Forwards Corrected Figure Re Annual Weekly Average Overtime Hours by Job Classification from Util Appealing Imposition of Compliance Exception Backfit
ML20086S036
Person / Time
Site: Farley  
Issue date: 12/20/1991
From: Woodard J
ALABAMA POWER CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9201030018
Download: ML20086S036 (3)


Text

_ _ _ _. _ _.

A atAma P6.ver Compny.

D '

- I"

  1. ~

40 invetness Center Pe4WDi Post Once nas 1295.

D rmingtyvit Alabarna 35:'01 -

Trephone 205 fut S060 g

m J. D. Wood ard Alabamalbwer v

e

-n aa' December 20, 1991 n, y,,,, r,,,, %.si, Docket Nos. 50-348 50-364 U.S._ Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555-Attention:

Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation Joseph M. Farley Nuclear Plant Operator Work Sphedule Backfit Anneal Board

Dear Dr. Murley:

By letter dated December 16,.1991, Alabama Power Company forwarded its basis for the appeal of-the imposition of the compliance exception backfit. Included as Exhibit 7 of the package was a table titled "Farley Nuclear. Plant Annual Weekly Average Overtime Hours by Job Classification." _ The figures provided in-the table-

~i included some operations personnel who were not_'on shift work, i.e., operations personnel assigned to training or other. duties.

As a result, the figures were slightly lower than those for shifti workers only. _ This discrepancy _was pointed out at the Backfit Review Panel meeting held on December-18, 1991. A corrected figure was provided to the-Panel members, 1

A corrected copy of the table is; attached.

If there are any questions, please advise.

Respectfully submitted,,

Yh.

L D. Woodard-4 JDW/ REM: map

-stachment 11 cc:

Mr. J. M. Taylor Mr. S. D. Ebneter=

Mr.,B.-A. Boger

-Mr. J. E Richardson

- 1

-Mr. F. J. Congel Mr. S. T. Hoffman 1

Mr. S. A. Varga

_\\

e m.yd L J -

Mr. G. F. Maxwell-

' 8L j

l 9201030019 911220 PDR ADOCK 05000349 P

PDR

+,.w=-

.+,.,-v.

e-m,,,-

,,,vr.

1 y, - m a

.,- w w n w.,

-, y r, w-

-n

r Attachment Farley Nuclear Plant Annual Weekly Average Overtime Hours By Job Classification

1 FARLEY NUCLEAR PLANT ANNUAL WEEKLY AVERAGE OVERTIME HOURS i

h BY JOB CLASSIFICATION i

t I

i YEAR SS SF P0 S0 1

1987 6

8-

.B 10 i

l 1988 5

5 7

8 i

l 1989 8

7 9.

10 L

1990 7

6 7

8 1991 7

8 6

8 i-AVERAGE 7

7 7

9 l

u

'I e