ML20128P024

From kanterella
Revision as of 12:57, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Shipment Did Not Depart from Facility as Scheduled Due to Packaging Difficulties.Shipment Will Be Delayed Until July 1996
ML20128P024
Person / Time
Site: 07001252
Issue date: 06/20/1996
From: Oshinowo F
EDLOW INTERNATIONAL CO.
To: Bennington G
NRC
References
WHC-26, NUDOCS 9610170112
Download: ML20128P024 (1)


Text

jut +-20-1995 09:05 EDLOW INTERtATIOfAL 2024834840 P.01 01 o

3 9 6 ;t Edlow Intemational Company 1666 Connecticut Ave., N.W. Suite 201 M BA

[/ cad [d'_L Wuhingtort. D C. 20009 U.S.A.

Tel(202) 483-4959 C-O / a 5' a re co2) 4samo FACSIMILE TRANSMITTAL c-mail: edlowco@aol.com Date: June 20,.1996 Total Pages:

/

(including Cover Page)

TO:

Gloria Benninaton Nuclear Regulatory Commission FAX:

301 415-8555 FROM:

Franchone Oshiaowo IF THERE IS A PROBLEM WITH THIS TRANSMISSION, PLEASE CALL 202-483-4959.

('REF WHC-26 Please be advised that the referenced shipment did not depart the originating facility as scheduled due to packaging difficulties. The shipment has been delayed until July, 1996. We will provide a shipping schedule when known.

Best rega ds, Fra chone Oshinowo EIC 1

9610170112 960620

)$0 PDR ADOCK 07001252 C

PDR TnTal D A1