Requests NRC Exercise Enforcement Discretion for Plant,Units 1 & 2 Concerns Decreasing Frequency of Surveillance Testing Required TS 3.6.4.1 to Position Verification of Drywell Suppression Chamber Vacuum Breakers
ML20078B944
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/08/1994
From: Richard Anderson
CAROLINA POWER & LIGHT CO.
To: Lainas G
Office of Nuclear Reactor Regulation
References
NUDOCS 9501260103
Download: ML20078B944 (11)


Text

.

~"

  • y Cp&L CaroEna Power 8: Lleht Company Roy A. Anderson l

PO Box 1o429 Vice President Southport NC 28461 Brunswlok Nuclear Plent 910 467 2498 September 8,1994 SERIAL: BSEP 94 0354 U. S. Nuclear Regulatory Commission ATTENTION: Mr. Gus C. Lainas Assistant Director for Region ll Reactors Division of Recator Projects 1/11 Mice of Nuclear Reactor Regulation Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR ENFORCEMENT DISCRETION DRYWELL SUPPRESSION CHAMBER VACUUM BREAKERS

Dear Mr. Lainas:

The purpose of this letter is to request the Nuclear Regulatory Commission exerclae enforcement discretion for the Brunswick Steam Electric Plant, Unit 1 (hereafter referred to as BNP). The proposed enforcement discretion concerns decreasing the frequency of surveillance testing required by Technical Specification 3.6.4.1, ACTION c with respect to position verification of the drywell-suppresalon chamber vacuum breakers.

BNP Unit 1 la experiencing a problem with the position indicator for the 1-CAC-X18C drywell suppression chamber vacuum breaker. Based on testing that has been performed, the " closed" indicator for this valve is not functioning properly and la thereby inhibiting the ability to verify that the affected vacuum breaker is closed. Technical i

Specification 3.6.4.1, ACTION c requires that the performance of surveillance testin0 overy 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in accordance with Technical Specification 4.6.4.1.b whenever the position indicator of any drywell-suppression chamber vacuum breaker is inoperable.

This amendment request will revise the frequency for verifying the position of the drywell-suppression chamber vacuum breakers from at least once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days. The proposed change is consistent with the testing frequer.cy for this equipment that is stipulated in the improved Bolling Water Reactor Stend.rd Technical Specifications (NUREG 1433). contains specific information in support of the request for enforcement discretion.

9501260103 940900

}1 PDR ADOCK 05000324 I

P PDR 2$0hOl h(. h.

l Qp: alm bnkhoggx

I SEP 13 '94 02:24m gp g g

.3 4.,

Mr. Gus. C. Laines i

BSEP 94-0354 / Page 2 i

i 1'

J The proposed enforcement discretion is being requested to allow sufficient time for j

j Carolina Power & Ught Company to prepare and submit and the NRC to review and approve a expedited license amendment request. Carolina Power & Light Company requests the NRC approve the use of the enforcement discretion effective on Sunday,"

September 11,1994 at 12 Noon. Carolina Power & Light Company will submit a request j

for an exigent license amendment by the close of business on Friday, September 9,1994, t

l Please refer any questions regarding this submittal to Mr. R. P. Lopriore at (910)457-2212.

4 Very truly yours, i

f l

y A. Anderson i

l WRM/wrm

(

j Enclosures l

Roy A. Anderson, having been first duly sworn. did depose and say that the information l

contained herein is true and correct to the best of his information, knowledge and belief:

j and the sources of his information are officers, employees, and agents of Carolina Power &

,- Light Company.

4 JAN1

/du_

(

Motary (Seal) /

)

i

't My commission expires:

pc:

Mr. Gus C. Laines, Regional Administrator, NRC Region ll Mr. P. D. Milano, NRR Senior Project Manager - Brunswick Units 1 and 2 Mr. C. A. Patterson, NRC Senior Resident inspector - Brunswick Units 1 and 2 Mr. Dayne H. Brown, State of North Carolina i

The Honorable H. Wells, Chairman - North Carolina Utilities Commission i

NRC Document Control Desk l

i i

i l

I SEP 13 '94 02:24PM BNP tED t1ANAGER P.4

}

i Mr. Gus. C. Lainas f

BSEP 94 0354 / Page 3 i

J i

bpc: Mr. D. B. Hunt Mr. W. R. Murray j

Subject File B-X-0333.8 i

f i

i 4

i i

i a

e i

i i

h i

i i

i i

i

.i J

t 4

i a

i 1

s j

J i

. SEP 13 '94 02:24PM BNP NED mar %ER pg i

ENCLOSURE 1 I

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-326 & 50 324/ LICENSE NOS. DPR 71 & DPR 62 REQUEST FOR ENFORCEMENT DISCRETION l

DRYWELL SUPPRESSION CHAMBER VACUUM BREAKERS i

1' 1

REQUIREMENTS FOR WHICH ENFORCEMENT DISCRETION IS REQUERTED:

Technical Specification 3.6.4.1, ACTION c requires the performance of surveillance testing every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in accordance with Technical Specification 4.6.4.1.b whenever the.

j position indicator of any drywell-suppression chamber vacuum breaker is inoperable.

2 Technical Specification 4.6.4.1.b requires that each drywell-suppression chamber vacuum j

breaker be demonstrated to be OPERABLE whenever the vacuum breaker is in the open I

i j

position by conducting a test that verifles that the differential pressure is mainteined greater than one-half (%) the initial differential pressure for one hour without makeup.

l The proposed enforcement discretion would doorease the frequency for performing the surveillance testing specified in Technical Specification 3.6.4.1. ACTION c from "at least i

once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />" to "at least once per 14 days." The improved Standard Technical l

Specifications for Type 4 Boiling Water Reactors (NUREG 1433 for BWR-4s) already include surveillance requirements specifying the verification of vacuum breaker position at least once per 14 days, if the position indication is inoperable, the Improved Standard l

Technical Specifications require that the vacuum breakers be verified to be closed through l

altamates means (i.e., a differential pressure test). Thus, the change to the testing 1

frequency specified in Technical Specification 3.6.4.1, ACTION c is consistent with the guidance of the BWR-4 Improved Standard Technical Specifications.

The revised word;ng for Technical Specification 3.8.4.1, ACTION o is as follows:

With the position indicator of any dry,well suppression chamber vacuum breaker Inoperable, the provisions of Specification 3.0.4 are not applicable, and operation l'

may continue provided the surveillance requirements of Speelfication 4.6.4.1.b are performed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and et least once per 14 days thereafter, until the inoperable position indtrator is rSturned to OPERABLE status; otherwise, be in at least HOT SHUTDOWF within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

DISCUSSION OF CIRCUMSTANCES LEADING TO THE REQUEST:

l On September 3,1994 at approximately 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the " closed" position indication for the 1-CAC X18C vacuum breaker was lost. Since that time, CP&L has been performing a differential pressure drop test in accordance with Technical Specification 4.6.4.1.b at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

E1-1

SEP 13 '94 02:25PM BrP RED MRfGGER P.6 i

l i

{

Based on the results of differential pressure tests, CP&L has demonstrated the i

1-CAC X18C vacuum breaker is closed and that the problem being experienced is the i

result of an inoperable position Indicator. The drywell-suppression chamber vacuum breakers are located inside of the primary containment suppression chamber (i.e., torus),

an area that is not normally accessible during unit operation due to the inerted (i.e.,

nitrogen) stmosphere that is maintained for poet accident combustible gas control 4

1

(

Reference:

Technical Specifiestion 3.6.6.31. Therefore, CP&L is unable to repair the

l Inoperable position indicator without an unscheduled unit shutdown.

I CP&L could not have reasonably foreseen that the 1-CAC X18C vacuum breaker position Indloator would fall. Since restart of Unit 1 and Unit 2, we have not experienced any additional vacuum breaker position Indicator problems. It should be noted that the drywell-suppression chamber vacuum breaker position Indicators have demonstrated a high degree of reliability.

SAFETY SIGNIFICANCE AND POTENTIAL CONSEQUENCES:

i l

The Brunswick Plant design has ten (101 vacuum relief breakers to equalize pressure between the drywell and the suppression chamber. This system is intended to me!ntain l

the structuralintegrity of the primary containment under conditions of large differential pressures by b!seding non-condensible gases from the suppression chamber into the j

drywell. The valves automatically open any time the vacuum setting is exceeded; no f ailure of the position switches will prevent the valves from operating.

i The vacuum breaker valves are furnished with pneumatic operators and limit switches to I

l j

allow remote cycling with positive indication of valve pallet displacement. Failure of the j

l vacuum breaker valves in a partially open position is unlikely since the valves are provided j

with magnetic latches to assure positive closing.

\\

There are an adequate number of vacuum breakers between the drywell and the suppression chamber to provide redundancy such that unit operation may continue with up 4

to two (2) inoperable vacuum breakers secured in the closed position. The drywell to-suppression chamber vacuum breakers must not be inoperable in the open position since l

this would allow bypassing and impact the pressure suppression capabilities of the l

suppresslon pool during a loss of-coolant accident.

j A sketch depleting the Internal configuration of the vacuum breaker is enclosed.

At present, CP&L is performing a differential pressure test at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to i

verify the affected vacuum breaker is closed. Based on the currently scheduled Unit 1 j

refueling outage start date of April 1,1995, continued performance of the differential pressure test for the remainder of the current operating cycle would subject the Unit 1 drywell suppression chamber vacuum breakers to at least 68 additional testa (based on the 1

i 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> test frequency), in contrast, the proposed 14 day testing frequency would result in the performance of only 15 additional tests. Therefore, performance of the additional I

j tests results in the usage of 265,000 to 424,000 standard cubic feet of nitrogen. As a i

i E1-2 3

i

~

1

. SEP 13 '94 02:26PM BNP NED MANAGER py

),

1 l

i 1

f result, the amount of primary containment purging operations must be similarly increased i

to maintain the containment pressure within Technical Speelfication limits.

The differential pressure test (PT-2.3.1 A) requires stigning the nitrogen inerting system and i

i adding approximately 5,000 to 5,000 standard cubic feet of nitrogen to the drywell at a j

nominal flow rate of 1,000 cfm with the torus vented. The drywel! Is pressurized to i

approximately 1.1 psig. Once the pressure le stabilized at approximately 1.0 psig, the j

pressure drop is monitored for one hour. This test verifles that the differential pressure is maintained greater than one-half the initial differential pressure for on~e hour without nitrogen makeup.

The high drywell pressure setpoint specified in Technical Specification Table 2.2.1-1, item 7 la 2.0 pois (the actual setpoint is 1.8 psig), if drywell pressure reaches or exceeds i

this setpoint, a reactor scram and Group i isolation will occur. Performing the differential pressure test described above involves a rapid pressurization of the drywell to opproximately one (1) poig, which significantly reduces the operational margin that is j

normally maintained to the high drywell pressure setpoint. Reducing the testing frequency l

from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once per 14 days will reduce the opportunity for incurring an l

unnecessary plant transient. CP&L believes that continued testing of the drywell-l suppression chamber vacuum breakers on the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency will not provide additional assurance that the vacuum breakers are capable of performing their design function. As j

such, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency of testing does not provide a health and safety benefit to the l

public commensurate with the increased potential for incurring a unnecessary plant i

transient as a result of the more frequent testing.

Two differential pressure tests have been performed to date. During the first differential i

l pressure test (performed on September 4,1994), t'.. pressure inside the drywell dropped I

from 1.1 to 0.88 psig. During the second differential pressure test (performed on I

September 7,1994), the pressure inside the drywell dropped from 1.05 to 0.93 psig.

These tests demonstrate that the vacuum breaker is closed and is capable of performing i

its design function.

i While performing the differential pressure tests, Maintenance and Engineering Support

]

j personnel observed that during the depressurization/ pressure equalization phase of the j

test, the " closed" position Indication for the effected vacuum breaker would initially J

i Indicate the valve being closed. As the differential pressure decreases, the " closed" position indication was lost. Based on the vacuum breaker configuration / design, the position Indication (i.e., the limit switch within the valve) is believed to initially be making contact, but this contact is being lost as the pressure decreases and the vacuum breaker disk thrust on the rubber seating surface and limit switch diminishes. This further supports the conclusion that the vacuum breaker is closed properly, and that the problem being i

experienced is Ilmited to the position Indicator.

l Relaxation of the frequency for verifying the position of the drywell suppression chamber vacuum breakers of the existing Technical Specification 3.6.4.1, ACTION c from at least once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days will not affect the ability of the J

drywell suppression chamber vacuum breakers to perform their intended safety function, i

The extended frequency provides adequate assurance that the vacuum breakers will i

l E13 i

l i

SEP 13 '94 02:27PM BNP FED MAtRGER P.8 perform their intended safety function. Each drywell suppression chamber vacuum breaker will continue to be demonstrated OPERABLE and closed at least once per 31 days and after any discharge of steam to the suppression chamber in accordance with Technical Specification 4.6.4.1.a.

The proposed enforcement discretion would decrease the frequency for performing the surveillance testing speelflod in Technical Specification 3.6.4.1, ACTION e from "at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />" to "at least once per 14 days." The Improved Standard Technical Specifications for Type 4 Boiling Water Reactors (NUREG 1433 for BWR-4s) already.

Include survelliance requirements specifylng the testing and verification, through an altemate means, at least once per 14 days that each vacuum breaker is closed if the position indicating instruments for the affected vacuum breaker are Inoperable. Thus, the change to the testing frequency specified in Technical Specification 3.6.4.1, ACTION c is concistent with the guidance of the BWR-4 Improved Standard Technical Specifications.

In a policy statement concerning enforcement actions that was published in the March 17, 1993 Federal Register (58 FR 14308), the NRC noted that "... circumstances may arise i

where a licensee's compilance with a Technical Specification (TS) Limiting Condition for Operation would involve an unnecamenev olant transient or nerformance of testina, inspection, or system realignment that is inappropriate with the plant specific conditions... without a corresponding health and safety benefit" (emphasis added).

CP&L believes that continued testing of the drywell suppreasjon chamber vacuum breakers on a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency will not provide additional assurance that the vacuum breakers are capable of performing their design function and, as such, that the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> frequency of testing does not provide a health and safety benefit to the public.

j i

DISCUSSION OF COMPENSATORY MEASURES:

No additional compensatory measures beyond those required by the Technical Specifications are necessary. CP&L will continue to test the drywell-suppression chamber vacuurr: breakers after any discharge of steam to the suppression chamber from any source.

Carolina Power & Light Company will repair the position Indicator for the 1 CAC-X18C vacuum breaker during the next forced outage of sufficient duration to permit repairs, or during the next scheduled Unit 1 outage. Currently, the next scheduled Unit 1 outage is the refueling outage that will begin on April 1,1995.

QjgGUSSION OF JUSTlFICATION FOR PROPOSED DURATION:

The proposed enforcement discretion is being requested to allow sufficient time for Carolina Power & Light Company to propere and submit and the NRC revlow and approve a expedited license amendment request. This amendment request will permanently revise the frequency for verifying the position of the drywell suppression chamber vacuum breakers from at least once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days.

E14

SEP 13 '94 02:28PM BNP tED MANAGER P.9 Relaxation of the frequency for verifying the position of the drywell suppression chamber vacuum breakers of the existing Technical Specification 3.6.4.1, ACTION e from at least once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days will not affect the ability of the drywell-suppression chamber vacuum breakers to perform their intended safety function.

The extended frequency provides adequate assurance that the vacuum breakers will perform their intended safety function. Each drywell-suppression chamber vacuum breaker will continue to be demonstrated OPERABLE and closed at least once per 31 days and after any discharge of steam to the suppression chamber in accordance with Technical Specification 4.6.4.1.a.

SIGNIFICANT HAZAMDS CONSIDERATION:

The Commission has provided standards in 10 CFR 50.g2(c) for determining whether a significant hazards consideration exista. Carolina Power & Light Company has reviewed this proposed enforcement discretion request and determined that its adoption would not involve a significant hazards consideration. The bases for this determination are as follows:

l 1.

The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed change revlees the surveillance requirements associated with inoperable position indication for drywell-suppression chamber vacuum breakers. No 4

safety related equipment, safety function or plant operations will be altered as a result of the proposed change. The change does not affect the design, materials, or I

I construction standards applicable to the vacuum breakers or their position indication instrumentation.

Relaxation of the frequency for verifying the position of the drywell suppression chamber vacuum breakers of the existing Technical Specification 3.6.4.1, ACTION c from at least once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days will not affect the ability of the drywell-suppression chamber vacuum breakers to perform their Intended safety function. The extended frequency provides adequate assurance that the vacuum breakers will perform their intended safety function. Each drywell-suppression chamber vacuum breaker will continue to be demonstrated OPERABLE and closed at least once per 31 days and after any discharge of steam to the suppression chamber in accordance with Technical Specification 4.6.4.1.a.

Based on the above, the proposed change does not create a significant increase in the probability or consequences of an accident previously evaluated.

2.

The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

As stated above, no safety-related equipment, safety function or plant operations will be altered as a result of the proposed change. The change does not affect the l

E1-5 I

j

, SEP 13 '94 02:29Pf1 BNP FED f1ArctGER P.10 l%

i 4

design, materials, or construction standards applicable to the vacuum breakers or

]

their position Indication instrumentation.

Relaxation of the frequency for verifying the position of the drywell-suppreselon l

chamber vacuum breakers of the existing Technical Specification 3.6.4.1, ACTION c i

from at lesat once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to at least once every 14 days will not affect the i

obliity of the drywell suppression chamber vacuum breakers to perform their intended safety function.

f As such, the proposed change cannot create the possibility of a new or different" kind of socident from any accident previously evolunted The proposed change does not involve a significant reduction in the margin of safety.

3.

l The proposed change does not involve any changes to the plant design or operation.

Therefore, no margins of safety, as defined by the plant's accident analyses, are l

i impacted. Relaxation of the frequency for verifying the position of the drywell-suppression chamber vacuum breakers of the existing Technical Specification l

3.6.4.1, ACTION c from et leset once every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to et least once every 14 days will not affect the ability of the drywell-suppression chamber vacuum breakers to i

perform their Intended safety function. The extended frequency provides adequate assurance that the vacuum breakers will perform their intended safety function.

j Each drywell-suppression chamber vacuum breaker will continue to be demonstrated l

OPERABLE and closed at least once per 31 days and after any discharge of steam to j

the suppression chamber in accordance with Technical Specification 4.6.4.1.a.

i in addition, performance of Technical Specification 4.6.4.1.b requires pressurization of the drywell to approximately 1.0 psig and then verifying that the differential drywell to suppression chamber pressure is maintained greater than one half the initial differential pressure for one hour without nitrogen makeup. During this evolution actual pressure willincrease as high as 1.1 psig before stabilizing. The i

l Drywell Pressure - High setpoint, which initiates a reactor scram and a Group 1 Isolation, is less than or equal to 2.0 psig (the actual setpoint is 1.8 psig). As such, performance of this evolution once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> unnecessarily risks a plant translent without providing a significant increase in the level of safety gelnad by performing the verification on a 14 day frequency.

Based on the above reasoning, the proposed change does not involve a significant reduction in the margin of safety.

i

)

ENVIRONMENTAL EVALUATION:

10 CFR 51.22(c)(g) provides criteria for and identification of licensing and regulatory actions eligible for categorleal exclusion from performing an environment assessment, i

Carolina Power & Light Company has reviewed this request and determined that it meets j

the eligibility criterla for categorical exclusion set forth in 10 CFR 51.g1(c)(9) and that this request does not involve Irreversible environmental cor. sequences. Pursuant to i

E16 i

i l

.~

, SEP 13 '94 02:30PM BrP tED t1ANAGEP P.11 10 CFR 51.22.(b), no environmental impact statement or environmental assessment needs to be prepared in connection with granting this enforcement discretion. The basis for this determination is as follows:

1.

As demonstrated in the above significant hazards analysis, the proposed enforcement discretion does not involve a significant hazards considoration.

2.

The proposed enforcement discretion does not result in a significant change in the types or a significant increase in the amounts of any effluent that may be releaspd j

offsite. The proposed enforcement discretion does not introduce any new equipment nor does it require any existing equipment or systems to perform a different type of function than they are presently designed to perform. The proposed enforcement discretion does not alter the function of the instrumentation and will ensure that the consequences of any previously evaluated accident do not increase. Therefore, CP&L has concluded that there will not be a significant increase in the types or amounts of any effluent that may be released offsite and, as such, does not involve irreversible environmental consequences beyond those already associated with normal operation.

3.

The proposed enforcement discretion does not result in a significant increase in Individual or cumulative occupational radiation exposure.

PNSC APPROVAL:

This request for enforcement discretion has been reviewed and approved by the Brunswick Plant Nuclear Safety Committee (PNSC) on September 8,1994, 1

E1-7 1

efP 13 '41 RP:31PM RIP WD MAtW#R P.17

~

Vacuum Breaker Cutaway Piston Rod Head Umit Switch

\\____

h f'J

$/

  • )

g uAp3 8

l 4]

./ (

~

b

\\ l Q.

l Umit Switch k

/

r-,X Magnet 0L e

03

)

A

/

\\

Magnet Position Magnet Adjustment Bolt i

4 1

t

_ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _. -.