BECO-85-076, Application for Proposed Change 85-04 to License DPR-35, Decreasing Calibr Frequency for Certain Level & Pressure Transmitters Replaced During Recent Outage W/More Reliable Rosemount Transmitters
| ML20115G469 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/12/1985 |
| From: | Harrington W BOSTON EDISON CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20115G474 | List: |
| References | |
| BECO-85-076, BECO-85-76, NUDOCS 8504220210 | |
| Download: ML20115G469 (2) | |
Text
p BOSTON EOlsON COMPANY
=
800 BovLsTON STREET BDaTON, M AssACHusETTs 02199 WILLIAM D. HARRINGTO N c m.. m........
BECo 85-076 Proposed Change 85-04 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Ccmmission Washington, D. C.
-20555 License No. DPR-35 Docket No. 50-293 Proposed Technical Specification Change Calibration Frequency for Certain Rosemount Transmitters
Dear Sir:
Pursuant.to 10CFR50.90, Boston Edison Company hereby proposes the attached modification to Appendix A of Operating License No. DPR-35.
This modification will decrease the calibration frequency for certain level and pressure transmitters that have been replaced during the recent outage with more reliable Rosemount transmitters.
The application fee of $150.00 for this license amendment proposal was previously submitted to Ms. Reba M. Diggs of the License Fee Management Branch by our Check No. 866002, dated 7/20/84.
Please contact us if any further information is required.
s Very truly yours, GGW/kmc Attachment 3 signed originals and 37 copies cc:
See next page Commonwealth of Massachusetts)
County of Suffolk
)
Then personally appeared before me W. D. Harrington, who, being duly sworn, did state that he is Ser.ior Vice President - Nuclear of the Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of the Boston l
Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.
f j
My Commission expires:
LEA 0 Notary Public g9 eon S. CCfMS N 21,1933 gj a.rangen Dem to.
g 8504220210 850412 Ag i
g DR ADOCK 050 3
Mr. Domenic B. Vassallo, Chief April 12,1985 Page 2 cc:
Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Dept. of Public Health 150 Tremont Street F-7 Boston, MA 02111 1
l l
~
i