Section SHC/she Qinspint. ext) cc:

Mr. S. D. Ebneter, NRC Region 11 - Regional Administrator Mr. P. D. Milano, NRC/NRR Senior Project Manager - Brunswick Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswick The Honorable H. Wells, Chairman - North Carolina Utilities Commission

.