ENS 42074
From kanterella
Revision as of 21:20, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
03:00 Oct 25, 2005 | |
Title | |
Event Description | At 2300 on October 24, 2005, both unit 3 and unit 4 start up transformers were declared inoperable and Tech Spec 3.8.1.1.e action statements were entered. With both units being energized from their respective start-up transformers, the high voltage limit is 241.5kV in accordance with 0-ONOP-004.6, Degraded Switchyard Voltage. System Operations reported switchyard voltage at 243.5 kV and 242.5 kV for unit 3 and unit 4 respectfully. System Operations was requested to lower switchyard voltage to within limits. At 0015 on October 25, 2005, switchyard voltage being lowered to within the switchyard limits and both start-up transformers were declared operable. The high switchyard voltage is due to hurricane Wilma's impact on the Florida service area that has [led] to low system load with cooler weather conditions.
The NRC Resident Inspector has been notified. |
Where | |
---|---|
Turkey Point Florida (NRC Region 2) | |
Reporting | |
Other Unspec Reqmnt | |
Time - Person (Reporting Time:+-0.73 h-0.0304 days <br />-0.00435 weeks <br />-9.99954e-4 months <br />) | |
Opened: | Michael Murphy 02:16 Oct 25, 2005 |
NRC Officer: | Joe O'Hara |
Last Updated: | Oct 25, 2005 |
42074 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42074\u003C/a\u003E - \u003Ca href=\"/Turkey_Point\" title=\"Turkey Point\"\u003ETurkey Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInoperable Start-Up Transformers,High Switchyard Voltage Due to Hurricane Wilma\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42074 - Turkey Point\n","link":"","lat":25.435330555555556,"lon":-80.33125833333334,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Standby (0 %) |
After | Hot Standby (0 %) |
Unit 4 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Standby (0 %) |
After | Hot Standby (0 %) |
WEEKMONTHYEARENS 527912017-06-06T21:51:0006 June 2017 21:51:00
[Table view]Other Unspec Reqmnt Both Standby Steam Generator Feed Pumps Out of Service for Pre-Planned Maintenance ENS 515512015-11-19T04:33:00019 November 2015 04:33:00 Other Unspec Reqmnt After-The-Fact Notification of Unusual Event ENS 424002006-03-09T10:55:0009 March 2006 10:55:00 Other Unspec Reqmnt Technical Specification 3.8.1.1 Entry Due to Loss of Unit 3 Startup Transformer ENS 420742005-10-25T03:00:00025 October 2005 03:00:00 Other Unspec Reqmnt Inoperable Start-Up Transformers; High Switchyard Voltage Due to Hurricane Wilma 2017-06-06T21:51:00 | |