NARRATIVE
SUMMARY
OF j-6 110NTHLY OPERATING EXPERIENCE
- ~
UNIT I FEBRUARY, 1988 February 1
~ The Unit remained -shutdown for refueling.
through February 4 February 5 At 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />, the Unit entered Mode 5.
February 6 The Unit remained in Mode 5.
through February 22 February 23 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, the Unit entered Mode 4.
February 24 At 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br />, the Unit entered Mode 3.
February 25 The Unit remained in Mode 3.
through February 27 february 28 At 1332 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.06826e-4 months <br />, the Unit entered Mode 2.
February 29 The Unit remained in ibde 2.
I'
(
I n
~~
p ry j
68033OO32ces3fo34
{DR ADOCK 050 s
DCD f
AVERAGE DAILi UNIT POWER LEVEL f
DOCKET NO.
30-33'~
UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net)
(MWe-Net:
I O
0 g7 2
0 0
- g 3
0 39 0
4 0
- 0 0
I O
21 0
6 n
n 0
0 1
0 y
8 0
o 24 9
0 o
10 0
0 26 lI O
y 0
12 0
o 13 0
39 0
14 0
30 N/A 13 0
3{
N/A 16 0
j l
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day.n the reentrine month. C.onnuie na the nearest unule mepwait.
14I77) i
_m...
UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T.'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 "s.
c^
s'
".O oa ci 0St 1.icensee c
No.
Date "a
%o 3U2 Event 0e Cause & Corrective o
S
$5 I
sS*
Action to j"$
=g 0
Report #
H Q
Prevent Recurrence m
o o
ca 2
880201 S
696 C
4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling Outage.
eu i
1 2
I I a.ed Reas*"'
3 4
5 Si hcJu c l Hethod:
8 A F.guipmens f~ailuse (I spliint 1.shebes G - Insisu si.=is s
1-Manual B Maintenante e.e Test l'" PacI'38 J8k"' "8 DJ8J 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram I sen Rq we e! I H s I sic t NtINI G
- 1) Regulataeg Hesiskti."'
4-Continued Fros Previous Month (1891)
I th.ceae u Tealning A lesense I sananatioet i AJuunasse.nesvc 5-metuction 9-Other 5
- t. Ogicsate.nul I es.u ll mgilanel l'8/ U )
II(hiecsiI spla.I Isinhos1 Sann-N.ne.c a
=___.
y.-
OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE:
(412) 643 1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Grose MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860.
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
696.0 1440.0 103728'.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 0.0 59184.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 0.0 57654.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 0.0 136917319.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 0.0 43865720.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-7720.0
-10920.0 40914773.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
MAR 2.1988
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A i
COMMERCIAL OPERATION N/A N/A 1
F=-
1 NARRATIVE
SUMMARY
OF b
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1
'The Unit remained shutdown for maintenance.
through February 9 February 10 The reactor was taken critical at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br />.. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).
February 11 The Unit remained shutdown.
February 12 The reactor was taken critical at 1903 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.240915e-4 months <br />.
February 13 The Unit was synchronized at 0614 hours0.00711 days <br />0.171 hours <br />0.00102 weeks <br />2.33627e-4 months <br /> and power was escala ted to a nominal value of 45% to. permit s team gene ra tor level trip setpoint adjustments. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, a power escalation toward 95% was initiated.
February 14 The Unit operated at a nominal value of 100% output.
through February 16 February 17 At 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
February 18 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />, the Uni t's output was increased-to approximately 87%.
February 19 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted.
At 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br />, the Unit's output was reduced to 85% to pe rmi t leak testing of the
'O' waterbox of the Uni t's main condenser.
At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.
February 20 The Unit operated at a naninal value of 60%' output.
through February 21 February 22 At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br />, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%.
At 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br />, the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.
Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29 -
Ri -
AVERAGE DAILY UNIT POWER LEVE1.
DOCKET NO.
50-412 (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1
0 17 802 2
0 13 668 3
0 19 623 4
0 447 30 5
0 453 6
0 655 i
7
_0 823
- 3 3
0
- 4 818 9
0 is 818 10 0
26 814 ll 0
27 814 12 0
818 13 290 814 39 14 802 ja N/A is 818 3
N/A 16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute e u
the nearest whvie mepwatt.
(4177) ____
g"-~
q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i
REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m
be
- n
% ee o oa 0$%
Licensee c
a Cause & Corrective No.
Date 2
3UE Event 8
kS E
Action to R
$3 I
sS*
Report #
a H
A j"S Prevent Recurrence m
o o
ca i
3 880201 S
229 B
4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway.
la 4
880210 F
65.2 A
1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve
[RCS-MOV537).
5 880217 F
0 B
5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the
'D' waterbox of the Unit's main condenser.
6 880219 F
0 B
5 N/A IIC ZZZZZZ Reduced output to 85% to permit leak 4
testing of the
'D' waterbox of the Unit's main condenser.
7 880219 F
0 B
5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the
'B' main feed pump's removal from service for maintenance.
I I
2 3
4 I I n.cd Reasnes n,ehad:
1.sluks G Insiiniti.=es 5 Ss heJu't.I A Fquipmens failure (i = plaint
- a. Menu 11 R Maint anse e r Test f.n Pserd8d'8 a' "8 lla'a 2-Manua1 Scree I ness Shcess 8.n I hcasce C Refiseling 3_a,eo., tic Ser==
IscueR.p. ealiMiIsictNIINIG D NcFl8') Rc5 k'i.*
4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"*
5-lietuc t t on i Adeissnesse.neeve 9-Other 5
- t. Ogweais. nut I is..a il aplane t I shibst I 5enw %ense l'8/77) 11 Oslice i1.pl. san t e
i m
f-4 o.
\\
OPERATING DATA REPORT DOCKET NO.:
50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERICD:
696.0 1440.0 2511.0
- 12. NO. OF RRS. REACTOR WAS CRITICAL:
414.6 1040.5 2006.0 i
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. hdURS GENERATOR WAS ON LINE:
401.8 1027.7 1977.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
948305.0 2595823.0 4981460.4
- 17. GROSS ELECT. ENERGY GEN. (MWH):
307600.0 843400.0 1625600.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
285646.0 792196.0 1530300.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8
- 22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I
)
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A..... _
j