ML20133F950

From kanterella
Revision as of 08:21, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License NPF-12,revising Tech Spec 6.5.3.1(e) to Include All Individuals Designated by Operations Director as Qualified Procedure Reviewers.No Significant Hazards Determination Encl.Fee Paid
ML20133F950
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/02/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20133F953 List:
References
NUDOCS 8508080499
Download: ML20133F950 (2)


Text

r 1

0 4[

SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 764 COLUMarA. SourH CAnoWNA 29218 Au gus t 2, 1985 o w.omON.a.

VeCE PmescotNT Nuctran oraNAFiONS Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Plant Technical Reviewer Qualifications

Dear Mr. Denton:

South Carolina Electric and Gas Company (SCE&G) hereby requests a change to the Virgil C. Summer Nuclear Station Technical Specifications, Section 6.5.3,

" Technical Review and Control." This proposed change is being requested to correct inadequacies in the current Technical Specification wording which were identified by the NRC during an inspection at the plant. The change is necessary to close Inspector Follow up Item Number 83-15-07, which stated that the current Technical Specification requirement was "too narrow in scope."

Currently, Specification 6.5.3.l(e) requires individuals responsible for reviews performed in accordance with Sections 6.5.3.l(a) thru (d) of the Technical Specifications to meet the qualification requirements of Section 4.4 of ANSI 18.1, 1971.

As noted in the above referenced Inspector Follow-up Item, this section of the ANSI Standard does not address all of the individuals at the facility designated by the Director, Nuclear Plant Operations to be qualified procedure reviewers. SCE&G therefore proposes the Technical Specification be revised as indicated in Attachment 1.

This change would establish consistent qualification requirements for personnel at the plant designated as qualified reviewers.

SCE&G proposes the change involves a no significant hazards determination, and includes a discussion of this finding.

This amendment has been reviewed and approved by both the Plant Safety Review Committee and the Nuclear Safety Review Committee.

In accordance with the requirements of 10 CFR 170, a check in the amount of one hundred fif ty dollars ($150.00) is enclosed to initiate processing of this request.

Should there be any questions, please advise.

Very t ruly yours, Og[g h

[

P g

J P

0. W. DixonpJr.

C

/

f N[A M

cc:

(see page 2)

r

'o A

'o Mr. Harold R. Denton August 2, 1985 Page 2 AMM/csw At t ac hment s cc:

V. C. Summer C. A. Price T. C. Nichols, Jr./0. W. Dixon, Jr.

C. L. Ligon (NSRC)

E. H. Crews, Jr.

K. E. Nodland E. C. Roberts R. A. St ough W. A. Williaum, Jr.

G. O. Percival D. A. Nauman C. W. Hehl J. Nelson Grace J. B. Knotts, Jr.

Group Managers H. G. Shealy O. S. Bradham NPCF File

.