Forwards NRC Bulletin 87-002,Suppl 1 Issued on 880422 to All Holders of OL & Cp,Requiring Holders to Provide NRC W/Addl Info Re Identity of Vendors Suppling Fasteners in Past 10 Yrs.Nrc Should Check That Licensees Respond Appropriately
ML20154J212
Person / Time
Issue date: 05/06/1988
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
IEB-87-002, IEB-87-2, NUDOCS 8805260220
Download: ML20154J212 (2)


Text

.*

May 6,1988 MEMORANDUM FOR: All Project Managers FROM:

Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, Y and Special Projects

SUBJECT:

NRC BULLETIN N0. 87-02, SUPPLEMENT 1:

FASTENER TESTING TO DETERMINE CONFORMANCE WITH APPLICABLE MATERIAL SPECIFICATIONS (MPANo.B.102)

The NRC issued Bulletin 87 02, Supplement 1 on April 22, 1988 to all holders of operating licenses or construction permits. This supplemental bulletin requires holders to provide the NRC with additional information regarding the identity of all vendors from which safety-related and non-safety.related fasteners have been procured in the post 10 years. The NRC should receive this information within 90 days.

Analyzing the informaticn received from this supplemental bulletin will be coordinated with other inilitary and government agencies via the Office of Investigation (01). One goal of these efforts is to generate a cross-reference list of end-users with suspected suppliers of non-conforming fasteners.

William Hutchinson (x20371) is the principal 01 contact.

A copy of Bulletin 87 02, Supplement 1 is attached. The lead project manager is Thierry Ross (x23016). Technical review contacts are Jim Conway (x20978) and Ed Baker (x23221).

Plant specific TAC numbers were not taken out for this supplemental bulletin.

Project Manager (PM) involvement will be minimal; primarily limited to checking that their licensee responds appropriately. O! and applicable NRR staff should be on automatic distribution for all licensee responses.

Imposition completion dates for SIMS reports will be provided to all PMs at some later date by the lead PM.

Originsi signed by Dennis M. crutchf5PM Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, Y and Special Projects g

Enclosure:

As stated 4, '

DISTRIBUTION:

-Docket File >

Lluther f(,

NRC/ Local PDRs TRoss

/

PDIII.2 Rdg.

PDIII-2 Plant File 0Crutchfield GHolahan, o g M d

N U j

s,r w PDIII-2 FD I2 N

P :

DR5P TRoss/wM.:.... J......:...RRgtm OFC

' : LNo m : RDudley

GHolah
DC tchfield:

NAME :

5/[,/88 5/[/88 DATE : 5/ 3 /88

5/ / /88
5/G/88 a

0FFICIAL RECORD COPY 8805260220 080506 PDR ORG NRRD I

>/

i i

pm Atoq

[,

o,,

UNITED STATES y

3#<

g NUCLEAR REGULATORY COMMISSION aj W ASHING TON, D. C. 20555

\\*****/

May 6.1988 MEMORMDUM FOR: All Project Managers FROM:

Dennis M. Crutchfield, Director Division of Reactor Projects - !!!,

!Y, Y and Special Projects

SUBJECT:

NRC BULLETIN NO. 87-02, SUPPLEMENT 1:

FASTENER TESTING TO DETERMINE CONFORMANCE WITH APPLICABLE MATERIAL SPECIFICATIONS (MPANo.B-102)

The NRC issued Bulletin 87-02, Supplement 1 (-

April 22, 1988 to all holders of operating licenses or construction permit.

This supplemental bulletin requires holders to provide the NRC with additional information regarding the identity of all vendors from which safety-related and non-safety-related fasteners have been procured in the past 10 years.

The NRC should receive this information within 90 days.

Analyzing the information received from this supplemental bulletin will be coordinated with other military and government agencies via the Office of Investigation (01). One goa; Of these efforts is to generate a cross-reference l

list of end-users with suspected suppliers of non-conforming fasteners.

William Hutchinson (x20371) is the principal 01 contact.

A copy of Bulletin 87-02, Supplement 1 is attached.

The lead project manager is Thierry Ross (x23016). Technical review contacts are Jim Conway (x20978) andEdBaker(x23221).

Plant specific TAC nur.bers were not taken out for this supplemental bulletin.

Project Manager (PM) involvement will be minimal; primarily limited to checking that their licensee responds appropriately.

OI and applicable NRR staff should be on automatic distribution for all licensee responses.

Imposition completion dates for SIMS reports will be provided to all PMs at some later date by the lead PM.

Sincerely.

1 DennisM.Crutchfield,

~ctor Division of Reactor Pro cts - III, IV, Y and Special Projects

[

Enclosure:

As stated i

l l

7 4

s i

OMB No.: 3150-0011 NRCS 87-02. Supplement 1 f

i UNITED STATES I

NUCLEAR REGULATORY C0001!$5!0N i

I 0FFICE OF NUCLEM REACTOR REGULATION i

WASHINGTON. D.C.

20555 l

j April 22, 1988

~

NRC BULLETIN N0. 87-02. SUPPLENENT 1: FASTENER TESTING TO DETEIDt!NE CONFORMANCE WITH APPLICA8LE I

1 MATERIAL SPECIFICATIONS i

j Addressees:

I

J All holders of operating licenses or construction permits for nuclear power reactors.

j U22E:

j The purpose of this supplement is to require addressees to submit additional infomation on the source of fasteners purchased for use in nuclear power.

plants.

I Descriotion of Circumstances:

j Item 5 of MRC Compliance Bulletin 87-02 requested that all holders of operating licenses or construction permits for nuclear power reactors submit information.

regarding the identity of the suppliers and manufacturers of the safety-related and non-safety-related fasteners selected for testing. After further consider-l ation, the NRC has determined that it needs informat' on renarding the identity of all vendors from which safety-related and non-safety-re' ated fasteners have been obtained within the past 10 years, a reasonable period which will not put undue burden on addressees. This information will assist the NRC in detersin-ing whether nuclear facility fasteners in use have been supplied in accordance j

with their intended use. In addition. this information is needed so that the

=

NRC can properly coordinate infonnation with other government agencies con-l l

corned with problems identified in the quality of fasteners.

Action Required:

Within 90 days from the receipt of this supplemental bulletin, addressees shall provide the following information concerning the procurement of fasteners within the past 10 years:

1.

A list of the suppliers and manufacturers from which safety-related fasteners have been p(urchased, including addresses, and the type of fasteners purchased i.e., the material specifications). For those fastener purchases made from fastener suppliers and/or original equipment manufacturers, any available information concerning the manufacturer or i

sub-tier supplier of the fastener also should be provided.

I M

OU I

l.-

NRCB 87 02, Supplement 1 April 22,1988 Page 2 of 2 2.

For non-safety-related fasteners the same information as requested in item 1.

The written reports requested above shall be addressed to the U.S. Nuclear Regulatory Comission. ATTN: Document Control Gask. Washington, DC 20555, under oath or affirmation under the provisions of Section 182a, Atomic Energy Act of 1954, as amended.

In addition, a copy shall be submitted to the appro-priate Regional Administrator.

This requirement for information was approved by the Office of Management and Budget under a blanket clearance number 3150-0011. Coments on burden and duplication may be directed to the Office of Management and Budget. Reports Management Room 3208, New Executive Office Building Washington, D.C.

20503.

If you have any questions about this matter, please contact one of the techni-cal contacts listed below or the Regional Administrator of the appropriate regional office.

Y f/

Charles E. Rossi, Director Division of Operational Events Assessrdnt Office of Nuclear Reactor Regulation Technical Contacts:

J. L Conway, NRR (301)492-0978 E.T.Bakerf21 NRR (301)492-3

Attachment:

List of Recently Issued NPC Bulletins

Attachment NRCB 87-02. Supplement 1 April 22,1988 LIST OF RECENTLY ISSUED NRC BULLETINS Bulletin Date of g.,

Subject Issuan:e issued to 88-03 Inadequate Latch Engagement 3/10/88 All holdders of OLs in NFA Type latching Relays or cps for nuclear Mahufactured by General power reactors..

Electric (GE) Company 88-02 Rapidly Propagating Fatigue

?/5/88 All holders of OLs Cracks in Steam Generator or cps for W-designed Tubes nuclear power reactors with steam generators having carbon steel support plates.

88-01 Defects in Westinghouse 2/5/88 All holders of OLs Circuit Breakers or cps for nuclear power reactors.

87-02 Fastener Testing to 11/6/87 All holders of OLs Ostermine Conformance or cps for nuclear with Applicable Material power reactors.

Ipecifications 87-01 Thinning of Pipe Walls in 7/9/87 All licensees for Nuclear Power Plants nuclear power plants holding an OL or CP.

86-04 Defective Teletherapy Timer 10/29/86 All NRC licensees That May Not Tenninate Dose authorized to use cobalt-60 teletherapy units.

i 86-03 Potential Failure of Nultiple 10/8/86 All facilltfes ECCS Pumps Due to Single holding an OL or Fa1*ure of Air-Operated (alve CP, ir Minimum Flow Recirculation Line 86-0?

Static '0" Ring Differential 7/18/86 All power reactor Pressure Switches facilities holding an OL or CP.

86-01 Minimum Flow Logic Preblems 5/23/86 All GE BWR facilities That Could Disable RHR Pumps holding an OL or CP.

i OL = Operating License CP = Construction Persit

_ _.