Rev to 940513 TS Change Request 94-05 to License DPR-44, Extending Type a Test Interval on one-time Basis,Replacing TS Page 167 to Provide Exception Re Third Type a Test in Second 10-yr Svc Period
ML20072P730
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/28/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072P733 List:
References
NUDOCS 9409080194
Download: ML20072P730 (3)


Text

St:tlin Support Dipartmant 10 CFR 50.90

_+_

ZZ.T

-p PECO ENERGY

=,Teg;;en,,

965 Chesterbrook Boulevard Wayne. PA 19087 5691 August 28,1994 Docket No. 50-277 License No. DPR-44 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 2 Revision to Technical Specifications Change Request No. 94-05

Reference:

Letter from G. A. Hunger, Jr. (PECO Energy) to U. S. Nuclear Regulatory Commission dated May 13,1994

Dear Sir:

In the above referenced letter, PECO Energy Company submitted, in accordance with 10 CFR 50.90, Technical Specifications Change Request (TSCR) No. 94-05 which requested a change to Appendix A of the Peach Bottom Facility Operating Ucense No. DPR-44. The proposed change would extend the Type A test (i.e., Containment Integrated Leak Rate Test (CILRT))

interval on a one-time basis for Peach Bottom Atomic Power Station (PBAPS),

Unit 2.

PECO Energy Company hereby requests toat our original submittal be revised such that the submitted page 167 be deleted and replaced with the attached page 167 for PBAPS, Unit 2.

The current PBAPS, Unit 2 Technical Specification Surveillances Requirement 4.7.A.2.c.2 requires that a set of three Type A tests be performed at approximately equal intervals during each 10-year period. Page 167 of the PBAPS, Unit 2 Technical Specifications was submitted with proposed wording that would delete the Technical Specifications requirement to perform a CILRT during the upcoming PBAPS, Unit 2 refueling outage 10 scheduled to occur the Fall of 1994. These words are being further clarified to provide the eneption that the third Type A test (CILRT) in the second 10-year service peric j will not be performed, and that the CILRT will be performed during the PBAPG, Unit 2 refueling outage 11, currently scheduled for September 1996.

8 g F E M M8"ll;7

)q,

August 28,1994 t

Page 2

' We have concluded that this clarification does not alter our evaluation of any of the 10 CFR 50.59 standards, and therefore, does not effect our conclusion that TSCR No. 94-05 does not constitute an unreviewed safety question. We have.

s!so concluded that the proposed revision does not affect the information Supporting a Finding of No Significant Hazards Consideration'and the information Supporting an Environmental Impact Assessment.

If you have any questions, please contact us.

Very truly yours, Cf)( 0. Er f0f G. A. Hunger, Jr.

Director - Licensing Attachment cc:

T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania P

a

. COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF CHESTER W. H. Smith, lil, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the enclosed information concerning Technical Specifications Change Request (Number 94-05) for Peach Bottom Facility Operating Ucense DPR-44, and knows the contents thereof; and that the statements and matters set forth therein are

^

true and correct to the best of his knowledge, information and belief.

V Vice President Subscribed and sworn to before me this c8 ay of 1994.

/

s Not6ry Public

]

wa :PAm JcatssWs%%