Telecopy AO 74-25:on 741119,torus High Water Level Switch LS-3-23-91A Failed to Operate.Caused by Switch Assembly Flapper Arm Interfering Slightly W/Switch Case.Switch Readjusted
ML20086J218
Person / Time
Site: Peach Bottom 
Issue date: 11/20/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J217 List:
References
AO-74-25, NUDOCS 8401230325
Download: ML20086J218 (1)


Text

-L

/1 V

  • (And s b d f./P E h FMW.DEPHIA EECTRIC CONFANY P M b Bottom Atomic Power Station og /S*- 3 M * /S*

q, ggepf M WN8Ck Y1'****

y November 20, 1974 Mr. James P. O'Reilly, Director United States Atomic Energy Commaission Directorate of Reguistory Operations 631 Park Avenue King of Prussia, Pennsylvania 19406

~~ Mso M OccurrAEca 24-HAur Notiffia d a Subject A

~

Confirming R. 5. Fleisci-ann's conversation with Mr. Malt Baunack, A.E.C. Ragion 1 Segulatory Operations Office on November 20, 1974.

Raftrance License Number DPR-56 Technical Specification Reference Table 4.2.R Report No.:

50-278-74-25 Report Date November 20, 1974 Occurrence Deter November 19, 1974 Facility:

Peach Bottom Atomic Power Station R.D. 1, Delta Pennsylvania 17314 Identification of Occurrence:

Failure of a torus high water level switch LS-3-23-91A to operate.

This switch operates to sway the HPCI suction from the condensate storage tank to the suppression pool.

1 Conditions Prior to Occurrence Unit 3 at greater than 90% power.

Description of Occurrence:

During a routine instrument surveillance test, LS-3-23-91A failed to operate Designation of Apparent Cause of Occurrence:

The switch assembly flapper arm was found to interfere slightly with the switch cru Analysis of Occurrences L5-3-23-91A and LS-3-23-915 condensate storage tenk to tha suppression pool. operate independently to sway the HFC j

LS-3-23-918 had just been tested and found to. function properly.

Because the failure of LS-3-23-91A to operate would not have interfered with the proper operation of the system, the safety implications are minimal.

Corrective Action:

4 The switch was readjusted to allow proper operation of the switch.

v i

cynled a nsamber of timas using water to lif t the float to ensure reliable"4tch was The sw and them rechecked using the appropriate itstrument surveillance test. U Qoferation Failure Data No previous failures on this type of switch.

gd p

g r

Very truly yours,

/gwp p

6 W. T. Ullrich, Superintendent Q

??

l Peach Bottom Atomic Power Station l