ML20128P024

From kanterella
Jump to navigation Jump to search
Informs That Shipment Did Not Depart from Facility as Scheduled Due to Packaging Difficulties.Shipment Will Be Delayed Until July 1996
ML20128P024
Person / Time
Site: 07001252
Issue date: 06/20/1996
From: Oshinowo F
EDLOW INTERNATIONAL CO.
To: Bennington G
NRC
References
WHC-26, NUDOCS 9610170112
Download: ML20128P024 (1)


Text

jut +-20-1995 09:05 EDLOW INTERtATIOfAL 2024834840 P.01 01 o

3 9 6 ;t Edlow Intemational Company 1666 Connecticut Ave., N.W. Suite 201 M BA

[/ cad [d'_L Wuhingtort. D C. 20009 U.S.A.

Tel(202) 483-4959 C-O / a 5' a re co2) 4samo FACSIMILE TRANSMITTAL c-mail: edlowco@aol.com Date: June 20,.1996 Total Pages:

/

(including Cover Page)

TO:

Gloria Benninaton Nuclear Regulatory Commission FAX:

301 415-8555 FROM:

Franchone Oshiaowo IF THERE IS A PROBLEM WITH THIS TRANSMISSION, PLEASE CALL 202-483-4959.

('REF WHC-26 Please be advised that the referenced shipment did not depart the originating facility as scheduled due to packaging difficulties. The shipment has been delayed until July, 1996. We will provide a shipping schedule when known.

Best rega ds, Fra chone Oshinowo EIC 1

9610170112 960620

)$0 PDR ADOCK 07001252 C

PDR TnTal D A1