ML20106C629

From kanterella
Revision as of 03:06, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Rept, Diesel Engine 1B Component Revalidation Insp. Based on Results of Extended Operation Test of Diesel Engines 1A & 1B,TDI Diesel Generators Will Provide Reliable Source of Backup Power
ML20106C629
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/16/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20106C633 List:
References
NUDOCS 8410240248
Download: ML20106C629 (2)


Text

1 i-s DUKE POWER GOMPANY -

P.O. HOK 33180 3

- CHARLOTTE, N.O. 28242 MAL B. TUCKER reixpusoxe (704) 373-4533 vaar remainmur wartaan enanterion October 16, 1984

. Mr. Harold R. Denton, Director Office of Naclear Reactor Regulation U.S. Nuclear Regulatory oven 4ution Washington, D.C.

20555

. Attention: Ms. E. G. Adensam, Chief

~ Licensing Branch No. 4 Regarding:. Catawba Naclear Station Docket Nos. 50-413 and 50-414 l

f

Dear Mr. Denton:

l The_ purpose of this letter is to submit the enclosed report of the Catawba IB diesel engine extended operation test and inspections.

The test and i

inspections were performed in accordance with the test and inspection plans we

. submitted to you on April 5, 1984 and July 6, 1984, respectively, with several

" additions to_ incorporate conments received from the NRC and NRC concultants.

l As a result of the Extended Operation Test of the Catawba IB diesel. generator

[

and the extensive inspections conducted, and the similar tests and inspections

-of IA diesel which we previously reported to you, it is concluded that 1DI diesel generators' installed at Catawba will provide a reliable source of l

. backup power.

Very truly yours, WY

?

O* h8',uud

~

Hal B. Tucker rn. an.

L L

BBT:JGeshw g, g f,

fclS To~; 0!I-

'N'"[

['.kd'essain t.

fsl

(#4 i

sa t

{

MS MSI6 l

M' gr k( *,

$fqN50 8410240248 841016 J

l gDRADOCK 05000413 PDR-

')

e Mr. Harold R. Denton, Director October 16, 1984 Page 2 cc: Mr. James P. O'Reilly, Regional Administrator U. S. Itaclear Regulatory Ca=ninaion Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Catauba NLaclear Station Robert Guild, Esq.

Attorney-at-Law P.O. Box 12097 Charleston,' South Carolina 29412 Palmetto Alliance 2135 3/2 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Benley Place Charlotte, North Carolina 28207 k

i l