05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl

From kanterella
Revision as of 02:07, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
ML20135E840
Person / Time
Site: Millstone 
Issue date: 12/06/1996
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135E843 List:
References
RTR-REGGD-01.075, RTR-REGGD-1.075 B16026, NUDOCS 9612120105
Download: ML20135E840 (4)


LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)
4231996045R00 - NRC Website

text

.~

o-

")\\

Northeast i 7 8*'d*" 8'"", sup 06037 Utilities System

%rtheast Utilities service company P.O. Box 270 Ilartford, CT 06141-0270 (860) 665-5000 t

s i

December 6,1996 Docket No. 50-423 B16026

}

Re:10CFR 50.73(a)(2)(ii) i U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

Millstone Nuclear Power Station Unit 3 -

Licensee Event Report 96-045-00 j

Submitted Pursuant to 10CFR 50.73(a)(2)(ii) l This letter forwards Licensee Event Report 96-045-00, documenting a condition that was determined at Millstone Unit No. 3 on November 7,1996. This LER is submitted pursuant to 10CFR 50.73(a)(2)(ii).

NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

i Very truly yours, j

1 NORTHEAST NUCLEAR ENERGY COMPANY NJ/H. Broprs

}

Unit Director, Mil tone U t No. 3 i

l 100004 4

i 9612120105 961206

^

PDR ADOCK 05000423 S

PDR g}

y m, 1

U.S. Nucl:ar R gulatory Commission B16026\\Page 2 Attachment: 1)

NNECO's commitments in response to LEE 36-045-00 2)

LER 96-045-00 cc:-

H. J.

Miller, Region i Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 V. L.

Rooney, NRC Project Manager, Millstone Unit No. 3 i

1 W. D. Travors, Dr., Director, Special Projects I

1 i

i t

6 I

i 1

I i

1

i Docket No. 50-423 B16026 4

1 i

i

}

i i

i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 96-045-001 l

i 1

i 1

4 d

i i

4 December 6,1996 c

I i

.U.S. Nucl:ar Regulttory Commission 4

B13026%ttachment 1\\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this j

document.

Any other actions discussed in the submittal represent intended or planned actions by NNECO.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Manager Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number

Commitment

Due B16026-01 The plant will be revised to conform to the Prior to restart existing design basis, or the design basis will be revised to identify deviations from Regulatory Guide 1.75, Position C.6.