ML20196A979
| ML20196A979 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/01/1988 |
| From: | Counsil W, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-88-18, TXX-88821, NUDOCS 8812060158 | |
| Download: ML20196A979 (1) | |
Text
a M
=
File # 10110
=
=
907./,
Ref. # 10CFR1 L55(e) 7UELECTRIC
[*,gg December 1, 1988 V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 POST ACCIDENT MONITORING INSTRUMENTATION SDAR: CP-88-18 (SUPPLEMENTAL REPORT) 1 Gentlemen:
On January 25, 1988, TV Electric's letter logged TXX-88144 notified you of a deficiency involving post accident monitoring channels for the Reactor Coolant 1
System (RCS). Our last supplemental report was logged TXX-88496, dated l
June 14, 1988. This sup)lemental report is submitted to update the corrective action implementation scledule, t
t Installation of a third monitoring channel for RCS pressure and replacement of the four existing T-hot and T-cold recorders with Class 1E indicating recorders have been rescheduled for completion by March 20, 1989.
The Unit 2 completion schedule has not changed.
]
Very truly yours, 91)$) 0-wd)
W. G. Counsil i
By:
f>A >.
a, A R. D."Walker l
Manager, Nuclear Licensing
(
CBC/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 4 GS12060159 681201
{DR ADOCK 05000443 h
l PDC
/ip j
400 North Olin Street LB 81 Dalist, renas 73.Mi l
-