NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE March 1983 The Station operated during the month of March 1983 with a monthly avail-ability factor of 0.0% and a net design electrical capacity factor of 0. 0 *.. The Station was shutdown March 19, 1982, for a scheduled maintenance outage. The Station remains shut down due to Reactor Recirculation system piping cracks found during Vessel Hydro on March 23, 1982.
CLASS I WORK - MAINTENANCE - MARCH 1983 WR #20124 - Repacked #11 Circulating Condensate Pump - 3/10/83
. WR #19394 - Rebuilt hanger 50-H-111 as per sketch #651-A - 3/11/83 WR #14327 - Replaced 3/4" Brass 90 on inst. air to PCV on RPS - 3/12/83 WR #19425 - Replaced seals on 102 Diesel Water Pumps - 3/14/83 WR #17213 - Checked and inspected check valves in Diesel Generator fuel lines - 3/14/83 WR #17861 - Replaced inflatable seal on inner Peele door - 3/13/83 WR #18607 - Completed assembly of #13 Rx. Recire Pump - 3/19/83 WR #18259 - Replaced check valve centerpiece on cleanup valve 33 3/21/83 WR #19602 - Fabricated and installed new restraint for inadequate core cooling system (MK-36W-2A).
WR #19603 - Fabricated and installed new restraint for. inadequate core cooling system (MK-36F-2A)
WR #20164 - Replaced teflon seat in #31-01 FW check valve.
WR #18621 - Ground out sand hole indication on FW Flange #31-01 WR #20162 - Repaired gasket surfaces on flanges for check valve #31-01 WR #20163 - Repaired gasket surfaces on flanges for check valve #31-02 WR #18686 - Replaced internals on Fuel Pool Flow Control Valve #54-14, 3/24/83 WR #19399 - Replaced mechanical seals and repaired inboard bearing housing for #11 FW pump, 3/24/83 WR #18622 - Repacked valve #38-01, 3/26/83 WP ?0168 - Opened, cleaned and inspected ESW Pump #12 disc check valve (72-11),,3/26/83 WR "20662 - Opened, cleaned and inspected ESW Pump #11 disc. check valve (72-12), 3/25/83 0306020094 830401 PDR ADOCK 05000220 p
e
~,
CLASS I WORK - ELECTRICAL MAINTENANCE - MARCH 1983 N1-MST-M1 125 VDC Batteries, cell specific gravities and battery voltage.
WR #20220 Diesel Gen. 102, Breaker R1022 - Replaced Power Switch on Control Mechanism WR #20214 Diesel Gen. 103, Breaker R1032 - Replaced Bolt on Square Crank WR #20650 Mod. 78.20 - Replaced Amp. Connections WR #20408 APRM #11 Flow Unit Aux. Replay - Replaced coil WR #20649 Mod. 78.14 - Replaced Jumpers WR #20201 Diesel Gen. 103, air comp. #1 - Disconnect motor for rewind (M0 #3396)
WR #20212 Shutdown Cooling IV 38 Replaced motor pinion key.
CLASS I WORK - INSTRUMENTATION 6 CONTROL - MARCH 1983 WR #15187 162 MG Set - Resistor IR in DC field excitation circuit porcelain cracked.
(Replaced resistor, Ohmite stock #1160) 9
t MODIFICATIONS COMPLETED DURING MARCil 1983 Mod. #N1-80-04 Major Order #3070
Title:
Diesel Generator 6 Supply Breaker Control Switch Annunciation This modification involves the addition of annunciation circuits to indicate to main Control Room Operators when the Diesel Generator isolation switch is put in the local start position and when normal supply breakers for Power Boards 102 and 103 are locked out.
This was done as a result of an NRC request of January 23, 1983.
Instr.ation of the modification involved the application of 10CFR50, Appenuis B.
The Safety Evaluation determined that this modification will not adver sely affect safe plant operation or shutdown as evaluated in the FSAR.
Mod. #N1-82-89 Major Order #2821
Title:
Installation of Debris Screens on Containment Vent and Purge Lines This modification involved the installation of debris screens on the Containment side of the Air and Nitrogen Vent and Purge Isolation Valves.
These screens will prevent the possibility of debris getting into these large lines and inhibit any valve from isolating. This modification was NRC required per letter dated 12/9/81. The installation meets requirements of Appendix B to 10 CFR 50.
The Safety Evaluation determined that this modification will not adversely affect safe plant operation or shutdown as evaluated in the FSAR.
Mod. #N1-32-73 bbjor Order #3027
Title:
Insta11atien of Bus Bracing to 4160V Power Distribution Boards This modification involves upgrading some-vertical lift metal-clad switch gear equipment to improve short circuit capability. This modification was recommended from requalification tests performed by the vendor. This installation meets the requirements of Appendix B to 10CFR50. The Safety Evaluation determined that affects important to safety previously evaluated in the Final Safety Analysis Report remains the same.
1 i
k
.~....... _,.
e
-- ~.. - - - -
_- "r Tq' " ' " -* -"* ]
1 2
OPERATING DATA REPORT t'
i DOCKET NO. _ 50-220 DATE 4/1/83 COSIPLETED BY W ROMA5, i TELEPilONE pic) tao 4 2 l
OPERATING ST/.TUS
- 1. Unit Name:
- 9. Mile Point #1 Notes
- 2. Reportm; Per. d:
03/01/S3 to 03/31/65 io
~
15du
- 3. Licensed Thenna! Power (5f Wr):
- 4. Nameplate Ratin;(Gross h!We):
640 620
- 5. Design Electrics! Racin;(Net A!We):
bau
- 6..Alaximum Dependable Capacity (Cross h!We):
- .7. Staximuld Dependable Cap 5 city (Ne't A!We)
- --
610
, - ~ ' ',
c E. If Chan;es Occur in Capacity Ratings (items Number 3 Throu;h 7)Since Last Report. Give Reasons:
- 9. Power Leve! To which Restricted. If Any (Net a!we):
- 10. Reasons For Restrictions.lf Ans:
This.\\!onth Yr..to Date Cumulatise
- 11. Hours In Reportm; Pen. d 744 2160 117,576 o
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 81,308.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,2M.2
- 14. Hourt Generatur On-Lm.
0.0 U.u Ib,bol.3 e
- 15. Unit Reserve Shutdown Hours U.U u.u 70.4
- 16. Cross Thermal Ener;y Generated (11WH; 0
0 129,374,390
- 17. Cross Electrical Ener;y Generated f.slWH; O.,
0 42,743,090 IS. Net Electricas ener;y Generated (.\\tn Hj 0
0 41,392,651
- 19. Umr Senice ractor 0.0 0.0.
bb.8
- 20. U.-"
v:!::' -
.r ::;:
0.0 0.0 c o.-8
- 21. Un : 0s;..... Tactor (Usis:: AIDC Nei, U.U y.y -
g,7 J
- 22. L. it Capacity Factor IUsin; DER Net) n u.v v.v sv.8
- 23. Unit Forced Outape Rate 100.0 100.0 10.8 2-1. Shutdow ns Scheduled Oser Nest 6 alunths Type. Daic,an.i Dur.: ian of Each::
- 25. If Shut 'Down At End Of Report Period. Estnnated !)aic uf Startup:
Ca,+amhar tort
- 26. Units in Test Status (Prior to Commercial Operatiunt-Fusceast Achies ed INITIA L CRITICA LITY INITI A L ELECTRICITY CO\\li!CRCI t t. Ol'ER s a SON 1
I
(*8/;; s
--v
.e
.,..v-,
,, + - _ -,,. -.. - -,. - -.
)
I 1
- j DOCNEFNO.
i S0-220 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAAIE 9 flile P2-1 fi DATE 4/1/83 m/
I' March 1983 d
COblPLETED DY Tif Rornan 6fM3 RENRT 610Nm
)r 1ELEP110NE (315) 349
/
~
,1 1
I f
3 3
r>
e ei 3 ea s e
ti 1
g 7yy Licenne 3,,,
g '1, Ji Caux & Currecilve 3.g 3
f 3 n:
Event gg g
.i Action su N,,'
Date E.
L;!
3 p
jdj Report se in v gO Prevent Recurrence I-OO M
U i
0
'f e
y
- 1 820323 F
744 A
4 82-009 Replacement of Redire Piping Continues i.'
}.
p
-. -H
- i l
f$
!}
d i i ii!!
9 a.
t l;
t 5.
-~ _
f-1 2
3 4
'I f i
F: Forced Reason:
hiethod:
Exhibit G Instrucitons S: Scheduled A Equiprnent Failure (Explain) l klanual for Pregiaration of Dass i
i D klaintenance of Test 2 htanual Serain.
I Entry Sheets for Licenice
- k C Refueling J Autoniatic Scrain.
[!
Everit Report (LER) File INUREG-
,D Regulatory Resitiction 4 Other (Explain)
.i 0161) ',
F.Adniinistrative g
- j E.Operatur Training & license Exaininatlun 5
G.Operattunal Einsi (E opirin)
Exhibit.1 Sanie Souree ik.'
19/17)
Il Oiher (Explain)
- 9. u' i'
~
l' t
2
<\\ l 1-
^^
. ~ ~ ~
n a
AVER tCC to AILY UNIT POhCic LEVEL 20 DOCRCT NO. -.
UNIT _ 9 Mfle Pt. #1 DATE 4/1/83 cot!PLCTED BY
'N Roman as s TELErifONE _(315). 349-2422 4
i htONTH March 1983 DAY j
AVERACE DAILY POWER LEVEt, DAY
(.\\!We.NetI AVER ACE DAILY POWER LEVEL.
(.\\1Wc.Neti I
O' I7 d
2 0
,g 0
3 0
,9 0
4 0
20 0
5 0
2I o
6 0
22 0
7 0
23 0'
s 0
l 24 0
9 0
1 25
.O 1
10 h
0 y3 0
27 12
'O 25 0
13 0
29 0'
l l
14 0
l 30 0
l5
- 0 3l 0
16 0
INSITt UCTIONS
[
"" E""" I#'"I '" \\I"'*W' 8 "' cA*h dn i n t he s e;..n ny n,....,3,, g.,,,p,,,,,,,,
th are :
-fi,1 3,.3 O
19177:
f 1
g--n r-.,
-. m e r,---a
- + -. - -....,
r,--
.n.---c--.,-.~n,-
. -. ~. -. - - -. - - - - - -..... - - - ~ - - - - - - - - -, -,.
E.
. ~3 l
NMP-o448 NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE BOULEVARD. WEST SYR ACUSE. N. Y.13 202
(
Apdi 8, 1983 j
I
& cciar l
Office of Inspection and Enforecment U.S. Nacicar Regulatory Corredssion Washington, DC 20555 Attention: Document and Controi Desk RE: Docket No. 50-220 DPR - 63 Dces M Submitted heretcith is the Report of Operating Statistics and Shutdown Experience for March 1933 for the Nine Mile Point Nucicar Station Unit M1.
Also included is a Narrative report of Operating Expcrience for Apdi 1983.
Sinccrciy j
1 2
ffu wows-Thomas E. Lespges Vice President Nacicar Generation TEL/jm Attaclunents cc: M ector, Office of 1&E (10 copies)
'/
....-.