NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE September 1985 i
September 1 The Unit entered the mcnth in Mode 5 as a result of a reactor trip / safety injection due to a
loss of instrument air which occurred on August 29, 1985. Plant heat up began on the 1st with the Unit entering Mode 4 at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />.
September 2 Plant heat-up continued with the Unit entering Mode 3 at 0108 hours0.00125 days <br />0.03 hours <br />1.785714e-4 weeks <br />4.1094e-5 months <br />.
September 3 Plant heat-up continued wi th reactor criticali ty achieved at 1247 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.744835e-4 months <br /> and the Unit being synched to the grid at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br />.
September 4 The Station operated at a reduced power level of approximately 57 percent as a result of maintenance being performed on feedwater pump [ FW-P-1A).
September 5 Repai rs to feedwater pump [ FW-P-1A] were completed at 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br /> and power level was subsequently increased to a nominal 100 percent.
September 6 The Station was in Operational Mode 1 with reactor power through at a nominal 100 percent.
Reactor Coolant System was September 15 at a normal operating pressure and temperature.
September 16 Inadve rtant grounding of Vital Bus #2 caused the Loop B OTAT and OPAT bistables to trip producing a reactor trip at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.
The reactor achieved criticality at 2203 hours0.0255 days <br />0.612 hours <br />0.00364 weeks <br />8.382415e-4 months <br /> and the Unit was synched to the grid at 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br />.
September 17 The Station was in Operational Mode 1 with reactor through power at a nominal 100 percent.
Reactor Coolant September 25 4 System was at normal operating pressure and temperature.
8512120118 851003 DR ADOCK 05000334 PDR 1
September 1985 Summary of Monthly Operating Experience September 26 At 1023 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.892515e-4 months <br /> the plant P250 computer began reading N42 and N43 approximately 20 percent low.
This resulted in two channels calculating an erroneous targeta 0.
At 1120 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.2616e-4 months <br /> operators noticed the rod position indicators (RPI's) for control banks C and D reading 200 steps with the rods actually at 228 and 225 steps. At 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />, the interaction between the plant variable computer and the plant P250 com t deenergized and both the operations were no$pu er was RPIs and the a monitor returned to normal.
Plant t affected by this event.
September 27 The Station was in Operational Mode I with reactor through power at a nominal 100 percent.
Reactor Coolant System September 30 was at normal operating pressure and temperature.
^
1 2
OPERATI G DATA REPORT DOCKET NO. 50-334 DATE 10/3/63 COMPLETED BY P. A.
Smith TELEPHONE. 417-641-1825 OPERATING STATUS l
I. Unit Name: Beaver Valley Power Station, Unit il Notes September 1985
- 2. Reporting Period:
- 3. t l===d Thermal Power (MWt):
2W
- 4. Nameplate Rating (Gross MWe):
923 835
- 5. Design Electrial Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Cheness Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
e
- 9. Power Level To Which Restricted.If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
N/A This MontJi Yr. tete
' Cumulative
- 11. Hours In Reporting Period 720.0 6',551.0 82,559.0
- 12. Number Of Hours Reactor Was Caitical 647.6 6,062.2 43,417.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4.482.8
- 14. Hours Generator On-Line 644.8 5.915.0 41.997.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.627.823.0 14,513,009.9 97,911,523.9
- 17. Gross Electrical Energy Generated (MWH) 517,000.0 4,657,000.0 31,151,400.0
~
- 18. Net Electrical Energy Generated (MWH) 485.300.0 4.366.550.0 28,991,393.0
- 19. Unit Service Factor 89.6 90.3 53.3
- 20. Unit Availability Factor 89.6 90.3 53.3
- 21. Unit Capacity Factor (Using MDC Neti 83.2 82.3 46.9
- 22. Unit Capacity Factor iUsing DER Net) 80.7 79,8 45.5
- 23. Unit Forced Outage Rate 10.4 g,5 24.8
- 24. Shutdowns Scheduled Over Next 6 Months ! Type.Dete.snd Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Priur to Commercial Operationi:
Forecast Achieved INITIA L CRITICALITY N/A N/A INITIA L ELECTRICITY N/A_
N/A COMMERCIAL OPERATION N/A N/A 4
<,,77)
\\\\
1
t MAJOR MAINTENANCE 1.
Maintenance of Feedwater Pump [FW-P-1 A].
2.
Repaired Main Steam Trip Valves [TV-MS-101B] and [TV-MS-101C].
3.
Maintenance of Station Air Compressor [SA-C-1A] and [S A-C-1B].
4.
Inspected and repaired Steam Driven Auxiliary Feedwater Pump [FW-P-2].
4 a
t i
I r
I e
+ -
..m,,
-+y-v-w:.1 v-
=,
---w--
---er--
+
-v-
AVERAGE DAll UNIT POWER LEVEL.
t DOCKET NO.
50~334 UNIT 3V?S U::1: 41 10/3/85 DATE P.A. Smith COMPLETED BY TELEPHONE (412) 643-1825 SEPTEMBER Mom DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 g
37 667 0
788 2
18 l
3 135 827 39 784 20 582 784 23 783 6
785 7
22 7
785 784 73 4
783 g
24 786 785 25 789 9
742 10 26 788 II 827 829 27 747 j
12 28 789 13 788 39 1
i-14 790 787 30 15 789 31 i
.339 t
16 INSTRUCTIONS On this format. fist the average d:ily unit power le.c!!n MWe. Net Or esch day in the reputtine month. Compute to t
the ne: rest whole mepwatt.
I 19/77 )
. _ _., _ - ~..
UNITSHUTDOWNS ANDPOWER REDUCTIONS DOCKET NO.
50-334 UNIT NAME BVPS Unit #1 DATE 10/3/85 REPORT MONIH SEPTEMBER COMPLETED BY P. A.
Smith TELEPilONE (412) 643-1825 "u
en
- o 0
- N C.0 t Licensee Cause, & Corrective g
,a e
No.
Date
%5 3UE Event
!e Action to
- e R
"5 l
5,E "
Report #
$3 eo Prevent Recurrence H
E M
y*y NU O
8 30 850901 F
62.2 A
4 85-015 PA AIRDRY The Station remained off line follow-ing a reactor trip / safety injection due to a loss of instrument air caused by a broken line on the instrument air dryer.
Repairs were made and the Station returned to service at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br /> on the 3rd.
31 850903 F
0 B
5 N/A CH PUMPXX The Station was operating at s' reduced power level as a result of maintenance being performed on feedwater pump [FW-P-1A].
(CONTINUED) 1 2
3 4
F: F used Reasam:
Hethod:
1.mlubit G. Insisus siims S Schedueil A-Eiguipment Failure (Emplain) 1-Manual fin Psepasasi.m os Dana 8
B. Maintenance of Test 2-Manual scree I nis) Sheels l'w I kernce C Refuelint 3-Automatic Scram F$cn' Relant 81 l'RII de INllRI G D-Regulatoey Restricii.*
4-Continued From Frevious Month Ultill I Openalais Tsaining A license Examinati"
5-Ite<'uc tion I: Adnunistrative 9-Other 5
G Operatiimal I s eios 11 aplaml I sinhis I Same S. misc 08/77)
II OtherflN plaiul
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-334 UNIT NAME BVPS Unit il DATE - 10/3/85 REPORT MONIH SEPTEMBER COMPLETED BY P.
A.
Smith TELErtlONE (412) 643-1825 S
cn
% MO oa 0." t Licensee
$#5 Cause, & Corrective a
No.
Date 0
'E t', E Event f4 Action to R
"5 5
5.E "
Report #
e o ao Prevent Recurrence H
S M
y*g NU O
e 31 (CONTINUED)
Repairs to feedwater pump [FW-P-1A]
completed at 1153 hours0.0133 days <br />0.32 hours <br />0.00191 weeks <br />4.387165e-4 months <br /> on the 5th and power level was subsequently increased.
32 850916 F
13.0 A
3 85-016 EG ZZZZZZ Inadvertant ground ing of Vital Bus 2
(
i caused a reactor trip at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.
The Station returned to service at 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br /> on the 16th.
4 1
1 1
2 3
4 F F.uted Reas m:
Method:
Exhibil G - Insinut siims S-Schedu8cd A Equipment Failure (Explain) t-Manual fin Pseparais.m of Data B-Maintenance e*i Test 2-Manual seraan l~rier) Shetislo'I*en5cc C RefuelinE 3-Automatic Scram Fseni Rep.wo Il l'RII de q NtIRI G l,
D Regidanoi> Restslctiim 4-Continued From Previous Month (llfil l l' Openalis Tsaining A liciise l'xaniinati"
5-Reduction I Adminisssative 9-Other 5
G Operatiusial I isne il aplain t I sluhis 1 - Sanw,Sunse l'8/77) ll Oshes flitplaini i
e