TXX-4183, Responds to Re Plug Welds in Spread Room.Visual Insp Will Be Performed Using Methods Similar to Those Described in Addendum to 840424 Testimony.Program Requiring Repair Instructions & QC Insp Followed

From kanterella
Revision as of 09:10, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Re Plug Welds in Spread Room.Visual Insp Will Be Performed Using Methods Similar to Those Described in Addendum to 840424 Testimony.Program Requiring Repair Instructions & QC Insp Followed
ML20094N404
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/29/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Bangart R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20094N403 List:
References
TXX-4183, NUDOCS 8408160204
Download: ML20094N404 (1)


Text

m D+

.",O

- O 6

F TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER

  • 400 NOHTH OLIVE MTHEET, L.B. MI * !)A LLAN, TEXAN 7320E m.ffi",SEL"!b.

1984

' gg

'i l

M - 8 l984 f

Richard L. Bangart 7

g Director, Region IV 4

Comanche Peak Task Force U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.

50-445 Arlington, TX 76012 50-446 Letter to Michael D. Spence (4/30/84)

Plug Welds in Unit 2 Spread Room File No. 903.9

Dear Mr. Bangart:

1.

Based on examination by David Holmgren, we agree that there are indications of welded repair on CTH-8057, CTH-8058, and CTH-8073.

These indications have been documented on Nonconformance Reports M-84-01230, M-84-01231, and M-84-01232 respectively.

2.

There is no documentation available to indicate that these repairs were approved or properly inspected in accordance with applicable procedures.

3.

To assess the extent of this type of unauthorized repair, TUGC0 will perform a visual inspection, using methods similar to those described by Mr. Gilbert in the Addendum to NRC Staff Testimony dated April 24, 1984, of a statistically representative sample of the cable tray hangers in the Unit 2 Cable Spread Room. Corrective action will be taken, as dppropriate, in aCCordance with estdbilshed procedures.

4.

A program was in place which required repair instructions and subsequent QC inspection. Our records indicate that this program was being followed in most instances. We do not know why this deticiency was not detected and dispositioned per established QC procedures.

Our QA program did not identify and correct this deficiency because the only way to have discovered its existence would have been to make the same extensive type of examination of these individual supports as made by Mr. Gilbert.

There was no apparent programmatic breakdown which would have led QA personnel to take these these extraordinary steps.

Very truly yours, Y,=

BRC:In 8408160204 840723-

,PDR ADOCK 05000445 t

PDR.

=

,