ML20077M249

From kanterella
Revision as of 01:17, 15 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppl to 830610 Final Deficiency Rept Re Cooling of RCIC During LOCA Conditions.Reviews of Safety Sys Will Be Completed on 830930,design Mods on 831201 & Implementation of Mods on 840324
ML20077M249
Person / Time
Site: Perry  
Issue date: 08/16/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-72(83), NUDOCS 8309120286
Download: ML20077M249 (1)


Text

_ _ _ _ - _

'" d L Pj 6 }8 tl Ci fA T D. 4 [

{<

D s. C if C !

L i L fi t i U'

} L i i

,e s

-,i :'

t i 1; L 4

P.o. Box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-?800 - ILLUMihTING BLOG.

- 55 PUBLICSQUARE Serving The Best Location in the Nation alicCIPAL STAFF

/

MURRAY R. EDELMAN 7

CE PRESIDENT August 16, 1983

-s g7 v@RP Nj3)'D (t

+/

R:A

/<C DP)$P /

N h

Mr. James G. Keppler DE f x

Regional Administrator, Region III Mt/

\\<

Office of Inspection and Enforcement of.

, FILE

\\

U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Cooling Of The Reactor Core Isolation Cooling Room (RDC 72(83)

Dear Mr. Keppler:

Our final report to you dated June 10, 1983, concerning cooling of the Reactor Core Isolation Cooling (RCIC) room during Loss of Cooling Accident (LOCA) conditions stated that the anticipated completion of corrective action relative to this subject would be by July 29, 1983.

As discused between Mr. B. D. Walrath of The Cleveland Electric Illuminating Company and Mr. P. R. Pelke of your office on August 3,1983, we now anticipate that we will be complete with the review of the Safety Systems by September 30, 1983, the design modifications by December 1, 1983 and implementation of the modifications by March 24, 1984.

Please call if there are additional questions.

Sincerely, Murray R.

delman

)

Vice President Nuclear Group cc:

Mr. M. L. Gildner U. S. Nuclear Regulatory Commission NRC Site Office c/o Document Management Branch Washington, D. C.

20555 Director Office of Inspection and Enforcement Records Center, SEE-IN U. S. Nuclear Regulatory Commission Institute of Nuclear Power Operations i

Washington, D. C.

20555 1100 circle 75 Parkway, Suite 1500 3]

Atlanta, Georgia 30339

$G22 N 8309120286 830816 l

PDR ADOCK 05000440 8

PDR r.

. - _ _ - - _ _ _ _ _ - _ _ _ _ _ - - - _ _ _ _ _ _