ML20196A979

From kanterella
Revision as of 17:32, 10 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Supplemental Deficiency Rept CP-88-18 Re post-accident Monitoring Channels for Rcs.Initially Reported on 880125. Installation of Third Monitoring Channel for RCS Pressure Rescheduled for Completion by 890320.Unit 2 Unchanged
ML20196A979
Person / Time
Site: Comanche Peak  
Issue date: 12/01/1988
From: Counsil W, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-18, TXX-88821, NUDOCS 8812060158
Download: ML20196A979 (1)


Text

a M

FE Log # TXX-88821

=

File # 10110

=

=

907./,

Ref. # 10CFR1 L55(e) 7UELECTRIC

[*,gg December 1, 1988 V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 POST ACCIDENT MONITORING INSTRUMENTATION SDAR: CP-88-18 (SUPPLEMENTAL REPORT) 1 Gentlemen:

On January 25, 1988, TV Electric's letter logged TXX-88144 notified you of a deficiency involving post accident monitoring channels for the Reactor Coolant 1

System (RCS). Our last supplemental report was logged TXX-88496, dated l

June 14, 1988. This sup)lemental report is submitted to update the corrective action implementation scledule, t

t Installation of a third monitoring channel for RCS pressure and replacement of the four existing T-hot and T-cold recorders with Class 1E indicating recorders have been rescheduled for completion by March 20, 1989.

The Unit 2 completion schedule has not changed.

]

Very truly yours, 91)$) 0-wd)

W. G. Counsil i

By:

f>A >.

a, A R. D."Walker l

Manager, Nuclear Licensing

(

CBC/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 4 GS12060159 681201

{DR ADOCK 05000443 h

l PDC

/ip j

400 North Olin Street LB 81 Dalist, renas 73.Mi l

-